Summary: Fourteen years Estimator’s experience in pre-construction services, negotiate and hard-bid estimating. Detail driven with focus on time and cost.
EXPERIENCE
S/L/A/M Collaborative Constr. Serv., Glastonbury, CT-Top 300 ENR A/E Co. 5/2007-12/2008
Estimator
- Preconstruction services - Performed detailed schematic, design development and construction documents estimates on schools, hospitals, commercial, site development using historical data up to $ 80 M. Conducted take-offs for all divisions
- Quantified and qualified differences between estimates and reconciled.
- Developed and update unit price database, estimating models on various structure types
- Worked closely with architects emphasizing budget constraints
- RFI’s for architects, preparing an add-alternate list for owners,
- Prepared bid documents for the subs with scopes of work
Konover Properties, a Simon Konover Company, West Hartford, CT 1/2006-4/2007
Chief Estimator
 Performed conceptual and hard-bid estimating- hotels, site development, multi-family buildings, multi-building complexes, strip malls, Conducted take-offs for all divisions
 Developed scopes of work for subs, RFI’s; Evaluated subcontractor bids and change orders
 Managed subcontractors, buy-outs, contract negotiations,
 Developed and update project schedule, Directed value engineering and upgrades
Worth Construction, Bethel, CT- Top 300 ENR General Contractor 4/2003-12/2005
Estimator
ï® Performed hard-bid, conceptual and negotiate estimating – Commercial and Municipal projects up to
$120 Million in the Tri-state Area including schools, hospitals, waste water treatment plants, transformer stations (Con-Ed), multi-level precast parking garages, interstate highway interchanges – renovation, additions and new construction
ï® Conducted take-offs including extensive sitework, concrete, masonry etc.
ï® Developed general conditions, RFI’s, scope of work for subs and evaluate bids,
ï® Directed value and cost engineering, cost studies, Maintained Subcontractor and Cost Database
Foremost Contracting, LLC, Brooklyn, NY 11/1999 – 3/2003
Estimator
• Performed conceptual, negotiate and build-design estimating.
• Conducted take-offs and estimating of up to $25M on civil, structural and architectural projects.
• Developed scope of work. Obtained and evaluated bids from subcontractors.
• Reviewed design options. Recommended materials, engineering and design approaches based analysis of cost, quality and availability.
• Directed value, cost engineering and cost studies. Maintained cost database.
• Worked closely with owners, Engineers, Architects and subcontractors emphasizing cost control.
North Shore Energy Saver, Inc., Glen Cove, NY 5/1994 – 10/1999
Estimator/Project Manager for General Contractor
• Developed budget with cost control, Negotiated contracts for projects up to $1.5M.
• Prepared Bid packages, submittals, RFIs and Change Orders
• Field management and project scheduling using Suretrak
SKILLS SUMMARY -, MS Office, Excel, Microsoft Project, Earthworks, Suretrak
EDUCATION
U. of Hartford, West Hartford, CT and Fordham U., NY, NY - Management and Accounting courses
City College of New York/CUNY New York, NY, 1994 - Bachelor, Civil Engineering
Cracow Polytechnic University, Cracow, Poland, 1990 - Associate, Civil Engineering
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.