To seek opportunities in the construction or any related fields performing duties associated with Project Manager, Estimator, Superintendent or Assistant Superintendent.
CURTIS J. HILL
22452 W. Smiley Court, Santa Clarita, Ca 91350
Residence Phone: 661.297.1977, Cellular Phone: 661.713.7256
Email: smileyhills[at]sbcglobal.net
PROFILE
Hands-On Professional with over 30 years of experience in Construction Development and Management is seeking positions in Project Management, Construction Management, Estimating or Field Superintendent work.
AREAS OF EXPERTISE
Construction Background (Values of Projects Range Between $3-Million to $230-Million):
COMMERCIAL & RESIDENTIAL – Structural Steel & Wood Framing (Type V), Reinforced Concrete & Masonry (Podium Construction), MEP, Glazing, Interiors, Ornamental Iron, Streetscaping & Landscaping.
EXTERIOR BUILDING ENCLOSURES & AESS SYSTEMS - Cable Tension & Cable Truss Backer Systems for Glazing, Steel Truss Frame Enclosures, Tension Fabric Enclosures.
PUBLIC WORKS – Wet & Dry Utilities Demo & Installation, All Streetwork, Including AC Paving, Curb & Gutter, Streetlight & Signalization.
PETRO-CHEMICAL – Refineries, Utility Plants, Power Plants, Gas, Petroleum & Utility Pipelines.
Management & Administration Skills:
- Client Satisfaction
- Project Startup
- Developing Relationships with OAE and Local Government Officials
- Project Drawings and Specifications Evaluation and Distribution
- Material Takeoff and Procurement
- Estimating and Job Costing
- Value Engineering
- Planning and Maintaining Schedules
- Critical Path Construction
- All Phases of Permitting and Inspections
- Subcontractor and Materials Selection
- MSDS Verification and Compliance
- Contract Development and Finalization
- OSHA Project Site Safety and Compliance
- SWPPP (Storm Water Pollution Prevention Program) Site Requirements
- Subcontractor Billing and Budget Analysis
- RFI, Submittal and Change Order Evaluation and Resolution
- Compliance with all Building Codes and Regulations
- Quality Control Management
- Project Closeout / Certificate of Occupancy
Computer Skills:
- Proficient in Microsoft Office Word, Excel, Projects, PowerPoint, and Outlook.
- Proficient in Timberline Construction Management Program.
- Proficient in Primavera Expedition Construction Management Program.
- Proficient in Prolog Construction Management Program.
- Proficient in Parsons Document and Material Control Systems (DMCS) Program.
Current Certifications:
- Caltrans Stormwater Pollution Prevention (SWPPP) Certification for Construction SWPPP Preparation Training.
- OSHA Certification for Construction Safety & Health.
Previous Certifications:
- International Conference of Building Officials (ICBO) Special Inspection Certifications for Structural Steel Welding and Reinforced Concrete
- Los Angeles City and Los Angeles County Special Inspection Certifications for Structural Steel Welding, High Strength Bolts, and Pneumatic Fire Protection
- Ultrasonic Technician Level II Certification through Smith-Emery Company, Los Angeles, CA
Education:
- Crescenta Valley High School – La Crescenta, CA (HS Diploma)
- College of the Canyons – Santa Clarita, CA (Welding, Real Estate)
- Pasadena City College – Pasadena, CA (Piping Design)
REFERENCES
- Dan Ward, Project Manager, JH Snyder Contracting – 909.213.0223
- Michael Busa, Vice President of Residential Construction – 323.857.5546
- Shaughan Murphy, Project Superintendent, Westport Development - 626.348.7524
- Mick Farrell, President, Trussworks, Inc. – 562-868-5930
- Bob Hay, Lead Inspector, Smith Emery Company – 213.749.3411
KEY PROJECTS
Ontario Town Center – Kincaid Series Townhomes – 140 Units, 3 Level, Type V Construction onto Slab-on-Grade. The Colony at Ontario Town Center Apartments – 160 Units, Type V Construction over Multi-Level Podium Parking – Ontario, CA (Feb. 2007 to Oct. 2008)
Hikari Residential Apartments and Commercial Leasing Lobby – 128 Units, Type V Construction over Multi-Level Podium Parking – Los Angeles, CA (July 2005 to Feb. 2007)
Casino Morongo – Steel Grid-Shell Space-Frame Entryway - Cabazon, CA. (May 2004 to July 2005)
America West Arena - Exterior Glass Wall Steel Cable-Truss Backer System - Phoenix, AZ. (Oct. 2002 to August 2004)
Reclaimed Water Pipeline Installation, Geysers Recharge Project– Santa Rosa, CA (May through October 2002)
KEMYA & AARAMCO Refineries – Saudi Arabia (Various times between 1975 through 2002)
Alaska Pipeline Modules – Tacoma, WA (Various times between 1975 through 2002)
EMPLOYMENT HISTORY & BREAKDOWN OF PERFORMANCE DUTIES
JH Snyder Contracting, Los Angeles, CA
Assistant Project Manager – 1 year, 9 months (Feb. 2007 – Oct. 2008)
Assistant Project Manager of Multi-Unit Townhomes (140 Units), 3-Level, Type V Construction, Mixed-Use Apartment and Commercial Lobby Leasing area (160 Units, Type V Construction over Sub-Level Podium Parking) and Offsite Street Improvements (AC Paving, Curb, Sidewalk & Gutter) and Above/Below-Ground Utilities (Electrical, Water, Stormwater and Sanitary Sewer Systems)
Responsibilities included coordination of design and drawing production, evaluation and analysis of architectural and structural drawings and specification, evaluation of vendor estimates and bids, value engineering, preparation of construction documents, sub-contractor negotiations, evaluation and selection, design and material submittals, purchasing & expediting, project development, scheduling & budget reviews, building code compliance, quality control, change-orders, RFI (requests for information) development and coordination from initial permitting & survey through final certification of occupancy.
