James Dungan
13829 Lullaby Rd.
Germantown, MD 20874
301-540-5206
JDungan834[at]Aol.Com
Objective: Utilize my knowledge, background and 25 years of experience to obtain a Superintendent position in the construction field.
Work Experience:
9/2008 – 3/2009 Commercial Superintendent
John J. Kirlin Special Projects LLC.
515 Dover Road
Rockville, MD 20850
Awarded 3.2 million dollar contract for the removal of mold and HVAC repairs in the barracks located at Fort Detrick. In charge of and responsible for the overall supervision and management of a full team of vendors, contractors and sub-contractors. Tracked and documented vendor, contractor and subcontractor staffing levels. In charge of coordinating the inspection process and inspecting the quality of workmanship. Attended and actively participated in workload and process meetings with the US Army Corps. Researched and drafted responses for requests for information (RFIs). Responsible for drafting and submitting updates to the superintendents daily report. Held weekly safety meetings with the subcontractors. Cognizant of local building codes and regulations. Enforced JJK’s and US Army Corps Guidelines and Regulations. Tracked subcontractor’s submittals. Worked with local vendors to identify and minimize long lead items. Generated punch lists for the US Army Corps. Maintained job site safety and cleanliness at all times. Work was completed on time and ahead of schedule.
Awarded 2.4 million dollar contracts for multiple construction projects at the locations listed below:
3/07 to 8/07 American University Watkins Executive Center Renovations $473,000
9/07 to 12/07 First Virginia Community Bank Renovations $724,000
12/07 to 1/08 McLean Office Center Tenant Renovations $350,000
1/08 to 3/5 Coles Martial Arts Studio Tenant Renovations $250,000
2/08 to 3/08 Montrose Metro 2nd floor Rest Room and Corridor Renovations $225,000
3/08 to 5/08 CPS Tenant Renovations $120,000
4/08 to 5/08 Dr. Perman Tenant Renovations $50,000
5/08 to 8/08 American University Bender Library Vestibule Renovations $215,000
In charge of coordinating the inspection process and inspecting the quality of workmanship. Accountable for the overall scheduling and management of contractors, sub-contractors and vendors. Tracked and documented contractor and subcontractor staffing levels. Attended and actively participated in workload and process meetings with the Owners, Clients, Engineers and Architects. Researched and drafted responses for requests for information (RFIs). Responsible for drafting and submitting updates to the superintendents daily report. Held weekly process and safety meetings with the subcontractors and PM’s. Cognizant of local and state building regulations and requirements. Enforced Korth/Abramson’s and Owners Guidelines and Regulations. Tracked subcontractor’s submittals. Worked with local vendors to identify and minimize long lead items. Generated punch lists for the Owner/Client. Maintained job site safety and cleanliness at all times.
James Dungan
13829 Lullaby Rd.
Germantown, MD 20874
301-540-5206
JDungan834[at]Aol.Com
9/2005 - 3/2007 Commercial Superintendent
Grunley Construction
15020 Shady Grove Rd.
Suite 500 Rockville, MD 20850
Awarded 9.3 million dollar contract for multiple construction projects at the locations listed below:
9/05 to 12/06 USDA Mail Room Renovation $8,580,000
7/06 to 11/06 National Archives Theater Flood Damage repairs $450,000
12/06 to 04/07 Department of the Interior Skylight Insulation $350,000
Responsible for the layout of USDA blast proof screening room & loading dock. Responsible for the completion of Phase 2A’s and Phase III punch lists. Supervised the proper clean up and removal of all asbestos and lead paints in accordance with local state environmental guidelines and restrictions. Managed the soil and concrete testing. Tracked and documented contractor and subcontractor staffing levels. In charge of inspecting the quality of workmanship and coordinating the inspection process. Accountable for the overall scheduling and management of contractors, sub-contractors and vendors. Attended and actively participated in workload and process meetings with the Owners, Clients, Engineers and Architects. Researched and drafted responses for requests for information (RFIs). Responsible for drafting and submitting updates to the superintendents daily report. Held weekly process and safety meetings with the subcontractors and PM’s. Cognizant of local and state building regulations and requirements. Enforced Grunley’s and Owners Guidelines and Regulations. Tracked sub-contractors submittals. Worked with local vendors to identify and minimize long lead items. Generated punch lists for the Owner/Client. Maintained job site safety and cleanliness at all times.
