OBJECTIVE: To pursue a bachelor degree of science in the field of Transportation Engineering
EDUCATION: Austin Community College (Austin, Texas 1990-1994)
University of Nevada Las Vegas (Las Vegas, Nevada 1994- Present)
Level: Senior
RELATED
COURSES: Engineering Economics, Soil Mechanics, Fluid Mechanics, Materials for Civil and Highway Engineers
COMPUTER
SKILLS: Windows XP, Autocadd2000, Math-cad, MS Word, MS Excel, Power Point and MS Front Page
FOREIGN
LANGUAGES: French, Arabic, and some Spanish
CERTS: NICET II/GTE, II/CMT (Clark County G approved), ICC/RC, ICC/FP, NAQTC (Asphalt, Embankment, Lab), ACI Field
PROFESSIONAL EXPERIENCE:
QC Southwest Inc, Las Vegas NV: 10/07 to Present
SOLIDS DEWATERING STATION:
Performed quality control observation and testing on backfill operations on sewer, water and utilities lines throughout the project. Performed soil testing using a nuclear gauge. Inspected reinforcement and concrete placement operations around sewer and water pipes.
MCCARREN AIRPORT TERMINAL3, Clark County, Nevada:
Project consisted of excavation, fill and grading of embankment. Performed grading observation and testing using a nuclear gauge to determine moisture-density conditions, also provided quality control testing for the Department of Aviation. Performed inspection of the concrete placement at the terminal sidewalks.
KLEINFELDER INC. LAS VEGAS, NV: 9/06 to 10/07
WALMART SUPERSTORE, Clark County, Nevada:
Project consisted of grading of commercial building pads. Project included excavation, grading and backfill of native material; installation and backfill of water lines, sewer lines and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Inspected and certified footings. Obtained soil samples and coordinated lab testing. Performed observation and inspections of reinforcement and concrete placement in footings, building pads and sidewalks.
CITY CENTER LAS VEGAS, Clark County, Nevada:
Supervised the observation and inspection operations of reinforcement and concrete placement in the east and west tilted towers, the east garage foundation, and the drilled 50ft piers. Structures included tilted capitals, columns, foundation pads, retaining walls, footings, and core walls of the first and second floor.
MCCARREN AIRPORT TERMINAL3, Clark County, Nevada:
Project consisted of excavation, fill and grading of embankment. Performed grading observation and testing using a nuclear gauge and sand-cone equipment to determine moisture-density conditions, also provided quality assurance testing for the Department of Aviation. Performed inspection of the concrete and slurry placements in utility lines. Supervised technicians.
TERRACON CONSULANTS, Las Vegas, NV: 9/04 to 9/06
REDROCK HOTEL AND CASINO, Clark County, Nevada:
Project consisted of grading the east garage, inspection and certification of column and continuous footings around the building, inspection of backfill and waterproofing around the tunnel, and fill placement in the basement. Obtained soil samples and coordinated lab testing.
CARREY/INDUSTRIAL, Clark County, Nevada:
Project consisted of grading of commercial building pads. Project included excavation, grading, backfill and installation of water lines, sewer lines, and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Inspected and certified footings. Obtained soil samples and coordinated lab testing.
WAL-MART SHOPING CENTER, Clark County, Nevada:
Project consisted of grading of commercial building pads. Project included excavation, grading, backfill and installation of water lines, sewer lines, and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Inspected and certified footings. Obtained soil samples and coordinated lab testing.
SURREY/PAMA, Clark County, Nevada:
Project consisted of grading of commercial building pad. Project included excavation, grading, backfill and installation of water lines, sewer lines, and utility lines. Observed the location and removal operations of septic tank. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Inspected and certified footings. Obtained soil samples and coordinated lab testing.
NOVELS, Clark County, Nevada:
Project consisted of grading of housing development. Project included excavation, grading, backfill and installation of water lines, sewer lines, and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Inspected and certified footings. Obtained soil samples and coordinated lab testing.
PANORAMA TOWERS I AND II, Clark County, Nevada:
Project consisted of grading the east garages of towers I and II, inspection and certification of column and continuous footings around the buildings. Inspection of backfill and waterproofing around the garages and retaining walls, and fill placement in the basements and inside the garages. Performed observation and testing using a nuclear gauge to determine density and moisture conditions. Obtained soil samples both native and imports and coordinated lab testing.
PALMS HOTEL AND CASINO, Clark County, Nevada:
Project consisted of grading the Park Place and the Concert Venue buildings as well as the pool area in tower II. Inspection and certification of column and continuous footings in and around the buildings. Monitored ground water control operations and saturated soils replacement and ground stabilization. Performed observation and testing using a nuclear gauge to determine density and moisture conditions. Obtained soil samples and coordinated lab testing.
CAREFREE WILLOWS, Clark County, Nevada:
Project consisted of grading of housing development seniors. Project included excavation, grading, backfill and installation of water lines, sewer lines, and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Inspected and certified footings. Obtained soil samples and coordinated lab testing.
WESTERN TECHNOLOGIES INC. Las Vegas, NV: 2/00 to 6/02
I-15 Channel, Las Vegas, NV:
Project consisted of the construction of a reinforced concrete flood control channel. Project included excavation, groundwater control, installation of storm drain boxes, and backfill operations. Performed observation and testing using a nuclear gauge. Observed and tested asphalt placement, and reported test results and daily reports.
Terminal D, McCarran Airport, Las Vegas, NV:
Project consisted of excavation, fill and grading of embankment. Performed grading observation and testing using a nuclear gauge and sandcone equipment to determine moisture-density conditions, also provided quality acceptance testing for the Department of Aviation. Performed inspection of the concrete mat foundation and walls for the tramway connecting terminal D with future terminal. Supervised and trained technicians.
Iron Mountain Ranch, Las Vegas, NV:
Project consisted of mass grading of an 8-subdivision housing development. Project included excavation, grading, backfill of native as well as import material used for ground stabilization. Installation of water lines, sewer lines, storm drains and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Provided quality acceptance testing for KB home Nevada Inc., and reporting of test results and daily field reports.
Henderson Executive Airport, Las Vegas, NV:
Project consisted of excavation, grading and backfill of embankment. Performed grading observation and testing using a nuclear gauge to determine moisture density conditions, also performed thickness and straight edge testing of fill. Observed and tested asphalt placement on runways and taxiways. Provided quality acceptance testing for the Department of Aviation, and reporting of observations and test results.
Rome 20, Las Vegas, NV
Project consisted of a housing development. Project included excavation, grading, backfill and installation of water lines, sewer lines, storm drain and utility lines. Performed grading observation and testing using a nuclear gauge to determine density and moisture conditions. Provided quality acceptance testing for Real homes by Centex Inc., and reporting of test results and daily field reports.
REFERENCES: Mr. Eric Auth, Kleinfelder Inc.
Professional Engineer
Phone: (702) 736-2936
Mr. John Starke, Terracon Inc.
Professional Engineer
Phone: (702) 597-9393
Mr. Mike Jahn, Western Technologies Inc.
Professional Engineer
Phone: (702) 379-7401
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.