BACKGROUND SUMMARY
Strong communicator, self motivated, team player, capable of managing all aspects of complex projects, with over 18 years of combined experience in the design & construction of FEMA, private and municipal water and wastewater treatment plants, pump stations and co-generation systems for recovery of distillate from industrial grade wastewaters. I have additional experience in Business Development Management (BDM) utilizing software like Dodge Reports, Reed Construction Data and Onvia. For outside sources of conducting business development I regularly communicated with DOT, Army Corp of Engineers, FEMA, Local and Government Municipalities. Considerable capabilities in the following:
Project & Construction Management Construction Engineering
Prepare Pay Requests Project Cost Monitoring & Control
Change Order Validation Contract Administration
Estimating Piping/Mechanical Design
Quality Inspection Startup and Operation
AREAS OF EXPERTISE
Project and Construction Management of large and small scale projects, overseeing all activities, including design, complete project estimate and bid process, project planning, scheduling, purchasing, subcontract negotiations, contract changes, cost control, and startup & operations. Excellent track record of completion and closure of difficult projects and dispute resolution avoidance. Practiced in installation inspections and quality assurance.
SELECTED ACCOMPLISHMENTS
• Accelerated construction of a $54M 6 MGD Wastewater Treatment Plant project, completing project 4 months early and 4% under anticipated budget. Sanitation District was very pleased with the outcome.
• Estimated and awarded a $36 M Lift Station and Pipeline Project. Worked with Engineer and Owner on a design-build basis for build out and completion of system. Final contract value for this project was decreased to approximately $34.5M a cost savings to the owner in the amount of $1.5M. Project was completed on time.
• Accelerated construction of a $35M 4.0 MGD Water Treatment Facility project was under way and it was $4M over budget and 12 weeks behind schedule due to Metal cost and Procurement issues. Within 9 months of running the project we had made up all the budget overruns and were 3 weeks ahead of schedule. The project was completed 7 weeks early and 2% under anticipated budget.
• Accelerated construction of an $8.4M 1 MGD Wastewater Treatment Plant project, completing project 42 days early and 2% under anticipated budget.
PROFESSIONAL EXPERIENCE
2006 to 2008 W.R. Forde Associates, Richmond, CA Senior Project Manager
Project up to $54 million - (General Contractor – self perform most trades)
Project Scope varies from job to job, Civil related construction disciplines but not limited to the following. Water and Wastewater Treatment upgrades, retrofits and new facilities. Sewer and Storm drainage pump stations refurbishment and Telemetry replacement and/or Upgrades, gravity and force main sewer pipeline repair and replacement projects. Also I am experienced in most civil engineering related construction disciplines.
Duties Include: Construction supervision and daily inspections, cost monitoring & control, Preparation of contract proposals, contract administration P & L statements, Subcontractor/Owner material and equipment supply coordination, construction progress monitoring and schedule enforcement, conduct job site safety meetings, review and approval of monthly project billings, change order validation, analysis and approval, enforcement of construction safety practices. I had frequently communicated and interacted with the City Management and the Public.
2003 to 2006 Veolia Water North America - West, LLC, Richmond, CA Senior Project Manager
Projects up to $24 million - (Design Build General Contractor)
Project Scope consists of 21 Sewer and Storm drainage pump stations refurbishment and Telemetry Upgrades and over Fourteen (14) miles of gravity and force main sewer pipeline repair and replacement.
Duties Include: Construction supervision and daily inspections, on behalf of The City of Richmond, cost monitoring & control, Preparation of contract proposals, contract administration P & L statements, Subcontractor/Owner material and equipment supply coordination, construction progress monitoring and schedule enforcement, conduct job site safety meetings, review and approval of monthly project billings, change order validation, analysis and approval, enforcement of construction safety practices.
2000 to 2003 HDR, Inc., Folsom, CA Project Manager / Inspector
Sacramento Regional County Sanitation District, Sacramento, California
Projects Constructed Value: $36,000,000 – (Construction Management)
Projects scope consisted of two lift stations and 9 miles of gravity and force main sewer pipelines ranging in size of 6†– 102†materials used RCP & HDPE pipe with installation depths to 46’ Depths of up to 46’. The Fruitridge Road Lift Station and Pipeline project also had four (4) railroad crossings and water line relocations, service connections and roadway construction.
Elk Grove Water Service, Elk Grove, California
Project Constructed Value $35,000,000 - (General Contractor)
Project – Design / Construction of 4.0 MGD Water Treatment Facility and 3 major and 16 minor ground water wells.
Duties Include: Field Construction supervision for all phases of the job, conflict resolution, contract P & L statements and change order proposals, preparing pay requests, project cost monitoring & control, preparing and monitoring construction schedules, Submittal Review of Contractor supplied materials, and the coordination of, and attendance at weekly progress meetings, Preparing field memos & clarifications.
1997 to 2000 Wood Rodgers, Inc., Sacramento, CA Project Manager / Civil Inspector
Project Scope consisted on the design of commercial and residential improvements for the Elk Grove Water District
Duties Include: ongoing improvement plan check services, project management and inspection services for all water system improvements for the water agency serving approximately 14,000 service connections. Reviewed current operation and maintenance practices and provided troubleshooting and optimization services related to system operations. Field construction supervision, progress and cost control, Cal-OSHA and FED-OSHA safety rules monitoring & enforcement. Design/Drafting, assistance with the development of company-wide design standards.
1990 to 1997 Cooper Thorne & Associates, Rancho Cordova, CA Construction Project Manager
Project scope consisted of Residential and Commercial projects, Pump Station projects.
Duties include: Construction Management services for residential and commercial projects, related to Sewer and Storm Pumping Stations, Water and Wastewater Treatment Plants, Drafting and designing Improvement Plan sets, Tentative Maps, Slope Maps Tree Preservation Plans, Drafting Cross Sections and Design Plan & Profiles, Grading Plans and exhibits needed by engineering staff.
EDUCATION
CSUS, Sacramento, CA
B.S., Construction Management / 1995
REGISTRATION / CERTIFICATION
Currently enrolled in a PMP certification program thru Boston University, 4/2010
DHS Grade 1 Wastewater Treatment / Operation Certification, CA – 2002
OSHA 10 Hour, 30 Hour Certification – 2008
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.