Management - Electrical/ Project / Construction /Inspections
Summary of Qualifications:
A highly dedicated professional with 30 years total experience. Management of all
areas of electrical installation, startup, maintenance, service and repair. A
seasoned leader able to accept and complete challenging assignments,
solve problems with a positive outcome, and make productive
decisions in fast paced environments. A strong team player capable
of providing effective project management through attention to
detail, ensuring customer satisfaction by offering excellent service,
and utilizing interpersonal skills and high work ethics that inspire
associates to respond. Areas of expertise include:
* Ground up builds • Retrofits • Startup and Commissioning •
Operations • Project Management • High Voltage Terminations
* Design • Engineering Layout • Code Compliance, low voltage testing, Hi-pot testing
*DCS Controls , Instrumentation, Switchgear testing, Low Voltage Controls
*P&ID’s • One-line Diagrams, Ladder Drawings, Vendor Supplied Drawings
* Rigid Conduit Layout • EMT Conduit, Procurement • Organizational Skills •
Quality Control * Problem Solving, Personnel Mentoring
PROFESSIONAL EXPERIENCE
Elkhorn Construction-E&I Superintendent 2007-2009-- Oil & Gas
Successfully completed Compressor Station, Calvin Ok.(Devon Energy)Amine and Booster,
Station, Montague Texas(EOG) and various related projects
Responsible for installation, procurement, and weekly progress meetings to
ensure project billing was according to actual progress of projects. Completed electrical
and instrumentation projects, according to applicable design, P&ID’s, codes and project
specifications. Performed estimates and takeoffs of additional work required, not covered
under original scope or contract.
Contech Control Systems-Electrical Supervisor 2006-2007—Petrochemical/ Oil & Gas
Completed PLC (delta V) upgrade to Carpenter Refinery in La Porte, Texas
Successfully completed installation according to engineered drawings, P&ID’s.
Maintained project costs/ budgets and tracking all changes not incorporated into drawings
Assisted startup and insured complete system turnover.
Metroplex Control Systems - Project Manager 2003-2006-commercial/ industrial
Successfully managed multiple projects and personnel in electrical,
fire and security field.
Completed all projects, met deadlines, maintained project
inventories, and created cost analysis and project status reports.
Gained experience working closely with engineering to ensure that all
NEC, NFPA, TAS and ADA requirements met contract specifications.
Worked in the field ensuring raceways, wiring and terminations were
according to all current codes and applied industry standards.
A-Tem Fire and Controls, Inc. - Owner/Operations Manager 1997-2003—Commercial/ industrial
Managed all aspects of operations including payroll, estimating,
planning and field installations.
Maintained effective cost control of all overhead, labor and
equipment to maximize profits.
Supervised and performed electrical installations for power,
lighting, and specialty systems like fire, cctv, and access controls
at city facilities, manufacturing plants, hospitals and schools in
the Dallas/Fort Worth/Mid-cities area.
EMC-7 - Electrical Supervisor 1992-1996--Commercial/Industrial
Supervised installations of raceways, wiring and equipment
terminations. Performed start-up and final testing with all pertinent
documentation. Attended pre-bid meetings, coordinated with all other
trades, and created scheduling to ensure deadlines were met.
Created estimates for changes in field that did not agree with
engineered drawings or contract specifications.
ITI (Brown & Root Inc.) - Electrical Foreman 1990-1992-Petrochemical/ Oil & Gas
Supervised personnel for installation of raceways for Honeywell digital
control, site lighting, and power distribution. Completed all
terminations and start-up testing for system turnover. Assisted I&C
group with system start-up on control wiring for digital control
system. Field engineered structural supports for all field cable
trays, raceways and termination enclosures.
WB Moore, Inc. - Electrical Lead Journeyman 1987-1989--Commercial/Industrial
Installed raceways, wiring and termination per engineered drawings
for new Tandy Center /Sundance West in Ft. Worth, TX.
Serviced and maintained all construction power required for site
equipment, such as polar crane, welding machines, and general
480/277 and 120/208 volt construction power distribution.
Witherspoon Electric - Electrical Journeyman 1984-1987--Commercial/Industrial
Performed electrical installations at Chaparral Steel, TXI Industries
and commercial facilities located in DFW area. Completed power
distribution, controls and lighting per schematics, ladder diagrams,
and engineered drawings provided by customer.
Brown & Root Inc. - QC Inspector/Start-Up Technician/Electrician--Nuclear
1976-1984
Performed inspections of all electrical installations.
Verified installations all met guidelines set forth by Nuclear and
Local Quality Control procedures. Worked directly with start-up
Initiated hands on testing of equipment from(13.8, 4160, 6.9 and 480V) Switchgear to
Motor control centers and associated control room operation equipment.
EDUCATION
Tarleton State University - Completed two years
, Electrical Journeyman License-Texas
Breaker Testing-Multi-Amp
Factory Training: PLC based panels--
Notifier, Edwards (Est-3), Pyrotronics (Seimens)
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.