• 31 years experience in Electrical Field Engineer/Planner, QC Inspection and Mechanical QC Inspection. Decommissioning, Demolition, Fire Seals, Transformers, Electrical Terminations, Conduit Installation, HVAC, Temporary Power, Security Modifications, Generator Work. NCCER Qualified.
• Proficient in Windows 2000, MS Word, Excel And Maximum
• Positive attitude, good communication skills, excellent time management and organizational skills.
• ANSI N45.2.6 Certification
EXPERIENCE:
June 2008 to March 2009
Watts Bar Nuclear Plant
SUN TECH, Spring City, TN
Electrical Field Engineer/Planner
Initiated work order packages for construction and maintenance utilizing EMPAC. Performed design change implementation, decommissioning and demolition for electrical systems. Performed field inspections and provided field support. Prepared man-hour estimates and material takeoffs.
April 2008 to May 2008
Cooper Nuclear Plant
ATLANTIC GROUP, Brownville, NE
Electrical/Mechanical QC Inspector
Performed inspections in conformance with drawings, workmanship standards and company policy and procedures. Performed Mechanical inspections using calipers, micrometers, CMM and other mechanical inspection tools. Performed electrical inspections using In-Circuit Test tool, oscilloscope and multi-meter. Maintained and verified all weld data, NDE and quality records.
June 2007 to April 2008
Sinclair Oil Refinery
TIC, Sinclair, WY
Electrical Field Engineer
Design Change Implementation, Decommissioning and demolition on Coker Unit. Oversaw the installation of cable trays, conduits, motors, starters and junction boxes to accommodate fire protection piping.
November 2006 to April 2007
Camanche Peak Nuclear Plant
BECON, Glen Rose, TX
Electrical Field Engineer
Design Change Implementation for special projects. Oversaw the installation of new reactor vessel head. Verification of new designs associated with the installation of junction boxes and conduits.
June 2006 to November 2006
Cooper Nuclear Plant
ATLANTIC GROUP, Brownville, NE
Electrical Field Engineer
Design Change Implementation for special projects. Performed field engineering activities on turbine equipment. Installed vibration monitoring system. Initiated as-built drawings for monitoring cabinet and the routing of conduits going to turbine generator.
March 2006 to May 2, 2006
Paloverde Nuclear Plant
ATLANTIC GROUP, Tonopah, AZ
Electrical Field Engineer
Assisted with 4160V Breakers and 13K breaker removal and performed maintenance and reinstallation.
October 2005 to March 03/2006
Marshall Power Plant
MMR,MARSHALL,TX
Electrical Field Engineer
Design Change Implementation on demolition of Electrical components, Change prints for Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components. installation of cable trays, & conduits. And relocation of new MCC
July 2005 to August 2005
Plactic plant
EPIC, CLINTON, IA
Electrical Field Engineer / QA/QC
Design Change Implementation In removal And installation of MOV’s and AOV’s. Design Change Implementation for the installation of conduits and air supplied piping anvalves. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components. Also performed QC and QA activities on completed work tasks.
June 2005 to July 7/2005
Air Force Hanger
RED THUNDER SYSTEMS, Inc. OKLAHOMA CITY, OK
Electrical Field Engineer
Design Change Implementation for demolition of existing lighting and the installation of new lighting on Air Force Base. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components
April 2005 to May 2005
VCSummersNuclear ATLANTIC GROUP -JENKINSVILLE, SC
Electrical Field Engineer
Electrical Field Engineer –Design Change Implementation in the installation of new generator and replacement of new stator. Design Change Implementation for the installation of new conduits and terminations on stator. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
March 2005 to April 2005
Camanche Peak Nuclear Plant
FLUOR GLEN ROSE, TX
Electrical supervisor
Temp Power on Shutdown Worked In plant installing temp power panels. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
July 2004 to March/2005
Copper Nuclear Plant
ATLANTIC GROUP, BROWNVILLE, NE
Electrical Field Engineer
Design Change Implementation in installation of security cameras and the installation of new electrical cable installation on duck banks during shut down mode. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
June 2004 to July 2004 .
Wall Mart Warehouse
SIEMENS DEMATIC CORP ALABAMA
Electrical Field Engineer
Design Change Implementation in installation of
Control Panels and conduits on conveyer system. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
March 2004 to June 2004 ToyotaPartsPlant LITTLE ROCK ELECTRIC, OSCEOLA, AR
Electrical Field Engineer
Design Change Implementation for the installation of Switch Gear and conduit. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
February 2004 to March2004
Chicken Plant
LITTLE ROCK ELECTRIC, PINE BLUFF, AR
Electrical Field Engineer
Design Change Implementation for installation of Stork panels and the routing of conduits to controls and relays. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
March 2003 to January 2004
New Nesson Auto Plant
MERIT ELECTRIC, CANTON, MS
Electrical Field Engineer
Design Change Implementation in the installation
of raceway and six [1600] amp services. Design Change Implementation for rerouting of cable trays. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
February 2002-December 2002
Gas Power Plant
SNC LAVALIEN, EL DORADO, AR
Electrical Field Engineer
Design Change Implementation for the installation of 6 million feet of Electrical cable of all sizes in all applications. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
May 2001 to February 2002
Gas Power Plant
NEPCO, STERLINGTON, LA
Electrical Field Engineer
Design Change Implementation in installation of Installed 1-½ million feet of electrical wire on all sizes. Change prints on sizes of cables going to locations. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
June 1999 to February 2001
Power Gas plant
CCC GROUP, INDIATOWN, Fl
Electrical Field Engineer
Electrical Field Engineer – Design Change Implementation in installation of
1-½ million feet of electrical wire on all sizes. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
January 1999 to June 1999
Gas Power Plant
CCC GROUP, SANFORD, FL
Electrical Field Engineer
Electrical Field Engineer – Design Change Implementation on the relocation of Duct banks. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
February 1998 to January 1999
Gas Power Plant
MMR Inc, FLORIDA
Electrical Field Engineer
Field Engineer – Design Change Implementation in installation of raceway and installation of cables. All conduits field routed. Change prints on relocation’s of conduits in duck banks. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
June 1997 to January1998
Elementary School
FASTBACK ELECTRIC, FLORIDA
Electrical Field Engineer
Design Change Implementation in installation of duck banks and panels in building. Change prints on relocation’s of panels & the installation of conduits in duck banks. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
June 1992 to January 1998 -
Us sugar plant
MERIT ELECTRIC & INSTRUMENTATION, FLORIDA
Lead Electrician
Routed Conduit, pulled Cable wire and terminated switch gear. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
February 1989 to January 1992
Indian Town power plant
ALABAMA ELECTRIC, FLORIDA
Journeyman Electrician
Routed Conduit, pulled Cable wire and terminated PLC cabinets. Perform Design Change Implementation as well as the Decommissioning and Demolition activities for electrical systems and their components.
June1977 to February 1989
• FLORIDA WIRING, FLORIDA
Electrician
Routed Conduit, pulled Cable and wire and terminate Performed heavy duty commercial and industrial work.
EDUCATION:
1981 Florida Wiring – Florida Journeyman Electrician License
1978 Okeechobee High School – Diploma
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.