To obtain a superintendent role in the construction industry for a strong well established company. Being a valuable asset to the company and aggressively pursue the completion of the projects I am assigned to with emphasis on safety, quality and owner satisfaction.
Michael P. LaMay I Phone # 313-295-2202
7802 Harding St. Cell # 248-660-4967
Taylor, Michigan 48180 Email mpl373[at]yahoo.com
OBJECTIVE:
To obtain a superintendent role in the construction industry for a strong well established company. Being a valuable asset to the company and aggressively pursue the completion of the projects I am assigned to with emphasis on safety, quality and owner satisfaction.
SUMMARY :
I have been in the construction industry for over 25 years. With a proven track record of completing projects in excess of 150 million dollars, on time and with tight budgets. I have completed multi story buildings from the ground up, large civil projects with utility installations. 500,000 sq. ft self perform concrete project with flumes, Pits and drain decks. electrical sub-station installations. 13,200 Volt primary power installations, commercial buildings, interior build outs and renovations up to 30 million dollars, Hospital OR room additions at U of M Hospital with med gas and skytron equipment installations. Data Logic Plant Control Room for Detroit Edison. Wastewater treatment plant renovations . Chase banks from the ground up. High end mid-rise condo's in downtown Ann Arbor. In short I have been selected by my employers for some very high profile extremely difficult projects. I believe my skill set to be exceptional and could complete any size or type of project I would be assigned to.
EDUCATION:
Truman High School
Taylor Vocational School - Building Trades
University of South Florida - OSHA 30 hour Cert.
Hilti Fire Stopping Training
CPR & First Aid Certified (Red Cross) - Current
M.I.O.S.E.H. - Safety Training
Safe-2-Work Compliant
M.U.S.T. Drug Program Compliant
State of Michigan Residential Builders License (5/20/86 to Present)
Journeyman Carpenter - Local 687 Detroit (7 yrs)
WORK EXPERIENCE:
2005-PRESENT General Sr. Superintendent - Cornerstone Building Group Inc.
General Superintendent for all projects, performed trouble shooting and problem solving for other Superintendents, Monitor projects for schedule adherence, process RFI’s,
schedule updates, attend progress meetings with owners and A & E’s, onsite progress meetings with sub-contractors. Implementing and tracking meeting minutes. Processing change orders including estimating, material take offs, processing and reviewing AIA’s for billing. Some tasks also included reviewing submittals; self perform division work (carpentry, concrete). Intermediate skills in Microsoft office programs Microsoft project and timberline. Monitoring site safety program adherence.
1996-2005 Superintendent - De Maria Building Company
Lead superintendent on multiple projects, Budget minded and proactive in value engineering to save both time and money on projects. Strong problem solving skills Responsibilities included implementation and processing RFI’S, Schedule updates, open issues logs, implementing construction change directives, quotes for extras, submittal tracking with P.E. , As builts, Coordinate subcontractors, conduct weekly progress meetings with trades on site and A/E and owner meetings. Generate 3 week look- ahead, submitting time sheets for self perform trades on site. Project budget tracking, Review AIA’s for submission of payment with A/E and Project Manager. Processing and quoting change orders. Report to P.M. on overall job status. Quality control and safety program/ training implementation.
