Experience:
Skanska Building USA Senior Superintendent
Southfield, MI Responsible For:
June 1998 – March 2009 Large Utilities Installation
Value engineering & Constructability review
Contract Management, Client reporting
Field Management, Scheduling, Project Logistics
MEP Coordination, Preventative Maintenance
Commissioning, Cost Management
Construction of facilities from $2 mil - $250 mil. Some projects included - Greektown Casino / Hotel
AAA Michigan 6 megawatt generator facility, Detroit Performing Arts High School, Northville School, Hazel Park Schools, Twelve Oak Mall.
ARC Management & Design Project Manager, Senior Designer
April 1990 – Dec 1998 Responsible For:
Production & Development of Contract Documents (all disciplines)
Consultant Design Coordination
Process Design & Layout
Machine Design, Ergonomic Review and Implementation
Field Management & CPM Scheduling
Production Line Commissioning, MEP Coordination
Cost Management
Preventative Maintenance Program
Facilities Expansions ranging from 15 million to 275 million. Raw goods processing, assembly lines, PLC retrofit / automation, packaging lines, blast freezers, dryer systems, fluidizing systems, conveyors, product delivery systems, clean room testing labs, power expansion, and boiler replacements. Facility reviews, Capital Cost Planning & Requisitions.
University of Western Ontario Project Scheduler, Critical Path Manager
April 1996 – Feb 1997 Responsible For:
Project Analyst
Force Management
Cost Management and Reporting
Internal Force Management - Hired as a consultant to develop internal schedule for staff manpower. Track capital projects within the university programs, and perform cost/job reporting to upper management.
Fanshawe College Instructor, Industrial Apprenticeship Trade School
St. Thomas, Ontario Teaching:
April 1996 – Sept. 1996 Machine Shop – Computers (CPTR069A)
Industrial Maintenance Mechanic – Computers (CPTR190A)
Marketing – Purchasing Applications – (MKTG461)
AutoCAD, Qbasic, Excel, Word, Windows
Instructor: Teaching Industrial Apprenticeship course on computers. CNC programming, AutoCAD, Excel, Word
Lamb & Warman Architects Project Coordinator, Senior Building Technologist
London, Ontario, Canada Responsible For:
May 1987 – Dec 1993 Contract Administration
Coordinate Engineering design development
Production & Development of Contract Documents (all Disciplines)
Supervision of Staff
Project Coordinator: Responsible for coordinating all disciplines, and construction of the contract documents for Owner and City review.
Affiliations:
Association of Architectural Technologist of Ontario
Accredited Architectural Technologist (1995 – 2001)
Ontario Association of Certified Engineering Technicians and Technologists
Applied Science Technologist (2000-2004)
(Civil & Building Design)
Florida State Builder #CBC06235 (2001 – present)
Tau Alpha Pi National Honor Society (2007)
GPA (3.7)
The National Society of Collegiate Scholars (2009)
GPA (3.7)
Education:
Mechanical Engineering Technology Program
Wayne State University
Electrician Diploma, with Highest Honors
International Correspondence School
Locksmithing Diploma, with Highest Honors
International Correspondence Schools
Civil Engineering Science Program
University of Western Ontario
Architectural Technology Program
Fanshawe College
Application Software: AutoCad MicroStation
Word Excel Microsoft Projects Primavera
Partial Project Listing – Scott R. Ellis
Industrial Manufacturing
ï¶ Imperial Leaf Tobacco - $280 Million
o 45 Acre under roof complex. (Renovation & Addition to complex)
o Replacement of all processing lines and conversion to PLC automation
o Inverted building system to maintain 80% RH within processing floor
o Design of processing systems and layout
o 500+ craft workers per day on-site for installation
o Building and line commissioning
o Quality Control testing labs
o Upgrade of steam boilers and Power grid
o Accelerated Schedules
ï¶ Ault Foods - Bathurst Street (Raw Milk & R&D) $45 Million
o Rework of existing bottling and packaging lines
o Addition to existing building
o Renovation / addition to Research & Development testing labs
o New Clean Room Testing Labs
o Taste testing facility & with associated kitchen preparation rooms.
