Interested in obtaining employment with a progressive firm that will allow me the opportunity to utilize my managerial experience in architectural design project management and provide professional advancement. My background includes a Bachelors degree in Architecture. Associates degree in Civil Engineering and Construction Project Management. GPA 3.8 Transcripts available upon request.
James P. Fox II
13862 Mirror Lake Drive
Orlando, FL. 32828
OBJECTIVE:
Interested in obtaining employment with a progressive firm that will allow me the opportunity to utilize my managerial experience in architectural design project management and provide professional advancement. My background includes a Bachelors degree in Architecture. Associates degree in Civil Engineering and Construction Project Management. GPA 3.6 Transcripts available upon request.
PROFILE:
Architectural Design Project Manager
• Proven record managing projects in a safe work environment (OSHA).
• Closed projects on time and within budget.
• Ensuring that all subcontractors operate safely through management meetings.
• Implemented an action plan/procedure to control or eliminate all jobsite hazards.
• Coordinated and managed clients, subcontractors, vendors and project teams.
• Consistently found new alternatives in the development of design-build energy savings projects (Green Building, LEED).
• Reviewed plans for accuracy and design for cost and energy efficiency.
• Prepared construction budgets on detailed work and critical path method (CPM).
• Reviewed scope of work, estimated costs, value engineer, reviewed sub contractor/vendor contracts and develop a construction budget.
• Enforced adhesion to an agreed schedule by conducting weekly meetings.
• Prepared accurate, timely and detailed monthly project status reports.
• Created reports on work completed to date, working schedule, deviations from the previous report, subcontractor change orders, customer issues; RFI’s and project changes by client.
• Prepared project management correspondences, customer meeting minutes, team assignments and action item tracking correspondences.
• You can contact me at 9544150112 anytime.
SKILLS:
Software used for projects include; Auto CAD 2008, REVIT 2008, 3D studio max, Solid Works, Adobe Photo Shop, Accu Render, 3D Viz, Primavera Sure Trak Project Manager, Timberline Estimating/Accounting, Windows NT, Microsoft Word, Excel, Outlook, Power Point and Project 2008.
EMPLOYMENT:
FINFROCK INDUSTRIES
Apopka, Florida
SENIOR ARCHITECTURAL DESIGN PROJECT MANAGER
2007 to Present
• United States largest designer, manufacturer and constructor of commercial parking structures, student housing projects and mixed use retail developments.
• Joined the firm when their backlog was enormous and their profitability was declining.
• Managed 6 Associates.
• Completed projects within budget and scheduled time.
• Managed developments using the international and local building codes.
• Responsible for design stages through final close out.
• Responsible for the scheduling, design intent, permit documents, field supervision, inspections and on-site coordination of architectural documents.
• Conducted monthly on-site managerial meetings with the owners and sub contractors.
• Responsible for creating field reports, RFI’s and monthly developmental project reports.
• The result of my actions increased profitability by 30% and eliminated their backlog.
• The department was taken to a new level by setting new standards in their operating procedures.
• This allowed time for the company to expand into new areas of construction by focusing on unique ways to save time and money in the production and construction of commercial buildings.
FUGLEBERG KOCH ARCHITECTS Orlando, Florida
DESIGN PROJECT MANAGER I
2006 to 2007
• Company completed over $12 billion in building volume which included over 250,000 multi-family dwelling units and 30,000 resort accommodations some internationally, as well as commercial, industrial, and institutional buildings.
• Used strong project management image / presence, to bring out the creativity in my team.
• Managed 5 Associates and 2 Job Captains.
• Managed developments of Hotels, Hospitals, Educational Facilities and Retail centers.
• Responsible from the design stages through close out.
• Direct liaison between the clients, building departments and operational staff.
• Managed developments using the applicable building codes and the city’s requirements.
• Conducted field inspections, framing walks.
• Responsible for on-site coordination of architectural documents with sub-contractors.
• Conducted monthly on-site managerial meetings with owners and field project managers.
• Responsible for creating field reports, RFI’s and monthly developmental project reports.
• The result of my actions tripled the profits for the company.
TOLL BROTHERS INC. Orlando, Florida
STUDIO DESIGN LEADER WEST COAST 2002 to 2006
• Fortune 500 company and the successor to three generations of home builders.
• Publicly owned company; whose stock is listed on the New York Stock Exchange.
• Managed 8 Auto CAD Associates, 1 Job Captain and 1 Senior Job Captain.
• Responsible for the daily operations of 14 developments on the east coast of Florida.
• Responsible for project tracking, project reports and daily operational procedures.
• Responsible for field inspections, framing walks, on-site coordination of architectural documents with the Project Managers and sub-contractors.
• Direct liaison between the corporate office and project managers.
• Conducted monthly staff and on-site managerial meetings.
• The result of my actions reversed a profit decline in the community developments on the east coast through strategic planning and innovative scheduling in structural decencies and plan review.
• Over a 4 year period, added approximately 6 million to the bottom line.
GARCIA BRENNER STROMBERG ARCHITECTS
Boca Raton,Florida
1996 to 2002
DESIGN PROJECT MANAGER
• Internationally renowned, award winning architectural firm.
• The companies backlog was enormous; however, their profitability was increasing.
• Responsible for designing and completing final construction documents to code.
• Used the Florida and International Building Codes for each development.
• Developed from preliminary design stages to complete permit construction documents.
• Managed multiple developments on a daily basis with no supervision.
• Completed each development within the allowed scheduled time and within budget.
• Responsible for the design, the company received the Prism Award for 1999, 2000, 2001, and received the Aurora Award for 2002.
• Possessed richly varied project manager experience and have consistently exceeded the company’s objectives by achieving double digit gains in revenues and profits for the firm.
COMMUNITY:
Member Green Building Council (USGBC) (LEED)
Member Chamber of Commerce.
Volunteer Big Brother/Big Sister.
Member Toastmasters International.
MILITARY:
United States Coast Guard Alexandria, VA.
P.O. 2nd Class Aviation Survival Man
1978 to 1981
EDUCATION:
Edison Community College
Fort Myers, FL.
Associates in Construction Project Management
1988 to1990
Northern Virginia Community College
Woodbridge, VA.
Associates in Civil Engineering 1986 to1988
Massachusetts Institute of Technology
Cambridge, MA.
Bachelors in Architecture
1981 to1986
REFERENCES:
Available upon request.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.