Duties performed with the use of Microsoft Office (Word, Excel, Outlook & Project) and Timberline Construction Management software.
Cobalt Construction Company, Simi Valley, CA
Project Engineer – 1 year, 7 months (July 2005 – Feb. 2007)
Project Engineer during erection of Multi-Unit Apartment and Commercial Lobby Leasing area (128 Units, Type V Construction over Multi-Level Podium Parking).
Responsibilities included coordination of design and drawing production, analysis of vendor estimates and bids, preparation of construction documents, client & vendor / sub-contract negotiations, sub-contractor selection, material purchasing & expediting, project development, scheduling & budget review, building code compliance, quality control, change-orders, RFI (requests for information) development and coordination from initial permitting & survey through final certification of occupancy.
Duties performed with the use of Microsoft Office (Word, Excel, Outlook, Project & PowerPoint) and Prolog Management systems.
Advanced Structures, Inc., Los Angeles, CA
Project Manager – 2 years, 9 months (Oct. 2002 – July 2005)
Project Manager for design, engineering, fabrication, delivery & installation of specialized architectural projects incorporating architecturally exposed structural steel (AESS), enclosed glass curtain-wall, space-frame and cable-truss systems.
Responsibilities included coordination of design and drawing production, analysis of vendor estimates and bids, preparation of construction documents, client & vendor / sub-contract negotiations, sub-contractor selection, material purchasing & expediting, project development, scheduling & budget review, building code compliance, quality control, change-orders and documentation through project certification of occupancy.
Duties performed with the use of Microsoft Office (Word, Excel, Outlook, Project & PowerPoint) and Primavera (Expedition) systems.
CH2M Hill, Redding, CA
Title: On-Site Inspector & Client Representative – 6 months (May 2002 – Oct. 2002)
Resident On-Site Inspector & Client Representative during the installation phase of a 2-mile long,
pressurized 48†dia. concrete-lined, concrete reinforced steel reclaimed water pipeline for the Geysers Recharge Project in Northern California (40-miles, total length of pipeline).
Responsibilities included review of design installation drawings, daily monitoring of sub-contractor’s work progress, verification of all field inspection & testing requirements, construction & safety compliance during installation and production of documentation verifying project work progress and compliance with engineering & design drawings, specifications and code requirements. Responsibilities also included coordination with engineering and sub-contractors regarding design & field change-orders and acting as liaison between construction management, local business owners & residents.
Smith-Emery Company, Los Angeles, CA
Title: Special Inspector – 13 years (Various times between Sept. 1984 – Oct. 1997)
On-site Special Inspector of structural steel welding and reinforced concrete for commercial projects in the Los Angeles City and County jurisdictions.
Responsibilities included verification and documentation of visual finish-work quality, compliance with approved construction drawings, specifications, applicable building codes, confirmation of work in accordance with engineering & building department-approved field change-orders and performance of applicable non-destructive testing using Ultra-Sonic (Level II Technician), Mag-Particle and Dye-Penetrant Methods.
Extensive visual inspections and non-destructive testing was performed during seismic retrofit of structural steel frames damaged during the 1994 Northridge, CA earthquake between 1994-1997.
Parsons Corp. / Energy & Chemicals Group, Inc., Pasadena and Arcadia, CA
Title: Sr. Material Control Specialist – 16 years (Various times between Sept. 1973 – March 2002)
Senior Material Control Specialist performing quantity-takeoff, requisitioning, material management and control of all petro-chemical piping members and components in accordance with the applicable design and engineering drawings, specifications and quality-control requirements. Work performed at both home-office and at jobsite locations.
Responsibilities included estimate proposals, scheduling, long-lead item analysis, procurement, expediting, quality control and delivery verification of procured materials to the project site. Additional responsibilities included auditing of shop fabricators for various projects.
Duties performed with the use of Parsons’ Document Material Control (DMCS) and Microsoft Office systems (Word, Excel, Outlook & PowerPoint.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.