2004-2009
AKER KVAERNER/AKER SOLUTIONS
INSTRUMENTATION SUPERVISOR/CONSULTANT
Supervised the reconstruction of a relocated ore
Crusher to Bagdad,Az for Phelps Dodge.Also
Constructed a conveyor system for delivery of ore
To existing mill system.Completed conveyeor systems
For relocated crusher.installed instruments for 2 PLV
Systems with tanks pumps and controls in Morenci,Az.Completed a Moly conversion plant in Bagdad,Az.
2003-2004
AKER KVAERNER
INSTRUMENTATION SUPERINTENDENT
Supervised the installation refurbishment activities for
instrumentation in a new Copper Smelter and Refinery in Thailand for Thai Copper Public.This plant construction was halted in 1997 and reopened in 2003.Work includeall instrument Sub-contract supervision,safety,quality,and schedules to complete the Project.
2002-2003
KVAERNER INDUSTRIAL CONSTRUCTORS
INSTRUMENTATION SUPERINTENDENT
Supervised the Installation of a New Copper Pressure Leach System Plant in Arizona for Phelps Dodge Mining Company.Which included the purchase of bulk materials,Calibration, Installation and Startup of Instrumentation related to(PLV),Water Treatment,Plant Utilities,and Tankage
Systems to producepure Copper via a Electrowinning Cell and Extraction system .Also additional Tankage and Utilities to increase production of Copper production Instruments in the Plant consisted of pressure,level,flow,temperature,
process analyzers and their Control Systems,which was completed on Schedule and without any Loss Time Accidents with a complete approval of all MSHA Inspection of the Site,And client approvals.
2002
ZACHRY CONSTRUCTION CO.,Arlington,Az
Instrument Technician Foreman/Consultant
Supervised calibration of instrumentation for 3 combustion turbines(GE) and 2 steam turbines(Alstom).Including all balance of plant instruments as in coolingwater,lubrication,hydraulic,reverse osmosis,inst.air
and natural gas systems to complete these units in a safe and timely manner.The Client was (APS)Arizona Power Systems.
1998-2002
KVAERNER INDUSTRIAL CONSTRUCTORS , TUCSON,ARIZONA
Instrumentation Superintendent
Treatment Facilty and a copper smelter furnace in San Manuel,Nm and a 5 mile conveyor system to a leach pad.All for Phelps Chino, NM.for Phelps Dodge and a Zinc Extraction plant for Cal Energy in El Centro,Ca.
1994-1998
GREAT SALT LAKE ELECTRIC (GSL)SANDY,UT/ELKO,NV
Instrument Technician/Supervisor
Supervised,Installed,Calibrated,and Tested all instrumentation and controls on new and existing systems at Barrick Goldstrike,
Newmont,Dee, Battle Mountain Gold Companies and Kennecott Copper Co. installing instrumentation at the smelter and tank house facilities in Magma Utah.
1993
DAMES AND MOORE, DENVER, CO
Instrumentation Construction Consultant
Supervised Instrument and Electrical construction in Cajamarca, Peru on the Minera Yanacocha site for Newmont Gold Company. Also designed start-up procedures for site by circuit and process priorities.
1991-1993
KILBORN INTERNATIONAL INC., DENVER, CO
Instrumentation Superintendent Designing Consultant
Field Inst.Superintendent at Barrick Goldstrike Mine in Carlin, Nevada. Performed field supervision for upgrading process instrumentation and control systems which concerned level, temperature, pressure, flow, pH to increase productivity on Barrick’s CIL, milling, crushing, acid/neutralization and pre-oxidation autoclave. Facility also managed construction of two grinding circuits, crushing/conveyor system, five pre-oxidation autoclave plants, steam and water treatment generation projects.
1991
KILBORN INTERNATIONAL INC., DENVER, CO
Instrumentation Designer/Construction Manager
Managed construction and field design for Curraugh Resources zinc and lead production facility in Watson Lake, Yukon, Canada, to complete and pre-commission/start-up of two grinding mills, crushing/conveyor systems and flotation and filtering facility.
1990
KILBORN INTERNATIONAL INC.
Instrumentation Superintendent
Assigned to inspect and re-design field instrument components and control systems to complete the Poly Vinyl Chloride Production Project in Niagara Falls, Canada, in conjunction with management of instrument installation at the production expansion site.
1989-1990
I.T.I., DIV. OF BROWN AND ROOT, INC.HOUSTON,TEX
Instrument Technical Foreman
Performed technical design checkout and field installation of new distributive control systems upgrading from pneumatic at Shell Chemical, Deer Park, Texas. Other duties were to install/commission and calibrate level, temperature, flow and pressure instruments to an existing, running processing on line.
1996-1999
M.M.R. CONSTRUCTORS,BATON ROUGE,LA
Lead Instrumentation Technical Foreman/Inspector
Performed field design and installation of electronic field instrumentation to upgrade a pneumatic control system to a distributed control system while production was on-going. Also to include the procurement and expediting of instrument systems at Georgia Kraft/Gulf State Paper. Performed supervision of calibration, installation and start-up of a natural gas desulfurization and process plant in Gaviota, California.
1988
THE INDUSTRIAL COMPANY, STEAMBOAT SPRINGS, CO
Lead Instrument Technician
Newmont Gold Company Rain Project - Participated in the construction, calibration, loop check and start-up of the project. Particular application consisted of interfacing board-mounted process controllers to a Gould Modicon P.L.C. for the controlled processing of ore.
1986-1987
BECON CONSTRUCTION COMPANY, HOUSTON, TX
Instrument Technical Foreman
Exxon’s LaBarge Well-site Facility - Installed, calibrated, function-tested and started up instrumentation for the well-site facility. This particular effort included the verification of a remote terminal network servicing twenty (20) well sites and bringing their signals through gateway modules to a Bailey Net-90 computer-based control system.
1985-1986
PROJECT CONSTRUCTION CORPORATION, DENVER, CO
Instrument Technical General Foreman
Exxon’s Shute Creek Gas Dehydration Project - Installed, calibrated, function-tested and started up instrumentation for the gas dehydration facility. This project was worked in conjunction with the aforementioned well-site project. Again, the primary controller was a Bailey Net-90 computer based control system.
1984-1985
I.S.T.S., INC., FORT COLLINS, CO
Instrument Technician
Chevron’s Shale Oil Facility (North Salt Lake, UT) - Check, and Started up and Maintenance of the Instrumentation of the Refinery portion of the shale oil facility.
1982-1984
PAYNE AND KELLER CONSTRUCTION, HOUSTON, TX
Instrument Technician
Atlas Oil’s Hydrogenation Project - Calibrated, Check out and started up the instrumentation of the hydrogenation facility. The primary controller was a Honeywell TDC 2000 computer-based control system.
1975 - Worked for various organizations in the capacity of instrument fitter, instrument technician and instrument foreman until 1982.
EDUCATIONAL BACKGROUND
1973 New Caney High School, New Caney, TX
Degree - General Education
1977 Brown and Root - Instrumentation & Piping Course
1978 Gulf Coast Community College - Blue Print Reading & Pipe Welding
1978 Howard and Son - Electro-Mechanical & Electronics (Home Study)
1979 I.C.I. - Electrical & Specialized Technology PT ONE
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.