02/2007 – 03/2009 BMW Constructors, Inc. Indianapolis, IN
Project Engineer II
 Gained Experience in Project Management including estimating, planning, budgeting, scheduling, crane lift planning, construction turnover packages, and document control
 Lilly B130 AHU-66 Installation Project – Performed all management functions for this project alone. Project cost +/- $530K to be executed in four weeks. Required crane use, lifting six pieces into the facility via the roof, and installation in very tight spaces
 Lilly B130 Maintenance Projects – Performed all management functions for multiple small-scale concurrent maintenance projects with varying scope
 Spent significant time functioning as a full time project scheduler, utilizing both excel spreadsheets and Primavera P6 software. Proficient in P6 use including project/activity creation, making logic ties, using codes, resource loading, creating custom reports, and importing/exporting data
 Worked with project management and union workers to extract information needed to create and progress a schedule that represents true construction activity.
 Have attended vendor training for Primavera – “Primavera Project Manager – Advanced Course 106â€
 Gained experience in installation of mechanical systems, both piping and sheet metal. Specifically worked on projects with scope including pipe installation of multiple MOC (carbon steel / stainless steel), joint type (threaded, butt/socket/orbital welded), tank installation, sheet metal installation (duct work, air handlers, dehumidifiers), testing and air balancing, etc.
 OSHA 10 Trained
05/2005 – 02/2007 Bowen Engineering Fishers, IN
Project Engineer
 Gained Experience in Project Management including contract writing, contract revisions, estimating change orders, operation planning, operation budgeting, project fiscal management and projection, submittal processing, RFI processing
 Bridgeport Sanitary Sewer [at] New Indianapolis Airport – Onsite for 60% of project; Installed 54†PVC-lined Price Brothers Concrete Pipe between 20’-40’ below grade
 CEP-IMC Utility Connector [at] New Indianapolis Airport – Onsite for 100% of project; Installed 8†HTHW and 24†CHW in multiple phases
 On Utility Connector Project, Acted as Piledriver Foreman; shaft dimensions 30’ x 45’ with 60’ PZ-27 steel sheet piling; responsible for crane sizing, hammer rental, soil de-tensioning by pre-drilling, and shaft waler support/design
 Gained experience in installation of ductile iron pipe, carbon steel welding, concrete placement, excavation, piledriving
Education
08/2000 – 08/2005 Purdue University West Lafayette, IN
Bachelor of Science in Construction Engineering & Management
 Completed two internships with F.A. Wilhelm Construction, Indianapolis
 Member of Beta Tau – Construction Engineering & Management Honorary Fraternity
Community Involvement & Achievements
 Resident Assistant at Owen Hall and Hilltop Apartments, serving as a paraprofessional counselor, resource, and Purdue Residences liaison with over 120 residents – 2003-2005
 Active member of New Life Church, Kokomo, IN
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.