I am a Pipefitter/Welder by trade.
I also have experience in Inspection, QA/QC, & General Foreman.I have 25 years in this business
JOEL MCNIEL
EDUCATION / CREDENTIALS:
• Level II VT Inspection and Film Interpreting
• Oklahoma Welding Steam Card
• Oklahoma Journeyman Mechanical License
• 18 Months Mechanical Drafting School
• OSHA 10 HR
• OSHA 30 HR
EXPERIENCE:
• WOODGROUP POWER SOLUTIONS - NOV. 10, 2008 TO PRESENT
QA/QC Site Manager
G.E. Frame 7EA Gas Turbine Power Plant , Shepherd, Texas
Carbon Steel and Stainless Steel Pipe 1" to 14" dai., and Stainless
Steel water storage tank.
• LA-TEX ASSOCIATES - OCT. 01 TO NOV. 09, 2008
WELDING INSPECTOR
Pipeline Compressor Station
• MCDANIEL'S TECHNICAL SERVICES - JUNE 23 TO AUG.1, 2008
(WELDING INSPECTOR)
Gas Pipe Line - Carthage, Texas
Carbon Steel 24"
Inspector on Tie Ins
• MCDANIEL'S TECHNICAL SERVICES - MARCH 08 TO JUNE 14, 2008
(WELDING INSPECTOR)
Gas Pipe Line - Douglas, Wy
Carbon Steel 24"
Inspector on Pipe Gang - Bead and Hot Passes
Also on Tie Ins , then, on the North Spread as a Tie In Inspector
• MCDANIEL'S TECHNICAL SERVICES - OCT. 07 TO MARCH 08
(WELDING INSPECTOR)
(Under contract to Wood Group Power Services, Inc.)
G.E. Frame 7EA Gas Turbine Power Plant - Jenks, Okla
Carbon Steel and Stainless Steel Pipe 1" to 14" dia.
and Stainless Steel water storage tank
• CRL INC. - JAN.07 TO MARCH 07
Q.C. Inspector
Offshore Drilling Platform
Carbon Steel and Stainless Steel pipe 2" to 48" dia.
• MID SOUTH MAINTENCE - JAN.06 TO DEC. 07
Field Superintendent & Shop Superintendent - Pryor, Okla.
Supervised 25 people doing custom pipe fabrication.
Also prepared Propsals and conductrd customer walk throughs.
• CRL INC.- JUNE 05 TO JAN 06
General Foreman - Baton Rouge, LA
Re- Vamp refinery amine unit - Coffeyville Resources Refinery
• L- CON - JAN.05 TO JUNE 05-
Piping Superintendent -Meeker, Colorado
Meeker 1 Gas Plant
Prototype methane gas unit, only 2 like it
• EXPRESS METAL FAB - JAN.04 TO JAN. 06
Q.C. Inspector - Shop Work
Heater Tubes 4" to 8" dia.
Crossover piping 3" to 16" dia.
• BERG INC. - Mid 1999 to Mid 2000
General Foreman - Chouteau, Okla
Over 300 employees
Complete structural erection and mechanical installation
On two Siemens Gas Turbines
• MOHAWK FIELD SERVICE - JULY 98 TO AUG. 99
Q.C. Inspector
Oil Refinery Shop Work and Shutdowns
Heater Tubes 4" to 8" dia
Spool Pieces 2" to 36" dia
Carbon, Chrome, and 9 Chrome
HP- 40 and HP Modified piping
• CUST- O - FAB - I have worked for them off and on for the last 10 or 12 years
Q.C. Inspector- Tulsa, Okla.
Oil Refinery Shut Down Turnaround
Carbon Steel, Chrome, and Inconel piping in Heater Tube Bundles,
1" to 36" dia.
• Superintendent, Q.C. Inspetor, Scheduler, Welder, Pipe Fitter
Oil Refinery Shut Down Turnarounds, Mechanical Installation, Rework Alkaline Unit
and Catalytic Cracker Units, Carbon Steel, Chrome, and Inconel piping in Heater
tube bundles, 1" to 36" dia.
Applicable code work on these projects includes ANSI B 31.1;
ANSI B 31.3; API 650; and API 1104
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.