• Organized, take-charge professional with team building and supervision experience; capable of planning and overseeing a full range of construction activities from concept to completion.
• Demonstrated ability to efficiently prioritize a broad range of responsibilities to consistently meet deadlines.
• Strong interpersonal skills; proven ability to develop and maintain sound business relationships with clients, anticipating their wants and needs.
• Demonstrated capability to anticipate and resolve problems swiftly and independently.
• Highly articulate, effective communicator, with ability to motivate and direct subcontractors and employees.
• Highly adept at interacting with industry-related computer hardware and software packages. Hands-on experience with Timberline, CADD, and Microsoft Project.
• Experienced as professionally-licensed construction contractor and certified safety professional.
Demonstrated skills in:
• Contract writing
• Accounting
• Project estimating
• Construction technology
• Small business planning
• Small business development
• Legal writing
• Analytical writing
• Process management
• Production management
• Financial management
• Construction finance
• Project management
PROFESSIONAL EXPERIENCE
2005 – 2009 Estimator / Project Manager – Senn & Youngdahl, Inc.
• Estimated custom-designed homes from $500k to $2 million.
• Prepared options listing specific to each client home to assist the homeowner in selecting a desired price and contract value.
• Closed contract price with each client and composed contract documents to establish baseline for commencement of construction.
• Interacted with appraisers and loan officers to verify lending and draw scheduling.
• Assisted the client through the timely completion of an organized selections process.
• Scheduled and expedited subcontractors and workers through construction completion.
• Permitted and scheduled with city officials to complete inspections in a timely process.
• Composed and managed a quality-assurance process to insure complete and correct construction.
• Estimated and monitored the change-order process to tailor the final product to the homeowner’s desires while communicating to the subcontractors in a timely manner.
1999 – 2005 President – On Schedule, Inc. and Dorn Builders
• Launched a consulting business to help contractors and designers schedule and complete work in an organized and predictable process.
• Established work breakdown structures that accurately described processes being used by each contractor.
• Helped develop estimating and management systems that established unit pricing that could feed accurate scheduling and accounting practices.
• Estimated standard-options pricing that allowed a menu of options available on specific models of custom homes.
• Identified efficiencies in finished space that dropped square foot cost of finished space based on structure and space design.
• Negotiated subcontractor pricing consistent with the quality of space being built.
1995 – 1999 Superintendent of Facilities Management Construction Department –
University of Minnesota - Twin Cities Campus
• Scheduled and directed the work of multiple trades to complete projects on time, under budget.
• Helped create a campus-wide scheduling system to prioritze work for 135 union trades people.
• Supervised design, estimating and construction of projects from cutting doorways through asbestos-filled walls to complete floor remodels for the diabetes research facility at the U of M.
• Managed workshops that fabricated specialty parts for construction of facilities such as the sheet metal and millwork shops at the U of M.
• Completed qualified “competent person†safety training in excavation and confined space safety.
1994 – 1995 Superintendent – Stuart Building Corporation
• Completed “Southwest Gables,†an 180-unit apartment complex and club house in Omaha, NE.
• Scheduled and coordinated subcontractors to complete all phases of construction on three separate 60-unit buildings and a clubhouse.
1981 – 1994 Estimator / Project Manager – George W. Olsen Construction Co., Inc.
• Managed construction of 26 Cub Foods projects in Minnesota, Colorado and Wisconsin including 9 new stores and 3 strip malls.
• Completed numerous remodeling and renovation projects on public buildings, churches, hospitals, and office buildings.
• Constructed several new buildings such as the Desch Office Building in Stillwater, MN.
• Negotiated and managed contracts with Cub Foods, Hazelden Foundation, Super Valu, UFE, U of M, City of St. Paul, Dakota and Washington Counties and Lind Shoe Company.
• Estimated and publicly bid numerous projects up to $20 million in today’s dollars.
• Customized a computer estimating system. (Software Consultants which later became the new version of Timberline)
EDUCATION
Bachelor’s Degree – Saint Cloud State University, St. Cloud, MN.
High School – Martin Luther Academy, New Ulm, MN.
REFERENCES AVAILABLE UPON REQUEST
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.