I am currently employed at R.J. Taylor Welding And Construction as a Superintendent in the Uintah basin. Due to down sizing and lack of projects, I am currently seeking employment elsewhere. I have a proven background in the pipeline industry. I would like to continue to further my career as a pipeline superintendent/manager with a stable and reputable contractor. As a testament to my leadership and knowledge I have a large following of qualified personnel, which includes foremen, rig welders, operators and laborers.
Work History
May 2007 to Present
R.J. Taylor Welding And Construction
Rifle, CO.
Title
Superintendent
Duties
As superintendent I was in charge of all day to day activities, including hiring of all personnel, keeping track of man hours, progress and cost control. Scheduling of maintenance on equipment, screening and hiring of all sub-contractors, scheduling work for various clients and procurement of materials. Overseeing numerous crews, solving discrepancies in isos and line maps, tracking of all overages on bidded projects.
Projects
Chapita Underground, Anadarko
Installation of more than 30,000 ft. of various sizes of pipe and fittings, including 36†slug catchers and 24’’ and 20’’ pig receivers, electrical concrete duct banks, bullet tanks and load out pumps. This was an estimated 14 million dollar project.
Other Anadarko projects
White River to Chapita 16’’ and 20’’, 6.5 miles of pipe with launcher and receiver barrels.
Bitter Creek to South Compressor 16’’, consisted of 6 miles of 16’’ including launcher and reciever barrels.
Chapita to Bonanza 8’’ngl line, 15 miles of 8’’ pipe through very rugged terrain and brutal winter weather.
Medicine Bow Treater Plant 20’’ interconnect, 20’’ 1000 wall pipe, connecting old plant to new.
Other clients I have completed projects for include
Questar
QGM
XTO Energy
Panhandle Eastern
Williams
Encana
Southern Star
BP Amoco
Sinclair
Other Work History
Jan. 1990 to March 2007
H.D. Griffin Co.
Carrollton MO.
Title
Supervisor
Duties included
Through the many years at Griffin Construction I worked in various positions. I started as a laborer and through hard work and dedication to my career, I advanced to supervisor after a few years. My duties included operation of heavy equipment, engineering and bending pipe for ditch, Hydro-testing of existing mainline pipe. Supervision of direction drilling projects, stringing pipe for mainline construction, and numerous other projects.
Education And Other Qualifications
Numerous OQ and safety certifications
High School Diploma
Welding Procedure Knowledge
Cost Tracking of projects
Pipe Engineering and Bending
Ability to read and understand isos and line maps
Fabrication of piping plans and drawings
Full knowledge of equipment operation
References
Lynn Silcox
General Superintendent for R.J. Taylor Construction
Phone (435) 823-1949
Roscoe Heyman
Project Supervisor for Anadarko
Phone (432) 425-3942
Jim Tilton
Area Manager for Southern Star Energy
Phone (816) 830-1188
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.