MEDICAL FIELD PROJECTS:
U of M O.R. Bid Pak 2 (4 O.R. rooms 2 procedure rooms, W/Med Gas Installations and Electrical Isolation Panels) – ( Ann Arbor, Mi. ) - 5MM
U of M Anesthesiology wing – ( Ann Arbor, Mi. ) - 1.5MM
U of M P.A.C.U – ( Ann Arbor, Mi. ) - 1 MM
U of M Pre-Op - ( Ann Arbor, Mi. ) - 1 MM
U of M High bay Addition 4 story – ( Ann Arbor , Mi. ) - 4.5MM ( Ground Up )
U of M Chiller Project – ( Ann Arbor, Mi. ) - 1.5MM
U of M LSA Building 6 story – ( Ann Arbor, Mi. )- 30MM
U of M Instrument Processing, Surgeon Locker rooms off O.R. ( Ann Arbor, Mi. ) - 1 MM
DMC Gamma Knife Installation - 3MM ( Detroit, Mi. )
Henry Ford Hospital Water Main Replacement (Detroit, Mi. ) - 1MM
Henry Ford Satellite Facility Renovations (Taylor, Mi) - 1MM
Henry Ford Hospital ( Detroit, Mi. ) - Electrical Isolation Panel Installation in 13 O.R Rooms - .5 MM
INDUSTRIAL:
South Lyon WWTP Additions & Upgrades, AS ( South Lyon, Mi. ) (Aeration Basins, Stabilization ponds, Grit Tanks, Weir Installations, etc.) - 6MM
Detroit Edison - 12 Story Coal Elevator Replacements ( St. Clair, Mi. Power Plant ) - 3MM
Detroit Edison Coal Conveyor Piers Replacement, ( St. Clair, Mi. Power Plant ) - 1MM
Detroit Edison Logic Control Room - ( St. Clair, Mi. Power Plant ) - 2.5MM
500,000 Sq. Ft. Daimler Chrysler World Engine Plant, ( Dundee, Mi ) (concrete, flumes, pits, mezzanines. & decks) - 4MM
Daimler Chrysler Tanker Offloading Pads / Tank Farm (Chelsea, Mi. Proving Grounds) - 2MM
Daimler Chrysler – Sanitary lift stations 6M+ ( Chelsea, Mi. Proving Grounds)
Chrysler Mack Engine Renovations (Detroit, Mi ) - 1MM
COMERICAL:
Washington Ave. Mixed Use - ( Royal Oak, Mi. ) (Commercial, Retail, Condos, 4 story green roof) 7M+ ( ground up )
Chase Bank (New Branch) (Commerce Tsp. Mi ) - 2 MM ( ground up )
Chase Bank Renovations (Scio Tsp. Mi ) - .33MM
Comerica Bank Renovations (Rochester, Mi ) - 1 MM
Comerica Bank Headquarters ( Detroit, Mi ) - 1 MM
Strip Mall ( Southfield, Mi. ) - 2 MM
U of M LSA Building Renovation 6 story – ( Ann Arbor, Mi. ) - 30MM
MULTI - FAMILY :
600 Unit Multi - Story Apartment Complex Las Vegas - 6 city blocks, 11 gunite pools - 30 MM +
400 + Multi - Story Apartment Renovations - ( Denver Colorado ) - 3 MM +
1,600 + Apartment Renovations - Tri-County Michigan - 10 MM +
Lofts 322 Ann Arbor, Mi - 5 story high end condos - 8 MM+ ( ground up )
Livonia Eldercare Facility 200 Bed - 7M+ ( Ground up )
FEDERAL / GOVERNMENT:
U.S.P.F.O Readiness Center - Department of Veterans & Military Affairs (Lansing, Mi.) (Self perform concrete vaults, wire mesh partitions, Site concrete ) 7MM +
ADA Upgrades - Southern Tennessee Medical Center - ( Winchester, Tn. )
The above is a general compilation of primary projects and tasks, and by no means represents an entire list of all projects I have completed – complete employment history available upon request..
REFERENCES:
Dave Wilson
De Maria Building Company Inc.
Vice President
248-854-8651
Dan Savage
De Maria Building Company Inc.
Project Supervisor
248-982-2246
Matt Fuller
University Of Michigan
Project Manager / Owner Rep.
734-323-5973
Mike Cogar
Al-Walk Plumbing Inc.
Project Manager
734-994-5610
Rick Lalone
Daimler Chrysler Corporation
Senior Executive - Chelsea Proving Grounds
734-475-5522
William Petty
Friend 10 yrs + - Personal
517-548-1461
Jeff Robillard
Friend 40 yrs - Personal
734-379-3295
SKILLS:
Expert in carpentry field (Rough & Finish), proficient with computers, decision making. Excellent problem solving. 15 + Years of supervisory skills, highly motivated and energetic. Company oriented. Excellent print / spec. interpretation. Hands on capability when
needed to get the job done with the least amount of resources and expense. Budget minded. Material takeoffs, estimating skills, etc…
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.