ROBERT (RICK) THOMAS
PROJECT BRIDGE SUPERINTENDENT
email-cthomasfl[at]aol.com or call 337-438-1484
THE MAIN OBJECTIVE OF ANY PROJECT BRIDGE SUPERINTENDENT IS SAFETY, QUALITYAND PRODUCTION.
QUALIFICATIONS
* 18+ years of bridge and concrete-related construction
* (Priority) Safety, quality and production
* Experienced working with AASHTO Girders; Steel Girders; Tub Girders; Segmental Post- tensioning all facets of pile driving, substructure and superstructure, concrete forming and placement and beam erecting, with all items of work accomplished land and water while working from barges, haunch girders, false work, cranes and barges, drill shafts land and water and all phases of bridgework. Intricate cap bridges. MSC walls.
EXPERIENCE 2009-2010 F.Miller Marine Group ;|Superintendent |
2007-2008
Posen Construction ; Bridge Superintendent
*Run CPM for new jobs and built a 400 foot cane trestle
*Sumerline Road, Fort Myers, FL; $27,000,000 project: tub girder/flyover bridge
*Plant City, FL; $6,000,000 project: 300 foot concrete AASHTO girder bridge
2003-2007
MCM Contractors; Bridge Superintendent
* Golden Gate Flyover, Naples, FL; 602 lineal feet tub girder bridge 27,000,000
* Hialeah Expressway, Miami, FL; $22,170,000.00 project: Bridge Superintendent: Construction of two new bridges over water and four bridge reconstructions totaling 2800 lineal feet of project bridge construction.
* Golden Gate Pkwy, Naples, FL; $26,590,000.00 project: Bridge Superintendent: New I-75 Interchange with three canal bridges and one bridge expansion. Totaling 2250 lineal feet of project bridge construction.
1998-2003
Balfour Beatty Construction
* Fuller Warren Bridge across St. Johns River, Jacksonville, FL. $102,000,000.00 project: Bridge Superintendent Promoted to Project Superintendent
* Manage 2 Superintendents and 17 foremen
1995-1998
Jenson Civil Construction; Bridge Superintendent
* I-95 reconstruction, Jacksonville, FL., $22,000,000.00 project; Construction of three bridges. 1 each 5 barrel and 1 each 1 barrel box culverts, walls and 4 miles of roadway PCC pavement including set up and removal of concrete batch plant.
1989-1995
Recchie of America; General Foreman
* Acosta Bridge across St. Johns River, Jacksonville, FL; $57,000,000.00 project: Construction of new cast in place, post-tensioned segmental bridge in excess of 1000 lineal feet over water, utilizing water born equipment and a traveler system. Also supervised extensive demolition of existing bridges from barges totaling 2250 lineal feet of project bridge construction.
1986-1989
Hubbard Construction; Substructure and Superstructure Foreman
* Interstate 10, Jacksonville, FL; widening approximately 7 miles/9 overpasses and roadway.
REFERENCES AND LETTERS AVAILABLE UPON REQUEST
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.