Munin Changtham
Home Address: 67/60 Moo5 Chimplee, Talingchane
Bangkok: 10170. THAILAND
Contact Tel no: home: 0066 81 824 7533, Mobile Phone: +249 955 034 610
Work Phone: +249959509027
Email/ WEB: landsurvey47[at]hotmail.com / http://www.landsurvey47.co.cc
________________________________________
Position Apply For: Mining Engineer, Quarry Engineer, Planning Engineer, Survey Engineer, Quantity Surveyor, Cost
Controller, QA/QC Engineer
QA/QC Manager
-------------------------------------------------------------------
Letter Cover:
Dear Sir,
With the reference to your advertisement, I am very interested in your vacancy.
My current job title is Crusher & Quarry Engineer for Fattouch Holding Southern Sudan. My job involved in design foundation and supervise for Crusher, Asphalt, Batching Plant, operate Crusher Plant, supervise construction and quarry site, monitor production and blasting.
I worked as Senior Surveyor for Bilfinger Berger Qatar WLL., My job scope,survey work for building construction and infrastructure duties, land surveying, survey inspection, as built plan and etc.
In 2006-2008, with position Chief Supervisor QA/QC - Survey. My scope of work as Assistance of QA/QC Manager are to prepare quantity report, testing Quality of rocks, prepared document for approval of the client, supervise selection sizing of armor rocks and supervise all work in quarry site, survey design, AutoCAD drawing plan, loading armor rock to barge, construction survey for installation crusher plant, screen plant, belt conveyor and tunnel for aggregate transportation to the barge for development quarry to produce aggregate.
Moreover, I worked as Assistant Quarry Manager, SNC♦LAVALIN International Inc. My scope of work as a Technical Assistant was for all the clerical work, worked on radar surveying, digital photogrammetry survey, cartography, mapping, establishing the quantity of the stock that the Quarry Department produced and listing also all the cost involved in that matter; material, consumable, the tools, the manpower and all cost inside department, quantity report and prepare a system for data entry that could be easily readable and exhaustive of the cost control department for the relation between the production and the cost.
Furthermore, I am very proficient in, Microsoft, construction design, surveying program. And hold the Private Land surveying License from Department of Lands Ministry of Interior Thailand.
Personal Data: Thai, 36 years old (May 11, 1973), Married, Buddhism, 176 cm. and 65 kgs.
Education:
July 1998: Bachelor’s Degree in Civil Engineering
Rangsit University, Bangkok, Thailand.
Profressional Qualifications:
License: Private Land surveyor License from Department of Lands Ministry of Interior Thailand.
Affiliations: Thai Surveyor Associate Thailand, permanent member, from March 2008 to
present.
-------------------------------------------------------------------
Experiences:
Feb 21/2009 – Present : Crusher and Quarry Engineer
Company: Fattouch Contracting Southern Sudan Holding Ltd.
Project Location : No.30 May Avenue, Juba Southern Sudan
Project Description: Aggregate quarry rock (Granite), Crusher Plant, Asphalt Plant, Batching Plant Project
Responsibilities: -Supervise construction of Crusher Plant at capacity 500 tons per hour
-Election works for Crusher plant installation.
-Supervise quarry site i.e. blasting design, roads construction road for going up
Mountain, Bench and Plat Form and supervise quarry site.
-Monitoring production compare between blasting activities and production.
-Foundation design for Asphalt plant 20 tons per hour.
-Foundation design for Batching plant.
-Supervise foundation construction of Crusher Plant, Asphalt plant and Batching
Plant.
-Operate Crusher Plant.
-Prepared & Process data for survey works.
-Crete Database for Crusher Plant such as Maintenance History, Preventive
-Maintenance Program, Quantity Production, Equipment Breakdown, Equipment
Occupation, Manpower.
April 20, 2008-Feb19/2009: Senior Surveyor
Company: Bilfinger Berger Qatar W.L.L.
