Introduction
To whom it may concern
I’ve been in the electrical business for 28 years now. I’ve done a considerable amount of commercial, industrial and new construction project over the years. With each project I’ve pushed to get each one done in a timely manner and within schedule. With my years of experience of doing construction, materials for a project is usually cover in the bid process. The main factor for a project that will make it go over budget is labor. Labor will make or break a project. Knowing this keeping labor down, managing materials, having good communication with the general contractor and all subcontractor’s on the project will assure the project will be completed on timely manner and under budget.
For the last ten years I’ve been in the industrial field as a project manager/industrial tech. In this position my job consisted with bidding the installation of machinery, conveyor systems, control panel designs and relocation of machinery. My position also included billing and order materials for each project. Developing a close relationship with the customer to ensure their satisfaction was one of my main goals. In do so I was always considered for any future projects. This meant that if a company called and I had no tech to send I would go out in the field myself and trouble shoot the machinery and help the customer to get their equipment back in operational order. I’ve done this many times! This usually meant future projects without going thru the bidding process.
Your consideration for your firm would be greatly appreciated.
Thanks
Gene Cronan
GENE CRONAN
POSITION DESIRED
PROJECT MANAGER
SUPER ATTENDANT
ELECTRICAN
SALARY DESIRED $23.00 PER HOUR
PROFILE
Comprehensive experience in the repair and maintenance of motors, control panels, major mechanical and electrical systems (Including variable frequency drives and design and build control panels)
Experience in commercial and industrial electrical wiring, repair and maintenance as well as machine trouble shooting.
Experience in installation of EMT, Aluminum rigid, Rigid, PVC coated rigid and all types of cable tray.
SPECIAL TRAINING
SLC-500 Fundamentals
PLC-5 Fundamentals
Control System Design - Part I
Control System Design - Part II
Backhoe operator
REFERENCES/ EXPERIENCE Date Employed Phone # Contact
Buck’s Electric Inc. 2004-2008 770-836-1290 Randy Buchanan
103 Cable Industrial Way Shane Cater
Carrollton, GA 30117
PROJECTS: Installed controls and power connections for conveyors, crouton packaging systems, Sweet & Low packaging systems, salt & pepper packaging systems, crouton ovens and seasoning systems for Sugar Foods Corporation in Villa Rica GA.
Relocated several machine from California to Inpress Marketing in Villa Rica GA.
Repaired and installed machine and conveyor systems for American Containers Inc. in Carrollton GA
Remodeled and installed power and controls for MCC and refrigeration system along with lighting additions and up date power systems.
Worked on and installed equipment in several plants across Georgia and Alabama.
Atlanta Electric 2002-2004 770-947-8973 Don Clay
Villa Rica, GA 30180
POSITION: Project manager over several large school projects. This position required pay request, transmittals, RFIs, material orders and job meetings with general contractors.
Buck’s Electric Inc. 1997-2002 770-836-1290 Randy Buchanan
103 Cable Industrial Way
Carrollton, GA 30117
PROJECTS: Over seen and installed complete power systems, CATV, Fire Alarm and Intercom systems for several new schools, renovated schools and school additions.
Installed power and controls for the fully automation wet systems for Diamond Crystals in Bremen GA (Wet pack system is where the mixing of ketchup, mustard and sauces are completely done by touch screens)
Installed power and controls for water treatment plant for Diamond Crystals in Bremen GA
Installed and designed power and controls for a water treatment plant for Maple Hurst in Carrolton GA
Major Electric 1996-1997 Went Out of Business
PROJECTS: Demoed complete electrical on a (16) story building in down town Atlanta and renovated it for loft apartments (This project consisted of overseeing an average 80-100 men and ordering materials along with weekly meetings with general contractors and safety meetings)
Muse Electric 1991-1996 Sold out to Major Electric
PROJECTS: Demoed complete electrical on a (8) story building in midtown Atlanta and renovated it for loft apartments (This project consisted of overseeing an average 30 men and ordering materials along with weekly meetings with general contractors and safety meetings)
Overseen several new large school projects, (2) new plants in Lagrange GA and renovation of the court house in Newnan GA
( Additional references from some of the customers of the plants are available on request)
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.