Looking for an opportunity to create more bussiness together and have a mutual growth.
Ing. Salvador Hinojosa Gomar
Schubert # 1034 Col. Mision Anahuac
Escobedo, Nuevo Leon
Phone: (811)-283-0142
Cell: (811)-043-9617
e-mail: shinojosa74[at]aim.com
Project Manager / Superintendent
EDUCATION
University of Nuevo Leon as Civil Engineer (1996), part of a pilot generation for the new school program implemented at that time.
Nuevo Leon, Mexico.
LANGUAGES
Spanish and English 100% fluent
LICENSES AND REGISTRATIONS
- Certified Civil Engineer.
- English Instructor.
- Trained in 30Hour OSHA ( Chicago IL.).
- Trained in JD-Edwards Cost System ( Chicago IL ).
- Trained in Primavera Contractor ( Chicago IL ).
- Trained in Project Management ( Chicago IL ).
- Qualified to work in USA as a Project Manager / Superintendent
Available to Travel
WORK EXPERIENCE ( 14 Years / 6 years in the Automotive Industry)
Note: Resume has been set up chronologically to express Professional development.
Ing. Zendejas – Mty N.L. 1994 - 1995
Structural Design and Calculations
• Structural calculations for different small constructions.
• Development of all structural calculations for the construction of the ITESM University houses ( Sorteo TEC ) for Monterrey city.
• Structural calculations for different medium size concrete buildings.
Construx Industrial S.A. de C.V. - Mty N.L. 1996 - 1997
Civil Work Supervisor and Projects Coordinator
• Drawings, engineering and subs negotiations coordinator.
• Civil work supervisor for different stages of the project.
• Labor and sub-contractors job site supervision.
Emerson Electric Co. Reynosa Tamps. 1997 – 1998 ( Phase 1 & 2 Building Expansions )
Assistant Senior Project Manager
• Development of master schedule including risk analysis.
• Assistance in general contractor’s negotiations, including national and foreign sub-contractors.
Construcciones Paquete S.A. de C.V. Mty. N.L. 1998 - 2000
Member of Project Control and Bid Packages Department
• Responsible in Business development ( USA Sector )
• Participation in bid packages for Mexican and American bidding contests as general contractor.
• Experience on sub-contractors negotiation and final closing of contracts.
• Elaboration of Project Schedules including “ S “ curve, critical path and risk analysis.
Graycor International ( Main Head Quarters, Chicago IL – www.graycor.com )
Project Engineer 2000 - 2001
Kohler Reynosa Project ($5.1 M USD)
• Project Engineer for brand new facility in Reynosa Tamps. ( Kohler Co. )
• Participation on Important savings in subs. negotiations ( for a 5.1M project, $ 200,000.00 dollars saved, on top of projected profit; project finished a month ahead )
• Responsible on construction safety practices ( Zero accidents in 2,100 working hours with and average of 250 workers )
Project Superintendent, General Assembly 2001 - 2004
International Truck and Engine Co. Escobedo N.L. Mexico ($120 M USD project)
• In charge of all corresponding modifications to all systems required to receive a new truck model called LCF (Low Cab Forward). Work included installation and coordination of equipment such as: tire delivery system, engine assembly conveyor, transmission assembly conveyor, transfer manipulators, civil work for misc. equipment, etc. All of these equipment was installed on a running line using down times and weekends.
• Responsible for final training and commissioning of all equipment
Area Project Manager, General Motors Company, Ramos Arizpe Coahuila Mexico ($ 60 M USD project ) 2004-2005
• In charge of project management regarding a V-block line installation, and finishing a heads and engine assembly lines installation.
• Responsible for on-time equipment delivery to site, installation, power on and run-off, including all related utilities to be connected to this production equipment.
Project Manager, OSHRAM Sylvania Company, Cd. Juarez Chih. Mexico ($ 3 M USD project ) Jan. 2006 – June 2006.
• Fully responsible of the second stage of the project including final punch list and demobilization.
Assistant Project Manager, Bass Pro Shops, Portage IN, USA ($ 12 M USD project )
June 2006 – Feb 2007.
• In charge of project sub-contracts scope reviews.
• In Charge of safety.
• Managing and Supervising Drawing updates ( CCD’S, RFI’S, ADDS )
General Lead Superintendent, Robert Bosch , Cd. Juarez Chihuahua ($ 4.5 M USD project )
Feb 2007 to Jan 2008.
• In charge of the construction phase of the project.
• Fully responsible for safety, schedule, & quality.
Project Manager, Robert Bosch , Aguascalientes, Mexico ($ 2.7 M USD project )
Jan 2008 to August 2008.
• In charge of the project regarding all phases.
• Fully responsible for safety, schedule, budget & quality.
• Obtained cost savings to the owner and finished the project a Month ahead of time.
Project Manager, Toyota Manufacturing, Blue Springs Mississippi USA ($ 150 M USD project)
August 2008 to Feb 2009.
• In charge of management of the electrical discipline for the utility area of the building.
• Participation on Equipment Commissioning ( KANBAN )
• Assistance in Document Control and Close out Matrixes.
Estimator, Graycor International Head Quarters, Monterrey N.L.
Feb 2009 to Date.
• Currently Finishing Operations for Graycor International.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.