Project Location: Construction Of Barwa City Phase1 P.O. Box 23749, Doha, Qatar
Project Description: Construction of Barwa City Project, 128 Apartment Blocks,a 5,968 apartment
Residential project,which all works initiating from design to finish, including all
The infrastructure therefore.
Responsibilities: -Lead surveyor for the14 teams on site construction for Civil Work and
Infrastructure Work .
-Lias with the clients representative ,Maunsell Consulting on a day to day
Basis for the quality control checks according to QA/QC quality control
procedures.
-Training the site supervisors and foremen in construction sequence with major
Reference to speed and quality of works.
October 19, 2006-March 27, 2008: Chief Supervisor QA/QC - Survey
Company: Musandam Rock LLC
Project Location: Al Hala Main Road-Khasab, Musandam, Sultanate of Oman
Project Description: Armor Rock Quarry Project
Responsibilities: -Selection and sizing of Armor Rocks by visual check in 5 categories as
Category 1 300-1,000kg Category2 500-2,000kg Category3 1,000-3,000kg
Category 4 2,000- 5,000kg Category5 3,000-7,000kg.
-Testing quality of rocks and prepare documents for approval of the client.
-Quantity report for production of rock, Monitoring of Blasting compare with
production And Database For Quantity Surveyor Works
-Database Programming by Visual Basic for cost control such as Fuel & Oil
consumption for Dry Equipment and Floating Equipment, Manpower and
Equipment Hours and also compare with production for verification of unit cost for
production
-Survey Design and AutoCAD Operator for surveying work and drawing plan.
-Survey for construction to install crusher plant, screen plant, belt conveyor
And tunnel for transport aggregate to the barge for development quarry to
produce aggregate and sand.
-Shop Drawing for crushing plant installation and construction work in Quarry.
-Supervise all works in quarry site such as earth work, construction road go up to
mountain, cutting slope, make bench to remove loose material, loading Armor
Rock to barge.
August 9, 2004 – September 29, 2006: Managing Director (Own Business)
Company: Ban♦Gullayagasorn Co., Ltd.
Project Location: Nakornprathom Province, Rajburi Province, Kanburi Province, Samudsakorn
Province, Nan Province, Phrae Province, Phayao Province, Satoon Province
Project Description: Sub contractor for construction the Civil Work and Grounding and Lighting
Protection System (Height Steel Structure Tower 45-70 meters) Telecommunications Infrastructure Project for Mobile network
System (AIS-CENTRAL REGION WEST PROJECT GSM PHASE 14C, TA-
ORANGE PROJECT PHASE 4.3, AIS-CENTRAL REGION NORTH PROJECT PHASE 15C, CDMA PHASE 2000X) Those project for build The Mobile telephone network sub station (Distribution Station, Repeat Signal Station) around Thailand.
Responsibilities: - Survey for construction such as locates position of station, place construction line, Grid line, elevation for construction work required.
- Survey inspection such as Investigation, monitoring check for Horizontal
Alignment and Vertical Alignment.
- Assign master schedule, weekly schedule, and daily schedule.
- Tracking the progress and cost relation between the progress and cost.
- Progress report and Quantity report.
- Shop drawing for construction plan.
- Asbuilts plan for handover to the client.
- Supervise all of construction work in the site .Assign the plan and instruction to
Staffs in the site such as superintendent, site engineer, foreman.
- Clerical work for all document relate such in construction contract, Invoice, Tax
Invoice
August 1, 2003 – June 28, 2004: Assistant Quarry Manager
Company: SNC ♦ Lavalin International Inc.