5/2000 – 9/2005 Commercial Superintendent
Clark Construction Group
7500 Old Georgetown Rd.
Bethesda, MD 20814
Awarded multi-million dollar contracts for multiple construction projects at the locations listed below:
5/00 to 9/00 Willard Hotel; remodeled 430 rooms $4,350,000
9/00 to 5/01 Greensboro Center; Office spaces $1,450,000
5/01 to 7/02 Pepco Building; Tennant Fit Out & Art Gallery $7,890,000
8/02 to 4/03 Willard Office Building Remodel 26 gang bathrooms $890,000
12/02 to 4/04 Preferred Offices $355,000
4/03 to 5/04 Kennedy Center Opera House Dressing Room Renovation $14,250,000
6/04 to 9/04 Trinity Center Build out $553,000
9/04 to 8/05 One Liberty Center Tenant fit-up $13,150,000
12/05 to 8/05 Navy Federal Credit Union $750,000
Created and maintained a project schedule. Tracked and documented contractor and subcontractor staffing levels. In charge of inspecting the quality of workmanship and coordinating the inspection process. Accountable for the overall scheduling and management of contractors, sub-contractors and vendors. Attended and actively participated in workload and process meetings with the Owners, Clients, Engineers and Architects. Researched and drafted responses for requests for information (RFIs). Responsible for drafting and submitting updates to the superintendents daily report. Held weekly process and safety meetings with the subcontractors and PM’s. Cognizant of local and state building regulations and requirements. Enforced Clark’s and Owners Guidelines and Regulations. Tracked sub-contractors submittals. Worked with local vendors to identify and minimize long lead items. Generated punch lists for the Owner/Client. Maintained job site safety and cleanliness at all times.
James Dungan
13829 Lullaby Rd.
Germantown, MD 20874
301-540-5206
JDungan834[at]Aol.Com
4/1995 - 5/2000 Commercial Superintendent
Buchanan Construction Company
9500 Comprint Ct.,
Gaithersburg, MD. 20877
Accountable for the overall scheduling and management of contractors, sub-contractors and vendors. Tracked and documented contractor and subcontractor staffing levels. In charge of coordinating the inspection process and inspecting the quality of workmanship. Attended and actively participated in workload and process meetings with the Owners, Clients, Engineers and Architects. Researched and drafted responses for requests for information (RFIs). Responsible for drafting and submitting updates to the superintendents daily report. Held weekly process and safety meetings with the subcontractors and PM’s. Cognizant of local and state building regulations and requirements. Enforced BCC’s and Owners Guidelines and Regulations. Worked with local vendors to identify and minimize long lead items. Generated punch lists for the Owner/Client. Maintained job site safety and cleanliness at all times.
Responsible for the overall scheduling and management of contractors, sub-contractors and co-workers.
In charge of coordinating the inspection process and inspecting the quality of workmanship. Coordinated and oversaw the inspection process. Attended and actively participated in process meetings with the Owners, Clients, Engineers and Architects. Researched and drafted responses for requests for information (RFIs). Responsible for drafting and submitting superintendent’s daily reports. Held weekly process and safety meetings with the subcontractors and PM’s. Enforced Bilmin’s and Owners Rules and Regulations. Tracked subcontractor’s submittals and monitored long lead items. Generated punch lists for the Owner/Client. Maintained job site safety and cleanliness at all times. Authorized subcontractor change orders and payments. Responsible for labor and material takeoffs. Responsible for preparing and submitting proposals for General Contractors. In control of labor and material takeoffs.
Computer Skills:
Windows XP & Vista
MS Word 2007
Excel 2007
Sure Track Project Manager 3.0
Training/Certifications:
30 Hour OSHA Safety Course
Red Cross First Aid and CPR
ASHE Certification
US Army Corps of Engineers Certification
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.