Experience Journeyman Electrician
December 2006 - July 2009,Starr Electric, Charlotte, NC
To supervise the installation of MCC, ATS, Generated backup systems involving but not limited to running of various sizes of conduit. The pulling of different size feeders required for the amperage of the device being installed. Also the termination of the feeders to different breakers, panels, or transformers.
Install the conduit and boxes required for a wall rough in and for an overhead inspection. The installation and make up of pad mounted transformers. I also supervised the installation of buss duct in all sizes 400 amp to 400o amp vertically and horizontal. The rough in of stairwells. I was also involved in the installation of anything to do with a fire alarm system class A or class B system. Also the installation of cable tray systems, in all sizes.
The mounting of meter bank assemblies involved in a high rise from start to finish. In slab installation of various sizes of pvc required for building operation.
Senior Electrician
July 2003 - December 2006, WB Moore, Charlotte, NC
While Employed at this company I supervised the installation of ATS, PDU, IDF, Critical Power Systems, MCC Generated Backup Systems. I worked at BOA downtown on the demolition of the old fire alarm and the installation of the new fire alarm system on different floors we were unfitting. I worked at the Hearst Tower on the trade floors for 1 year. I supervised the installation on the anti terrorist barricades in the 7th and 6th street entrance on 2nd shift. I worked on many SEWA shutdowns at the BOA building, the Hearst Tower, and Gateway. I also was able to be a supervisor in the installation of a BOA hr office in the Hick son building in Balytine.
Also while at WB Moore I was the supervisor in charge of the installation of the demo and rebuild of the Wachovia Main building. I built my first battery room here 75 /500lb batteries, assembly of all the racks, and wiring that was involved for the DC out put required. I was also in charge of the critical facilities generator and all the pipe work involved in that system. While at the Wachovia I was also in charge of make up of the two large ATS that were required for normal and emergency power.
While I was employed at this company I helped to wire the first of many parking decks at the Airport. This whole job was in slab on margin for error. Also while at the Airport I in the supervision and installation of a underground duct bank that contained 4 connecting manholes and an under the main road tunnel.
Electrician
July 2001- June 2003, Regency/Encompass Electric, Charlotte, NC
While employed at this company I was mainly at two sites. One being the Hearst Tower, while there I was in charge of all the installation of all the substation on every other floor. I also wired all the elevator mechanical rooms. When the building toped out I was in charge of all three cooling tower, stairwell pressurization, fans, basically I done the installation of all electrical on the roof. Also while at the Hearst Tower I supervised the installation of all the decorative fixtures on the outside of the building, on the 43 through the 48 floor.
The second site I worked on for this company was the Westin Hotel. I was in charge of the installation of the transformers, panel, and main feeders on the hole building, not including the main electrical room. Also while employed here, I worked in various Duke Energy Power Houses. I assisted as an electrician in the installation of a new coal dump system at Belmont, installed new control boards at Cliffside, pulled miles of multi conductor cable wire, and upgraded and repaired the Gaytronics phone system.
Electrician
August 1997- April 2001, B&V Electric, Lexington NC
Most of my work for this company was of an industrial nature. I worked at Kimberly Clark rewiring any of the lights that went bad in the plant. I assisted their E&I department on the repair of any of the 10 large machines the had during shutdowns. I assisted in the installation of a chemical storage facility using a special type of rigid conduit and explosion proof fitting.
Also while at this company I worked at PPG, I assisted in 2 furnace rebuilds, an addition to their waste treatment facility, the remodel of their batch house, the installation of a liquid oxygen producing facility for their fiberglass production.
Also I worked at Everhart Chemical while there I helped to install an Oxi-Propolene storage tank system. I assisted in the installation of the new facilities as follows, Green Printing(6 months), High Point Market Square(5 months), PPG research facility(4months), Burlington Industries(7months), Dyno Overlays(3months), and High Point Chemical(5months). I have experience in Residential, Commercial, and Industrial Electrical Applications.
Education Central Davidson Senior High Lexington, NC/Rowan Cabarrus College
High School Diploma/2 year associates
I am lull and aerial lift certified. I have a NC State License. I am Hilti certified.
Interests I like to read blue prints and build things I always have and always will.
References References are available on request.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.