John E. Bartecchi / TEK Consultants
262 Union St. Weymouth, Ma. 02190
Ph 781- 467-9025
Management Professional
Throughout the last 3 decades, many challenging and competitive projects have been designed, budgeted, value engineered, procured, detailed and constructed as a result of the development of diverse management qualifications, resulting in the overall success of every endeavor.
The constant variety of building types and responsibilities have produced a steady, solid knowledge and experience base which can be applied to any management application.
Experience Highlights
2007 – Present Bovis Lend Lease Carnegie Abbey
Recruited through the Structural Engineer for ability to manage the logistics of the hi-rise concrete structure from the standpoint of overall supervision and project management.
2006 – 2007 Urbanica Development D4 Condominiums
D4 Condominiums was a stalled, overbudget and behind schedule GMP project.
As Construction Manager, revised budgets and schedules presented to lending institution and development partners, re-evaluation and re-procurement of all subcontractors and full time management and supervision of the construction process resulted in a resounding success of a potential major failure.
2004 - 2006 Suffolk Construction Liberty Place / Westin Hotel
Charged with the responsibility for the coordination of the logistics to complete two complex hi- rise concrete structures within zero lot line sites.
1997 – 2004 TEK Consultants Self – Employed
An ability to act as a liaison between design and building personnel developed into a consulting company that grew to three employees performing various functions including full scope DD and final design reviews, budget and construction estimates, shop drawing review and processing, field inspections and Owner Representation.
As consultants, TEK processed 5.5 Million sf of space with a volume of $1.3 Billion.
2003 – 2004 Town of Abington, Ma.
Commissioned as the Inspector of Buildings during Zoning Redistricting
Responsible for inspection and approval of all building and zoning activities during this period.
1987 – 1997 D’Agostino Associates Mason / General Contractor
Hired as an Estimator/ Project Manager for a Masonry Subcontractor with an annual volume of
$15 Million, was instrumental in building a General Contracting division with an annual volume of
$25 Million performing the duties of Senior Estimator/Senior Project Manager/General Superintendent.
Education / License
Bachelor of Science in Civil Engineering, 1978 - Northeastern University
City of Boston – ABC (Unrestricted)
CHRONOLOGICAL PROJECT LIST JOHN BARTECCHI
Project Name / Bldg Descrip Value Position Held
Carnegie Abbey – Portsmouth RI
Cast in Place 24 Story Condominiums
225,000 SF 80 M (2008) Senior Supt/Project Manager
YooD4 Condominium Conversion
Existing Historic Bldg Renovation
50,000 SF 20 M(2006) Construction Manager/Project Manager
Superintendent
Westin Hotel – Providence
Cast in Place 30 Story Hotel/Condos
550,000 SF new Construction 150 M (2005) Senior Supt/Project Manager
Liberty Place - Boston
Cast in Place 30 Story Apartments
750,000 SF New Construction 130 M(2004) Senior Supt/Project Manager
Wachusett Regional High School
Additions / Renovations Budget Estimator / Design
380,000 SF Total 55 M(2003) & Construction Consultant
Algonquin Regional High School
Additions / Renovations Budget Estimator / Design
325,000 SF Total 50 M(2003) & Construction Consultant
Town of Hanover , Ma. Budget Estimator / Design
Library / Police Station(New Construction) & Construction Consultant /
50,000 SF Total 5 M(2002) Owner’s Representative
Marshfield School System
Additions / Renovations Budget Estimator / Design
225,000 SF Total 30 M(2000) & Construction Consultant
Townhouse Condominiums
Hingham , Ma. - New Construction Budget Estimator / Design
12 Bldg – 60,000 SF Total 5 M(1998) & Construction Consultant
Clinton School System
New School – Renovations to Exist Senior : Estimator / Project
200,000 SF Total 20 M(1997) Manager / Superintendent
Watertown School System
Additions / Renovations Senior : Estimator / Project
150,000 SF Total 12 M(1995) Manager / Superintendent
Federal Government
Fort Devens Senior : Estimator / Project
Renovate 4 Buildings 14 M(1991-94) Manager / Superintendent
100,00 SF
Otis ANG Base
Renovate 2 Buildings
40,000 SF
Newport Naval Base
Renovate 10 Buildings
500,000 + SF
Wildlife Preserve – Sudbury
Timber Bridge across Sudbury River
UPS Facility – Norwood Bowdoin Construction
Interior Renovations – 5 Acre Site 3 M(1986) Superintendent / Project Manager
SETRA Systems – Acton Bowdoin Construction
Additions / Renovations Light Mfg 1 M(1985) Superintendent / Project Manager
Four Seasons Hotel – Boston
Cast in Place 15 Story Luxury Hotel GBH Macomber
700,000 SF New Construction 85 M(1983) Area Superintendent
Milford Whitinsville Hospital
Additions / Renovations GBH Macomber
150,000 SF Total 12 M(1981) Superintendent / Field Engineer
New Haven Water Co.
(2) New Water Treatment Plants Associated General Contractors
25 MGD Each 25 M(1979) Superintendent / Field Engineer
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.