ï¶ Ault Foods - 401 Plant (Ice Cream) - $120 Million
o Addition for Haagen Daz processing Line
o Addition to the blast freezer, storage freezer, and loading dock
o Installation of new packaging & pick lines
o Raw Milk receiving bay
o Onsite Waste Treatment plant
ï¶ Cuddy Foods – Cuddy Blvd, & Trafalgar Ave (McDonalds) $75 Million
o Renovation to existing chicken kill plant
o Addition for new chicken McNugget processing line
o Installation of temporary McNugget processing line at Trafalger Plant
ï¶ AAA Michigan – Generator Facility (6MW) $7.0 Million
o New power generator plant
o Three – 2MW diesel generators – (13.2kV)
o Diesel tank storage facility
o Power shedding thru existing building switchgear to primary grid
Institutional Facilities
Medical Facilities
ï¶ Tweed & District Community Health Center $17 Million
o Future Hospital Phase
o X-Ray rooms
o Testing labs
o Long Term Care
o Senior Apartments
ï¶ University of Western Ontario $8.0 Million
o Cancer Testing laboratories
o Animal storage & testing labs
o Research Testing laboratories
o Clean Rooms
o Computer Rooms
Nursing Homes / Retirement Facilities
ï¶ Wildwood Nursing Home, St. Mary’s $8.0 Million
o 62 Bed – Long term Care
ï¶ Fiddick Nursing Home, Petrolia $7.0 Million
o 92 Bed Long Term Care
o 1 Respite
o 36 Bed Retirement Home
ï¶ Gateway Community Health Center, Tweed $3.0 Million
o Medical services, X-ray, Testing labs
o Future Hospital, long term care, & Apartments
ï¶ Huronview – Home for the Aged $12.0 Million
o 120 Long term care
o 20 Senior Apartments
ï¶ Huronlea – Home for the Aged $7.5 Million
o 64 Long term care
o 20 Senior Apartments
ï¶ Eden House Nursing Home, Guelph $5.3 Million
o 58 Bed Nursing Home
o 20 Bed Retirement Home
ï¶ Country Meadows Retirement Home $4.5 Million
o 50 Bed Long term care
Churches
ï¶ Salvation Army St. Thomas Citadel $6.0 Million
o New Building on existing site
ï¶ Salvation Army Tillsonburg Corps Hall $1.2 Million
o New Building on existing site
K12 Facilities
ï¶ Northville Public Schools, Northville, Michigan
o 1999 Bond $90 Million
 Cooke Elementary School – Interior renovations & lifting sinking building
 Silver Springs Elementary – Classroom additions (Radius building)
 Amerman Elementary – Interior Renovations & upgrades
o 2002 Bond $60 Million
 Hillside Middle School – Conversion from a high School to middle school
 Amerman Elementary – Building additions & renovations
 Winchester Elementary – Addition to existing school (Radius building)
o 2004 Bond $ 45 Million
 Hillside Middle School – Energy Upgrades (Power & Lighting)
 Amerman Elementary – Energy Upgrades (Power & Lighting)
 Silver Springs Elementary – Addition of cafeteria & multipurpose room
 Winchester Elementary – Addition of cafeteria & multipurpose room
 Ridgewood Elementary – Two classroom additions
ï¶ Hazel Park School District, Hazel Park, Michigan $60 Million
o Hazel Park Junior High – New building
o Ford Elementary – Building addition & Renovation, MEP upgrades
o Hoover Elementary – Addition & Interior renovations, MEP upgrades
o Webb / Jardon Elementary School – Interior renovation & roof replacement
o Hazel Park High School – Interior renovation, MEP upgrades
ï¶ Performing Arts High School, Detroit, Michigan $144 Million
o Silver Leed Certified Building
o Working Radio Station & Television Studio
o 1200 Student High School
o 850 Person auditorium with 6 storey fly loft
ï¶ Royal Oak School District, Royal Oak, Michigan $60 Million
o Northwood Elementary - New facility & demo existing
o Royal Oak High School Athletic Field – New turf field & practice field / track
o Large underground storm water detention basin
Commercial Buildings
Retail
ï¶ Mejier Store #64, Ann Arbor, Michigan $15 Million
• Building additions (precast & Steel)
• Complete exterior & interior renovation
ï¶ Mejier Store #27 Yipsilanti, Michigan $17 Million
• Building addition (Precast & Steel)
• Complete exterior & Interior renovation
ï¶ Jacobsons – Indianapolis, IN $12 Million
• 120,000 sqft /three storey existing building renovation with Mall
• 60,000 sqft of new marble floors
• Renovation performed while building is open for business
• 6 month project – Accelerated schedule
ï¶ Jacobsons – Altamounte Springs, FL $10 Million
• Complete renovation of existing building
• New escalators installed in radius opening
• Major structural shoring
• Roof replacement
ï¶ Jacobsons – West Palm Beach, FL $19 Million
• New building
Hotels
ï¶ Greektown Casino Hotel $250 Million
o 32 Storey High Rise Hotel (Post-Tension)
o 400 room hotel
o 3400 car parking deck ( pre-cast plank)
o Gaming floor & event center addition (Structural Steel & masonry)
o Building completely open four months after last concrete pour
o Accelerated Schedule
o Lead Superintendent for hotel
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.