Mark T. O’Hara
6360 Kingdom Ave.
Pt St John, FL 32927
Dear Sir or Madam:
Enclosed, please find a copy of my resume and job list describing my skills and qualifications. I pride myself with quality workmanship, ability to coordinate with contractors; and consistently meet or beat completion dates.
As you can see from my enclosed resume and job list my twenty plus years experience in the Construction field covers Commercial, Industrial, Retail, Built-outs, and Government Facilities and renovations. I can interface with contractors, sub-contractors, and work well with others on a job, and can work independently as required.
I would appreciate the opportunity to meet with you, at your convenience, to further discuss my skills and qualifications.
Thank you for your time and consideration.
Sincerely,
\Mark T. O’Hara
PS. I’m very interested in your company
Mark T. O’Hara
6360 Kingdom Avenue
Pt. St. John, FL 32927
(321) 749-7222
SUMMARY OF QUALIFICATIONS
• Thirty years of experience in the Construction Superintendent Cost Control, Scheduling, Carpentry and Contract Administration.
• Commercial, Industrial, Retail, Build-outs and Government Facilities and renovations.
• Supervised personnel and Sub-contractor to ensure all divisions and local building codes are met, resulting in quality facilities.
• Metric and hand set forms for cast in place concrete.
• Follow all Occupation Safety and Health Administration, State, County and Local Safety Standards.
• Consistently provide Management with up-to-date costs and completion dead lines.
• Steel Structures and Concrete Foundations.
• General knowledge of Utilities, Electric, HVAC and Plumbing.
• Special Architectural effects, Effis, Styrofoam, Cast in place (Decorative Reveal).
• Military Bases, Sites and Control Centers
EDUCATION/TRAINING
• 10 & 30 Hour OSHA Course.
• U.S. Army Corps of Engineers Training Course – Construction Quality Management for Contractors, Fort Hood, Texas
• American Red Cross, Brevard County, Florida – Adult CPR; Community First Aid and Safety
• Computer Skills: Microsoft Office, Citrix
• Brevard Community College – Completed two years of Vocational College in the Blue Print Reading, Estimating, Foundation and Structure Building Design.
PROFESSIONAL EXPERIENCE
R. C. Stevens Construction Company, Orlando, FL
Superintendent (3/2005 – 3/2008)
• Remodeled two story bank building in downtown Orlando, FL.
• Built new West Entrance to Walt Disney World, Orlando, FL.
• Managed and coordinated retro-fit of McArthur Dairy in Miami, FL.
• Coordinated and scheduled sub-contractors.
Orlacon General Inc., Orlando, FL (for Jacobs Construction)
Lockheed Martin Consolidation and Renovation, Defense Government Contractor
Superintendent (8/2003 – 8/2004) and (2/1987 – 11/1991)
• Managed construction of multi million dollar project; multi-tasks and fast track pace.
• Security Clearance (Construction)
• Negotiated on-site change orders and up-coming tasks.
• Coordinated subcontractors and company employees.
• Completed all tasks on time (mandatory requirement).
RESUME – Mark T. O’Hara
Page 2 of 2
The Scales Company Inc., Cocoa Beach, FL
Superintendent (9/2002 – 11/2003)
• Managed and coordinated construction of $3M built-out designs.
• Built 24,000 square foot La-Z-Boy Furniture Store in Ocoee, Florida.
• 3,000 square foot build-out expansion for a La-Z-Boy store in Naples, Florida.
• 8,000 square foot expansion and renovation in the front desk and office area of the Wakula Motel located in Cocoa Beach, Florida.
• Coordinated subcontractors and company employees.
Azteca Enterprises Inc., Dallas, TX
Project Superintendent (8/1999 – 4/2002)
• Managed and coordinated construction of multiply sites -$4M.
• Built Bombing Sites/Remote Sites/Control Centers through the Corp. of Engineers for the Air Force.
HM2 Corporation, Titusville, FL
Project Superintendent (2/1998 – 8/1999)
• Managed and coordinated construction of water treatment plant $25M.
• Multi structures on-going
• Coordinated subcontractors and company employees.
National Constructors Inc., Miami, FL
Project Superintendent (1/1996 – 2/1998)
• Managed and coordinated construction of $5M.
• Built a 10,000 square foot office facility in Caruthesville, Missouri.
• Built 800,600 square foot cotton warehouse, metal building in Arbyd, Missouri.
• Coordinated subcontractors and company employees.
Honeymoon Hill, Merritt Island, FL
Vice President of Commercial Construction (2/1990 – 10/1995)
• Managed and coordinated construction of $5M.
• Built Hydro-Aluminum 30,000 square foot factory in Rockledge, Florida.
• 6,000 square foot Sheriff Maintenance Facility in Cocoa, Florida.
• Coordinated and scheduled subcontractors.
PROJECT LIST
Mark T. O’Hara
6360 Kingdom Avenue
Pt. St. John, FL 32927
(321) 749-7222
• McArthur Dairy, Miami, FL - Managed and coordinated retro-fit 30,000 square foot conveyor system, controlled environment, for distribution center.
• McArthur Dairy, Miami, FL remodeled first and second floor office building, 10,000 + square foot. Combined project $12 million +.
• West Entrance to Walt Disney World, Orlando, FL, $1 million +
• Remodeled two story bank at downtown Orlando, FL, $700,000 +
• Defense Plant, Orlando, FL; Concrete, Steel, Multi-task, $5 million.
• La-Z-Boy, Ocoee, FL; Block, Steel, Effis, 24,000 square foot, $2 million.
• La-Z-Boy, Naples, FL; Build-out, 3,000 square foot, $175,000.
• Wakula Motel, Cocoa Beach, FL; Block, Effis, 8,000 square foot, $500,000.
• Air Force Bombing Site, Snyder, TX; $4 million.
• Office Building, Caruthersville, MO; 10,000 square foot, $5 million.
• Cotton Warehouse, Arbyrd, MO; Metal Building, 800,600 square foot, $5 million.
• Factory, Rockledge, FL; Metal Building, 30,000 square foot, $5 million.
• Sheriff Maintenance Facility, Cocoa, FL; Metal Building, 6,000 square foot, $500,000.
• Wastewater Treatment Plant, Cape Canaveral, FL; Concrete, Piping, $22 million.
• Water Treatment Plant, Cocoa, FL; Concrete, Piping, $25 million.
• Water Treatment Plant, West Melbourne, FL; Concrete, $3.5 million.
• Wastewater Treatment Plant, Melbourne Beach, FL; Concrete, RCP, Piping, $3 million.
• Office Building, Melbourne, FL; 5 story, Steel Frame, Concrete, 203,500 square foot, $2.5 million
• Schools, Daytona Beach, FL; Remodel, Block, Concrete (Elementary, Middle, High School, and College), $3 million.
• Easter Seals, Palm Bay, FL; Block, Steel, 40,000 square foot, $2.5 million.
• Strip Mall, Melbourne, FL: Tilt Wall, 120,000 square foot, $3 million.
• Strip Mall, Ft. Lauderdale, FL: Tilt Wall, 120,000 square foot, $2.5 million.
• Office Center, Houston, TX; Tilt Wall, 40,000 square foot, $2.5 million.
• Naval Warehouse, Kings Bay, GA; Concrete, Steel, $23 million.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.