To obtain a Construction Management position that is both challenging and rewarding. I'm an willing to relocate anywhere for the right project.
Construction Professional with 30-years experience in construction that includes semiconductor, pharmaceutical, bio-technology, publicly funded, warehouse, dairy, food plant, manufacturing, data center, commercial, including a 52-story high rise. Seeking an opportunity to apply my experience to lead, learn, and grow while solving new challenges.
Qualifications
 Project Management – 20-years of success at PM level. Responsible for all aspects of management for construction projects including leadership, scheduling, material expediting, subcontractor coordination, document control, quality control, project close-out, cost control, and the bottom line.
 Safety – 100% commitment to safety. Posses an unwavering commitment to safety which has resulted in no serious accidents on my projects.
 Cost - Delivered profitable projects on schedule and on budget by managing and controlling all aspects of cost for material, labor, general conditions, and schedule against the original estimate insuring that costs do not exceed revenue. Projects ranged in size from $5m to 120m.
 Schedule – Committed to practical, logic based scheduling that is continuously maintained as the project progresses towards completion. Plan the work, work the plan.
 Quality –Accustomed to working within strict procedures, under continuous inspections, stringent requirements for certification and documentation, as well as closing out with comprehensive turn over packages. Quality is built in, not added on at the end.
 Design/Build – Have successfully teamed with designers to complete design / build projects, including many large projects.
 Closer – Total commitment to project from start to finish. Very strong in the completion and close out of all projects.
 Computer – Skilled in a variety of programs, including Work, Excel, Power Point, Outlook, Project, Primavera, Quick Books, as well as on line applications. Some experience in SAP.
Professional Experience
NEHP Inc. 2009
Williston, VT
 Vice President
 Business founded to manufacture modular process utility products for microelectronics customers.
 Second person to join company.
 Developed business strategy to capitalize on the drop in local microelectronic work by utilizing the availability of experienced high purity, microelectronic workers and bringing work from other areas of the country (world) to our fabrication facility.
 Managed growth of business volume from $220k to $5m per year in 5-years, $10m 2008.
 Profitable attained in less than 5-years.
 Prepared business plan and prospectus to successfully secure outside investment.
 Championed training in lean manufacturing techniques.
NEHP Inc. (Cont’d)
 Headed company’s effort to pursue pharmaceutical customers with the goal to fabricate hygienic skids in our facility:
o GMP training for biotechnology and pharmaceutical.
o Incorporation and implementation of Bio-Pharm Standard Operating Procedures.
o Award and successful execution of a field pharmaceutical project.
o Repeat business and new pharmaceutical customers
o Award and successful fabrication of skids for Amgen, CA
 Managed NEHP’s largest field project for Bristol-Meyer Squibb in Devens, MA.
 Customers include Applied Materials, Nikon, Intel, IBM, Suss MicroTec, Vishay Electro-Films, University at Albany SUNY, Wyeth Pharmaceuticals, Stryker Biotech, Amgen, Bristol-Myers Squibb, Parsons, Pizzagalli, and Fluor.
Fluor 2002
Greenville, SC
 Project Controls Manager – IBM Microelectronics, Essex Junction, VT
 Prepare detailed cost reports and projections with Project Managers for multiple projects.
 Cost analysis provided for both design and construction projects.
 Internal company reporting on the projected profitability for each project.
 Detailed reporting and explanation of any variances in cost.
 Developed thorough understanding of how the project can be profitable.
 Reports prepared monthly.
2001
 Sr. Project Manager / Project Manager – IBM Microelectronics, Essex Junction, VT
 Lead project teams in B970 and B973 for rearrangement and renovation projects within an existing and operating facility.
 Project values ranged from $5m to $120m.
 Construction Management contract was renewable yearly.
 IBM renewed contract 6 consecutive years.
 Developed and implemented data based Change Management system that was adopted by IBM. Functions included Letter of Authorization, Change Order, and AIA Invoicing.
 Authored, obtained approval, and implemented Project Procedures for entire site.
 Managed project teams from 5 to 35 staff members.
Previous Experience Summary
Ellis-Don 1997
London, Ontario, CA
Project Manager – College of Education, Georgia Southern University, State of Georgia Board of
Regents, Statesboro, GA.
MEP Coordinator – 1996 Atlanta Olympic Dormitories, Georgia State University, State of Georgia
GFIC, Atlanta, GA.
Marshall Contractors 1995
Rumford, RI
Project Manager – Publix Supermarket Distribution Warehouse & Dairy, Lawrenceville, GA
Project Manager – NAMSA Laboratories, Kennesaw, GA
Project Manager – Quest International, food plant, Rochester, MN
Project Manager – AT&T (Lucent Technologies), Fiber Optics Manufacturing, Norcross, GA
Federated Department Stores 1993
Atlanta, GA
Project Manager – Rich’s, Department store renovation, Duluth, GA
Charlotte Motor Speedway 1992
Concord, NC
Manager of Development & Construction – Winston Cup Garage, Turn 1 Grand Stands, Golf Course
Holder Construction Company 1991
Atlanta, GA
Project Manager – Georgia Dome, a Joint Venture with Beers, Russell, Holder and Barton Malow,
Atlanta, GA
Project Manager – Delta Reservations Center, 6-story office building, a Holder/Russell joint venture,
Hapeville, GA
Project Manager – 191 Peachtree Tower, 52-story office building and parking garage, a Joint Venture
with Beers, Russell, and Holder, Atlanta, GA
Estimator – Holder Construction Company, Atlanta, GA
Project Engineer – Tower Place, 11-story office building, Tampa, FL
Project Engineer – Raymond James Financial Center, 6-story office building, St.
Petersburg, FL
Project Engineer – All State Regional Data Center, 2-story office building Tampa, FL
Layout Engineer – Island Center, 14-story office building, Tampa, FL
Florida State University 1982 - 1986
Tallahassee, FL
B.S. Business Management, 3.4 gpa. Core Courses included: Macroeconomics, Business Statistics,
Financial Accounting, Managerial Accounting, Human Resource Management, Marketing, MIS, Risk
Management & Insurance, Business Law & Ethics, Competitive Dynamics, Contemporary Leadership,
Management of Labor & Industrial Relations.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.