Project Location: The Great Man Made River Project (Sarir Pre Stressed Concrete Cylinder Pipe
Manufacturing Plant Contract 61915-A-510-00-CT-CT-0001). Sarir Libya
Project Description: Main Manufacturing located at Sarir Plants the biggest manufacturing plant to
Produce the pipe which the production lines could be spread in to 5 lines of product with over 2,000 manpower and over 500 of equipment used. The project is produce spread pipe for replacement of damaged pipes in the Great Man Made River Project, Libya. Quarry Department to produce the coarse aggregate (Ø 10-19 mm.) of 600-1,100 tons/day, fine aggregate (Ø 3-10 mm.) of 1,200-2,000 tons/day, coarse sand (Ø 0-5 mm.) of 2,500-3,000 tons/day and fine sand (Ø 0-3 mm.)
Responsibilities: - Radar surveying for investigation aggregate source in the Sahara Desert.
- Convert survey point from Radar Survey point (Geodetic Coordinate) to
UTM Coordinate (WGS84)
- Build layout plan from radar surveying for assign Master schedule
Planning.
- Place the aggregate source and setup reference point. Assign layout plan for quarry by Dynamic GPS. Assign service road and place of Pre-Screening Plant.
- Supervise Site surveying such as run Traverse for monument point refers to monument of Libya Surveying Department.
- Work on mapping of the surveying data recorded by the survey crew for survey design and survey inspection work.
- Be responsible for all quantity involved in the material, consumable, the tools, the
manpower and all cost inside the quarry department.
- Quantity the production of the aggregate and prepare a system for data entry
easily readable and exhaustive for the cost control department for relation
between the production and the cost.
- Assist the Quarry Manager for all the clerical work.
June 20, 2002 – July 31, 2003: Cost Control & QA/QC Technician (and as acting Civil Engineer)
Company: SNC ♦ Lavalin International Inc.
Project Location: The Great Man Made River Project (Repair Works For the Sarir – Sirt and
Tazerbo–Benghazi, Pre Stressed Concrete Cylinder Pipe Lines). Contract184
Ajdabiya Libya.
Project Description: That Project to repaired (Post-tensioning) and replacement pipe line diameter 4 meters of lines pipe from Tazerbo to Benghazi and Sarir to Sirt about 300 Kilometers. This project replaces 4000 pipes and repairs (Post-tensioning) 500 pipes, using a fleet of over 400 employees from 5 nationalities (Thai, Canadian, Romanian, French, Libyan) 200 heavy equipments and 100 vehicles.
Responsibilities: - Preliminary Surveying Construction drawing plan for new project (Tripoli Ring
Road Project) to get the authorization from Libya Government.
- Investigation and Monitoring the As build plan for handover to the Libya
Government.
- Cost control of project budget & directly report to Projects Control Director.
- Build Database assign for cost control for whole set of project follow policy from
Projects Control Director.
- Planning Report such as Two Day Schedule, Two Weeks Look ahead, Daily
Progress Report, Status Activities of Works.
- Quality Surveyor for Quantity Checking & Progress Report, Schedule and
Planning Report.
- Material Laboratory e.g. Soil, Concrete etc.
July 18, 2000 – May 2002: Foreman Construction
Company: VLC & M Co., Ltd. Bangkok THAILAND (Now That company is Areeya
Properties (Public) Co., Ltd.
Projects Descriptions: - Katthaleeya Home Real Estate Project. (Budget of project 120 million Thai Bath, area of project 20 Rai. or 32,000 Sqr. meters and 40 units of house)
- Real Estate Home Project (Budget of project 120 million Thai Baht) Buengkum Bangkapi and Suvinthavong ,Ladkabang (Region of Bangkok ,Capital of Thailand) including area of 230 raise or 368,000 square meters
- Project of re-made path of Bangkok World Bank Loan (Budget of project 60
million Thai Baht)
- 2ndSanam-Luang (National Park) Project (Budget of project 10 million Thai Baht)
- Construction Sub-Road Sub-Road Annex83, Sub-Road Annex85, Sub-Road
Annex87 length 350 meter and Sub-Road Ruamjai Pathana for 350 meter
(Budget of project 3 million Thai Baht)
Responsibilities: - Primary Survey to issue Topographic Map calculated quantity of material to
estimate cost and land survey to received the deed from government.
