Robert P Mansfield
Objective: To use my skills as Industrial Electrician
Experience
TIC Steamboat Springs Co
Journeyman Electrician 01/05/2009 to 01/26/2009
• Installed electrical wiring and assembled components in control cabinets, electrical and industrial equipment and related industrial apparatuses.
• Cut, striped, bent and formed wire cable, conduit, pipe and tubing used to connect circuits and subassemblies.
• Terminated electrical cables in control cabinets
Nes USA Overseas Amman, Jordan
Electrical Instructor July, 2007 to Dec, 2007
• Developed and conducted electrical power plant maintenance training programs.
• Trained electrical engineers and technical personal on all phases of power plant electrician maintenance.
• The course material ranged from simple control circuits to high voltage cable repair and splicing.
•
Total Western Cobb California
Electrical Supervisor Nov, 2006 to Feb 2007
• Supervised and managed electrical work on a Geo-Thermal power planet.
• Managed the electrical group and worked with General Contractor/ Owner on site
Southern California Edison / Mohave Generating Station Laughlin, Nv 89029
Maintenance Electrician October, 1985 to Retired Oct 2006
• Maintained the low (4KV) to high voltage (13.8 KV) feeders. Did the low and high voltage splicing on station for motors and transformers.
• Maintain and Install and troubleshoot control circuits from 48 Volt DCS to 125 Volt DC circuits
• Heavy background in relay logic
• Help design and install a new control circuit using an Allen Bradley PLC
• One of several who did the high voltage splicing on station
• Supervised and managed contract personal
• Worked as an upgrade foreman
• Worked as an electrical planner, planning and estimated jobs
• Interpreted specifications, blueprints and job orders to workers and assigned duties.
Allegheny County Department Of Aviation/ Greater Pittsburgh, Pa
Pittsburgh International Airport
Maintenance Electrician / Electrical Inspector May, 1979 to October, 1985
• One of three who did all the low voltage (4KV) and high voltage (13.8 KV and up) cable repairs and splicing.
• Planned layout of and installed, inspected and maintained control systems for the runway lighting.
.• Installed control and distribution apparatus, such as switches, relays and circuit-breaker panels,
Worked also as the electrical inspector at the airport, inspecting
work performed by outside contractors
One of three who did all the high voltage splicing 4KV
Worked as upgrade foreman
•
Sythane Coal Gasification Pilot Plant Bruceton, Pa
Maintenance Electrical Foreman Sept. 1974 to May 1978
• Diagnosed malfunctioning apparatus, such as transformers, motors and lighting fixtures, using test equipment.
• Replaced faulty electrical components of machine, such as relays, switches and motors and positioned sensing devices.
• Followed engineering data, sketches and blueprints.
• Modified parts, assemblies and systems as required.
Education
Dale Carnegie Training
1999
The Dale Carnegie Training is an 8 week course on public speaking
PLC Training
References: Available upon request
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.