obtain long term, advancible work in the electrical trade
Job History
09-01-09/10-01-09
Seaside Electric
Carlsbad California
1-760-747-8333
Job: New School of Architecture website
Details: Design Build a Mac Lab and Classroom
Mac Lab: Install 20 isolated curciuts in exposed Emt conduit. Install 16 exposed 2x2 light suspended by aircraft cable.
Classroom: Install 6 branch circuits in exposed Emt conduit. Install 24 exposed 2x4 light suspended by aircraft cable.
Duties: Layout and direct apprentices when they were available. Put in material orders and work self-supervised.
11-08/01-09
Garrett Electric
7720 El Camino Real #b
Carlsbad Ca 29009
1-760-632-1988
Job: St. Kilian Church website
Details: New Classrooms and Cafeteria
Classroom: 24 title 24 classroom with full a/v hook ups and 2x4 lighting
Cafeteria: Full restraint style kitchen with 500 people seating area doubling as a theater
Duties: Install new switch gear and all underground feeds. Design all branch curciuts from multiple panel rooms. Organize manpower for installation of lighting, switching and plugging. Running all of which in Emt pipe including all low voltage stubs and home runs.
02-08/11-08
Gould Electric website
12975 Brookprinter Pl. #280
Poway Ca 92064
1-858-748-2474
Job: Stone Ranch Elementary School website
Details: 6 classroom out buildings and 1 large Admin/Library
Classrooms: 24 title 24 classroom with full a/v hook ups and 2x4 lighting
Admin Building: Large building including Theater, Cafeteria, library and Office admin.
Duties: Run underground 100s ft into panels high/lo voltages. Design lighting layout and all branch curciuts. Organize manpower and material for the 6 classroom units. Run all emt for electrical and fire life safety. All lighting was zoned title 24 coming out of a Main Control room. Most pipe work was exposed and require attention to detail. Operation of heavy equipment was a daily requirement. As well as hydraulic bending and tugging machines. Very fast paced job, probly the fastest I have ever seen in a safe invorment.
Job: McClellan-Palomar Airport website
Details: 3 Buildings to replace old facilities.
Building 1: Security and INS building contained survance room for airport. INS, FAA offices and Holding Cells.
Building 2: Flight terminle for incoming and out going travelers. This includes check in counter, security and waiting areas.
Building 3: empty except for service for future restaurant
Duties: Organize electricians and material orders. My job included underground pipe work, Switch gear and back up generator. All interior branch lighting and power curciuts. All security and building access pipework. All of the building was ran in Met which created a lot of trick pipe runs due to the architectural elements of the building. This job was a very high profile job with city and state officials on site daily. Cleanliness and safety were of the highest priority.
01-05/11-08
Helix Electric website
8260 Camino Santa Fe #A
San Diego CA 92121
1-858-535-0505
Job: M2I website
Details: 260 mid-rise 600-3000sf units
Duties: Layout and roping of units. Layout and piping corridors for lights and fire, life safety. Worked hand in hand with Lighting Designer to re-engineer 2 lobbies and all exterior lights due to a mechanical oversight by the Engineers.
Job: Market Street Village website
Job: A lofts on Cortez Hill website
Job:The Lofts [at]677 Seventh website
Details: 3 Mid-rise buildings throught Downtown San Diego
Duties: During this period I was building 6 switchgears with ups, 6 sets of bus duct, and tons of meter banks for a total of about 800 condo units. Installed 1000s of feet of Cable tray and, an ungodly amount of Emt. Organized multiple crews at 3 sites for sub feed layout and pulling. I organized all material, equipment and manpower proficiently till completion.
Duties: Lead a crew of 10-20 men. Organized layout, material, and manpower. Worked everything from the ground level to roof. I laid out over 20 electrical rooms and all sub feeds into units. Then designed 1 roping print for every style unit and corridor for continuity through out the building. Layout of all gyms, kitchens, staffing areas and so forth. Always tried to work all foreseeable problems out with the other trades before they became an issue. Formed a very good working relationship with the GC which was rewarded via Helix Electric.
Job: Ritz Carlton Maui website
Details: 300 room hotel conversion and upgrade to Timeshare/Resort
Duties: Designed all replacement panels and cable tray. All without losing power to exciting facilities. Organized a single print for all style units and was part of the roping and trim crew.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.