- Survey Design to assign Infrastructure Alignment, Land Used, and Landscape of
project that could be match with architecture layout plan
- Surveyed and mapped the property for real estate projects.
- Shop Drawing, prepared the Drawing Plan to request construction license from
government.
- Supervise construction of all of work in the site.
- Estimate cost, Master Schedule, Material Schedule, Planning of project.
- Estimate cost of variation order from customer.
Dec 1999 – July 2000: Land Surveyor (Temporary & Part Time Officer)
Company: Dermbangnangbourch Land office, Department of Lands,
Ministry of Interior, Supanburi Thailand
Projects Descriptions: Department of lands is an institute where is responsible issuing a title deed
real estate gives with people, and all transactions that about the real estate.
Responsibilities: - Transformed, deed mapping sketch and land survey documentation from 29
Origins to be UTM. System.
- Investigated & Surveying and Mapping for Cadastral land’s bounder to device
the property in issuing the deed.
January 1999 – April 2000: Survey Engineer
Company: Private Land Surveyor Official Kred - Petch Surveying & Mapping Co., Ltd.
Supanburi Province, Thailand.
(Private Land Surveyor Official was received License by Department Of
Lands, Ministry of the Interior)
Projects Descriptions: Private Land Surveyor Official is an institute where is responsible land surveying
does a map and issue a title deed the real estate give with people. Moreover
This company is contractor for any survey project in Thailand.
Responsibilities: - Performed primary mapping for telephone line in distributing service of
Telephone Organization of Thailand.
- Presentation Topographic mapping to operate the landscape of Agriculture
Researching Institute of Southeast Asia Co., Ltd.
- Investigated & Surveying and Mapping for Cadastral land’s bounder to device the
property in issuing the deed.
Oct. 1997 – Dec. 1998: Foreman Building
Company: Skanchai Company Limited
Projects Descriptions: Nakvatchalautid Hospital (Bangkok Hospital Center 48).This hospital is
permanent community hospital of million 80 baht with 60 beds
budget baht states, be three structure reinforced concrete building, by responsible build all and the area around the hospital.
Responsibilities: - Survey for construction such as locates position of station, place construction
line, Grid line, elevation for construction work required
- Survey inspection such as Investigation, monitoring check for Horizontal
Alignment and Vertical Alignment.
- As Built plan for handover to the client.
- Supervise all of construction work in the site.
Feb. 1996 – Sept. 1997: Foreman (Between Studies in University)
Company: Suankasatreanthai Partnership Company Limited
Projects Descriptions: Suankasatreanthai Real Estate project. This project has all areas 1000 Rai or
1,600,000 a square meter That is oval large-sized project composes club art building like Thai originally style, the road within the project late a pillar is 12 reinforced wide meter length 1 kilometer concretes , the road supports 10 wide 16 length total kilometer meters.
Responsibilities: - Primary Survey to issue Topographic Map calculated quantity of material to estimate cost and land survey for received the deed from government.
- Survey Design to assign Infrastructure Alignment, Land Used, and Landscape of
project that could be match with architecture layout plan.
- Survey for construction such as locates position of station, place construction
line, Grid line, elevation for construction work required.
- Survey inspection such as Investigation, monitoring check for Horizontal
Alignment and Vertical Alignment.
- Supervise all of construction work in the site.
- Estimate cost, Master Schedule, Material Schedule, Planning of project.
A. Training in Survey Engineering Field
Venue: Workshop for training cause Digital Photogrammetry Survey, Survey
Engineer Department ,Chulalongkorn University
Subject: - Basic of Digital Photogrammetry Survey.
- Digital Photogrammetry Processing.
- Geometry of Digital Photogrammetry.
- Photo Control Point.
- Digital Elevation Model (DEM), Digital Surface Model (DSM) and Geographic
Information System (GIS).
Duration: - 1 Week.
