To secure a position within a company that will utilize my current abilities while providing me with the opportunity to increase my knowledge and experience.
OBJECTIVE: To secure a position within a company that will utilize my current abilities while providing me with the opportunity to increase my knowledge and experience.
EXPERIENCE:
1/2007 – Present Construction Superintendent, M.L. Bell Construction
Participate in pre-construction meetings. Prepare and submit daily and weekly reports.
Insure that safety standards are met and maintained and weekly safety meetings are given
to keep employees alert. Superintendent over multiple jobs on a simultaneous basis.
Organize work, schedules, supplies, tradesmen and equipment for commercial
construction jobs of renovation and full construction projects. Read and interpret blue
prints, plans, laws, and other related criteria for workers. Insure conformity with overall
project and work with design engineers to resolve design issues. Recommend revisions to
designs, plans and materials as necessary. Determine costs for projects based on all
factors to include labor, material, sub-contractors and more. Assure that all methods and
supplies are up to code and pass inspections. Review contractor quality control reports
and coordinate inspections on a timely basis. Handle time sheets and other employee
needs as necessary. As a Carpenter by trade I also assist in jobs as needed.
4/2006 – 1/2007 C4 Carpenter, Scott Long Construction
Carpentry for commercial buildings. Insured that safety standards were met and
maintained. Read and interpreted blue prints, plans, laws, and other related criteria for
jobs. Insured conformity with overall project and worked with design engineers to
resolve design issues. Recommended revisions to designs, plans and materials as
necessary. Assured that all methods and supplies were up to code and passed inspections.
11/2004 – 4/2006 Carpenter, Construction Labor Contractors
Worked as the Lead Carpenter on framing and finish carpentry. Worked with various
general contractors on multiple commercial sites. Insured that safety standards were met
and maintained. Organized work, and supplies for commercial construction jobs of
renovation and full construction projects. Read and interpreted blue prints, plans, laws,
and other related criteria for workers. Insured conformity with overall project and worked
with design engineers to resolve design issues. Recommended revisions to designs, plans
and materials as necessary. Assured that all methods and supplies were up to code and
passed inspections.
3/2004 – 11/2004 Foundation & 1st Floor Superintendent, Pulte Homes
Responsibilities included the layout and completion of foundations and first floor decks at various locations. Supervised sub-contractors and work crews. Responsible for inspections and insured the quality of work done. Liaison for ground works foundations inspectors. Insured that safety standards were met and maintained. Organized work, schedules, supplies, tradesmen and equipment for construction jobs. Read and interpreted blue prints, plans, laws, and other related criteria for workers. Insured conformity with overall project and worked with design engineers to resolve design issues. Recommend revisions to designs, plans and materials as necessary. Assured that all methods and supplies were up to code and passed inspections.
5/2003 – 1/2005 Owner, General Contractor, K.H.M. Construction
Located and bid on various jobs. Hired sub-contractors and acted as the general
contractor. Jobs included finishing basements, home additions, decks, masonry work and
drainage. Lead pre-construction meetings. Prepared and submitted daily and weekly
reports. Insured that safety standards were met and maintained. Organized work,
schedules, supplies, tradesmen and equipment for construction jobs. Read and interpret
blue prints, plans, laws, and other related criteria for workers. Insured conformity with
overall project and worked with design engineers to resolve design issues. Recommended
revisions to designs, plans and materials as necessary. Determined costs for projects
based on all factors to include labor, material, sub-contractors and more. Assured that all
methods and supplies were up to code and passed inspections. Reviewed contractor quality control reports and coordinated inspections on a timely basis. Worked as a carpenter.
11/1999 – 5/2003 Construction Foreman, Meadows Farm
Responsibilities included supervision and working construction crews, site set-up, reading and adjusting plans, confirming elevations and staying with projects until completion. Jobs included building decks, dry lay of patios with brick, cement, clay and stone. Also built retaining walls of timber, block (pisa, celtic, allan, etc.) and drainage for walls and grading. Participated in pre-construction meetings. Insured that safety standards were met and maintained. Organized work, schedules, supplies, tradesmen and equipment for construction projects. Read and interpreted blue prints, plans, laws, and other related criteria for workers. Insured conformity with overall project and worked with design engineers to resolve design issues. Recommended revisions to designs, plans and materials as necessary. Assured that all methods and supplies were up to code and passed inspections.
4/1995 – 11/1999 Operations Manager, American Home Landscape/White Oak Nurseries
Responsibilities included managing 10 employees, inventory control, job costing for 5
departments, improved and maintained property, and insured OSHA requirements were
met. Maintained company vehicles and equipment including tags, taxes and titles.
Assisted the purchasing department and assisted the production department with job set-
ups. Prepared and submit daily and weekly reports. Insured that safety standards were
met and maintained. Organized work, schedules, supplies and equipment. Recommended
revisions to designs, plans and materials as necessary. Determine costs for projects based
on all factors to include material and more. Assured that all methods and supplies passed
inspections. Handled time sheets and other employee needs as necessary.
MILITARY EXPERIENCE
United States Navy, 10/1981 – 10/1987
United States Navy, 11/1990 – 05/1992
United States Army, 11/2000 – 11/2002
EDUCATION
St. Louis High School, Hawaii, 1982
University of Arizona, Business Management, Some College
REFERENCES
Mike Bell
M.L. Bell Construction
804-752-6032
Superintendent
Turner Construction
202-391-2717
Owner
Chesapeake Mechanical
804-426-2488
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.