Willing to relocate, Florida, Texas, Southeastern coastal locations are favored. I will consider all
My current search is for a company with a good communication foundation, written skills as well as verbally, holding thier management accountable. Continuing education at all levels, and its my hope with a good long, background in excellence and integrity, my new employer posseses.
My qualifications will show a long history of working with through all challenges as a team effort, building relationships while working along with goals put into their proper working solutions.
DAVID H. CASPERSON
103 E. Maple Ave. #409
BeaverDam, Wi. 53916
Phone: (920)-344-3074
Email: davidhc[at]live.com
________________________________________
OBJECTIVE
Desire to use extensive construction experience to lead a productive team promoting strong work ethics and a determination to meet the budget, and time tables at all levels. Encouraging others to better themselves while accomplishing our common goals.
Solid worker
Producer
Competitive
Motivated
Organized
Self Starter
PROFESSIONAL QUALIFICATIONS
Total station certified including robotics
Structural welding certified (overhead)
Forklift and aerial operation certified
Hilti certification (all models )
Served multiple apprenticeships
Red Cross CPR & First Aid
SOFTWARE/SYSTEM SKILLS
Microsoft Office (word, excel)
Broderbund (designing floor plans)
Network hardware builder
Typing Speed 55wpm
LANGUAGE SKILLS
Basic Spanish speaking skills
Basic Russian speaking skills
EDUCATION
Currently enrolled in psychology courses, associate’s degree level, majoring in personal
counseling.
REFERENCES
References will given upon your request
WORK HISTORY
June 20008 Supervisor,
to Coram Construction
March 2009 Calgary, AB, Canada T2P 2K4
Carpenters, laborers, and a variety of sub-contractors, were managed in the strictest of time and
budget guidelines. Material ordering, time sheets, and labor force estimating, are just a few of
the many clerical tasks managed. Working with sub-contractors making sure their own time
lines were meeting with our own goals. Safety procedures written, and followed by the
companies strictest goals. Reinforcement of all policies including disciplinary actions enforced
to keep safety, and our bottom line, a common goal.
May 2007
to
April 2008
Masonry Foreman
Dave's Building & Restoration
Burnett, Wisconsin, 53922
This is my father’s company, upon a surgery mishap, he was left incapacitated for nearly one year. After discussing with him, options, I took over running his company until he recovered. During this year, his company grew 12% in sales.
Building forms to pour and finish concrete. Tuck pointing masonry in a variety of settings, i.e. walls, chimneys, stone foundations. Relining chimneys with stainless or aluminum products. Measuring venting for furnace, water heaters, and appliances. Fabricating sheet metal parts for newer connections to older appliances. Repairing or rebuilding machinery used in all applications.
Journey Man Mason
Fabrication of Sheet Metal/ Steel
Custom Installation of Fireplaces
Color Matching Mortars & Crete
Oct 2006
to
May 2007
Union Carpenter
Miron Construction
Neenah, Wisconsin 54957-0509
Puddling concrete with traditional methods and laser screeds. Concrete forming using Simmons, plywood, aluma gangs. Finish trim installation, some mill work on site. Countertops, cabinet installation. Demolition and clean up. Welding, steel erection.
Served at any capacity
Inventory & tools kept organized
Start early and stay late when needed
Jun 2006
to
Sep 2006
Union Carpenter Foreman
E&A Enterprises Inc.
Verona, Wisconsin 53593
Carpentry performed using wood studs as well as steel. Insulation applied to walls before dry walling. Carpenter foreman performing various tasks including material ordering, take offs from blueprints. Tracking hours, as well as change orders and coordinating with other sub contractor's schedules and most important completion on time.
Foreman
Task management
Interpreter Spanish to English (basic)
Client's satisfaction made a priority
Jun 2006
to
Jan 2006
Union Carpenter Foreman
KBS Construction Inc.
McFarland, Wisconsin 53558
1st phase concrete formed the parking structures.
2nd phase concrete formed 2 floors of walls and poured 3 post and tension cable decks, using wacos setup with aluma beams and plywood.
3rd phase wood trussed floors on top of structural steel pre made panelized walls.
At a crucial point of completing our 2nd floor framing, our crew finished 2 days ahead of schedule earning us a half day off with pay.
Met many roofing challenges. Designed and implemented a system to save roofers 12 hours of detail work, and the building owners less headaches because of what could have been water traps and leaks.
In addition to assigned responsibilities, assisted in layout, change orders, and filled in for the interior walls foreman.
Ready to serve in any needed capacity
Carpenter Foreman
Design and Implement on Site
Monitor Building Materials and Tools
Layout
Jan 2005
to
Jan 2006
Non Union Carpenter
McGann Construction Inc.
Madison, Wisconsin 53704
McGann Construction is a very versatile company with high standards. My responsibilities were to form concrete, and frame buildings. Finish trim installation, on site mill work, cabinet and counter top installations. Site layout, steel erection, and painting.
Management of skilled craftsman
Site lay out
Completion of duties on time and budget
Presented optimal construction techniques
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.