Management Trainer: - Survey Engineer Department, Chulalongkorn University.
Venue: Workshop for Private Land Surveyor License, Songpeenong Land Office,
Department Of Lands, Ministry of the Interior.
Subject: - Investigated & Surveying and Mapping for Cadastral land’s bounder to device the
Property in issuing the deed.
- Land surveying.
Duration: 3 months.
Management Trainer: Department Of Lands, Ministry of the Interior Thailand.
Venue: Workshop for Private Land Surveyor License Department of Lands, Ministry
of the Interior Thailand.
Subject: - Criminal & Civil Law.
- Civil Land law code for private land Surveyor B.E. 2535.
- Regulation & Specification for Surveyor as per Civil Land Law.
- Surveying Technique.
- Advance in Surveying.
- GIS. (Geographic Information System)
- GPS. (Global Positioning System)
- UTM. (Universal Transverse Mercator)
- Total Station Instrument.
Duration: 7 days
Management Trainer: Official Private Land Surveyor License Board, Department Of Lands, Ministry of
the Interior Thailand.
Asia Road Construction Project (Ko Ka - Lampang Section), Thailand.
Position: Survey Engineer Trainee(Between Studies in University)
Duration: 1 month (During Studying)
Description: - Reinforced Concrete of Dual lane High way Street including street isle, footpath
Client: Department of Highways, The Ministry of communications.
Contractor: Harn Kittichai Construction Co., Ltd.
B. Training in Civil Engineering Field
Elephant Tower Project: Ratchayothin Junction, Paholyothin Road, Bangkhen District, Thailand.
Position: Civil Engineer Trainee
Duration: 3 months (During Studying)
Description: - 30 floor of building, Modern Style Building (Elephant shape). Pre cast of wall and
Post Tension Pre Stress Concrete & RC Structure.
Client: Arun Chaiseri Design & Consultant Co., Ltd.
Contractor: Kasemkit Cooperation Co., Ltd.
Budget of Project: 400 million Thai Baht
Improve & Development of Chawag Swamp Project: Supanburi Province, Thailand.
Position: Civil Engineer Trainee
Duration: 2 months (During Studying)
Description: - To excavated the swamp with one million cubic meter of top soil.
- Asphalt road around the swamp.
- Construction of Administration and Office building in Thai traditional style 5
Unit.
- Construction Official lodgings, 12 buildings (360 Unit).
Client: Department of Irrigation, Ministry of Agriculture and Cooperative.
Contractor: Samingbanrai Limited partnership.
Budget of Project: 1,000 million Thai Baht.
Skill and Capability
Total Station such as Sokia Set2000, Sokia Set3000, Topcon GTS2110, Laica TCR803.
GPS Trimble real time GPS.
Surface8 for Topographic Map for Radar Surveying.
AutoCAD Land Desktop for Survey Design, Civil Work Design and Survey job.
AutoDesk Architectural Desktop for building drawing plan in 3D.
AutoCAD for drawing plan.
Microsoft Access and Visual Basic Programming for Database for Cost Control and Quantity Surveyor job.
Microsoft Project for Planning and Schedule.
Microsoft Excel and Microsoft Word for general calculation and documentary work.
Adobe Photoshop for Graphic Computer.
Macromedia Dream weaver and Microsoft FrontPage for Wed Design.
STAAD PRO, Microfeap SYS Steel Design for Building Construction Design.
Proficiency in Language: English: Reading / Writing / Speaking and understanding.
Reference: -Mr.Keith Anthon, Chief Survey Engineer, Bilfinger Berger-Qatar W.L.L.,
aket[at]bilfinger-qatar.com.qa
-Mr.Eddy Vandewalle, General Manager, Musandam Rock LLC.,
vandewalle.eddy[at]deme.be
-Mr.Perron Michel, QA/QC Manager, SNC ♦ Lavalin International Inc.(Libya), mperron2404[at]yahoo.ca
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.