Coming from the field I have acquired an array of skills and experiences in the General Construction field from Pharmaceutical, and Educational facilities, I would like to bring to your team my key attributes and experience, skills and accomplishments to your firm.
SUMMARY OF QUALIFICATIONS
Extensive experience as a General Construction Project Manager / Senior Superintendent with knowledge of Construct-ability Reviews; Demonstrated ability to interface effectively and collaborate with clients, peers, and management teams; Advanced knowledge in all phases of construction field, involving complex analysis, consulting, and providing recommendations to address construct-ability issues, while effectively managing, and monitor schedule, coordinating construction activities; Demonstrated ability to exercise good judgment and be self motivated to take the initiative in coordinating a team of individuals to complete a project under challenging circumstances. Able to demonstrate excellent management mastery, including effective resource and project planning, and decision making,
PROFESSIONAL EXPERIENCE
Senior Project Manager, ESPARZA CONSTRUCTION SERVICES Brea, CA.
08/06 to 1/10 project range: $500,000 -$1,800,000
Implemented cost effective methods and designs in the residential, commercial sectors. Administered
and coordinated project scope of restoration design build, scope definition and program management
projects. Project analysis of fire damaged and remodeling project from design to completion.
Project cost analysis, estimate materials and produce bid packages for private owners and investors.
Address change order, construction directives and place proper manpower for specifics tasks,
Adjust schedules as needed and implement site specific safety programs.
Order equipment on two to four projects at a time.
LAUSD OAR I / II -Project Manager GATEWAY SCIENCE ENGINEERING Pasadena, CA.
04/05 to 08/06 project range: $55,000,000.00 million
Los Angeles Unified School District J.O.C.s, program which consisted of existing facilities
improvements.
Coordinated several projects in safety and technology and LAN / WAN system and project close out on fire alarm systems.
Coordinate with DSA and educational liaisons with project worth near 55 million in total value. Responded to RFC, CD, COP’s and working closely with school personnel, facilitators, and cost control personnel, architects, engineers, schedulers and estimating personnel.
Produce project scope evaluations, assisting in scheduling and the awarding of contracts.
Awarded the responsibility to assist in the Huntington Hospital program for their fast-track tenant improvement projects within the Hospital compound to implement proper ISLM program (Interim Life and Safety) and to assist with and enforcing of new contractor’s safety procedures.
Instrumental in producing their full contractor’s safety manual for these projects.
Construction Manager /Project Manager BOVIS LEND LEASE Los Angeles, CA
03/00 to 04/05
Awarded the following projects ranging in costs from $5 million to $30 million. Responsible for the coordination, management, design build, construct-ability, budgets analysis, and site safety.
Mt. San Antonio College, Walnut, California
Maintain ongoing communication with Department of State Architects. Responded to RFI’s RFC’s CO’s and CD’s as needed.
Daily logs and picture documentation, tracks submittals registry and special inspection requests.
Assisted in the Planning of campus-wide infrastructure program in conjunction to the design build Phase 1 and 2 of the Thermal Energy System Phase that was incorporated in the COGEN Central Plant.
Campus-wide seismic retrofit program. AT&T Cell Site and performed as the primary HUB safety trainer for all superintendents and construction managers to ensure safety awareness
Construction Manager/Project Manager IBA Griffith Micro Science Lab, Vernon, California
Led a $1.5 million Class 1 Division 1 enclosure project for Ethylene Oxide environment, which involved a sterilization chamber, aeration enclosure, explosion proof systems and a 42-foot skid.
Completed nine-month project one week ahead of schedule, resulting in $190,000 in savings, and closely monitoring progress and construct-ability to identify and resolve potential issues.
Construction Manager Arco BP Project , La Palma, California
Headed a $4.5 million dollar fast-track TI (Tenant Improvement) project consisting of shell and core high security systems and office remodeling; conducted daily site meetings, managed deadlines and supervised personnel.
Awarded a crystal plaque from British Petroleum and Bovis Lend Lease global for having a perfect score in site safety and documentation.
CM/ PM Construction Manager, Los Angeles Unified School District, E-Rate Program
Directed one of 15 teams consisting of Network IT personnel, contractors and an ICBO inspector, overseeing infrastructure design across 40 of the District’s 200 schools in accordance with strict network specifications.
Personally visited 10 schools per day to certify fiber optic and copper installation; review construction; resolve problems; oversee PING testing; and ensure proper installation of MDF, LDF and IDF cabinets.
General Construction Superintendent Alpha Therapeutic Los Angeles, CA
Managed $2.5 million project for construction clean room facility.
Reviewed construct-ability and clean room installations. Submitting clean room permits of entry, Daily logs and documentation and pictures. Compiled project turnover packages, procuring supplies and served as site safety officer.
Project Superintendent/Construction Manager TOYOTA MOTORS HEADQUARTERS
Torrance, CA. project range:5,000,000- 15,000,000 06/98 to 08/00
Collaborated with architects, engineers/designers and the construction management team to complete facility high end office renovations in a seventy two hour turn over. Renovation for the executive staff residential housing which consisted of high end living condition for the personal and family’s for the Toyota Engineers. Compiled and completed work orders for several structural projects for Toyota Air Flight Facility.
Superintendent / Construction Mgr. TED R. COOPER/ARMY CORPS OF ENGINEERS
Irvine, CA. 1995 to 1998 project range:3,000,000 to 10,000,000
Coordinated all phases of new construction and tilt-up projects with budgets of up to $25 million; managed materials and equipment procurement, daily status meetings and safety procedures. Held full accountability for construction of four pours and place concrete monolithic barracks of up to 50,000 square feet.
EDUCATION AND TECHNICAL SKILLS: Mt San Antonio College and Fullerton College in CA
Architecture and Construction Technology.
Bovis Lend Lease education training in M.S. Project, Sure Tracks, PROLOG and EH&S program
Arco BP safety programs) (profile): http://www.jobfox.com/people/paulesparza
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.