To gain employment with a stable company who demands quality and holds high regard for hard work.
Personal Resume Of:
Michael R. Spaugy
9582 U.S. Rte 127
Celina, Ohio
Ph- 419*733*3884
Objective:
To gain employment based on experience and qualities demonstrated in past work performance.
Experienced in all phases of commercial and residential building projects.
Able to work independently off prints and/or under supervision.
Working knowledge of true cost of projects after completion.
Ability to achieve scheduling goals with-out sacrificing the quality of the project.
Positive attitude, team player, hard working and lead by example. Ability to accept responsibility.
Work History:
Spaugy Concrete and Construction Celina, Ohio 2004- to present
Hume Contracting Lima, Ohio 2001 – 2004
BEEM Construction Botkins, Ohio 1995 – 2002
Architectural Metal and Glass Ashland, Ohio 1991 – 1995
Experience:
Concrete
Building layout and placement from the architectural hubs. Form, place, pour and finish footers, foundation walls, basement walls, tilt-up walls and all flat work and curbs. Hands on use of wood forms, aluminum forms, Simon panels, gang forms, super- stud forms and curb forms. All form carpentry and complete finishing skills.
Steel Erection/ Steel Siding and Roofing
Steel erection including “red ironâ€, perlins, girts, lay-out and placement of door and window openings, canopies, and roof penetrations. Installation of all steel siding and metal roofing. Installation of doors, windows and all exterior building trim.
Interiors
Walls, doors, restroom partitions/stalls, handicap accessories, wood framing and metal stud.
April 5th, 2009
Dear Sir:
I have spent the past 20 years working with concrete construction. My experience includes, but is not limited too most all wall forming systems, tilt-up wall panels and flat work. I have had “hands on†use of everything from plywood wood forms, simon panels, aluminum wall panels to building wall forms using “super stud†aluminum I beams which were assembled and poured to a height of 32 feet and maintained a width of 3 feet in thickness. This particular wall had a foot print of 70 feet by 230 feet and is currently being used by the City of Wapakoneta as an over-flow tank at their waste water treatment facility. My involvement also included the footings and foundation flat work .
I have been responsible for the lay-out and pouring of exterior and interior footings, all steel reinforcement, foundation walls and all flat-work associated with the project. Additionally the forming, construction and placement of any interior pier columns as specified by the prints. The size and scope of these projects ranged from $10,000 to $ 6 million after completion.
In closing I am in excellent physical shape and have all of the necessary tools and experience to deliver immediate results. I work well under pressure and try to always lead by example. I welcome the opportunity to discuss my qualifications with you in person
Sincerely,
___________________________
Michael Spaugy
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.