Wayne Bell
1226 Darrowby Lane
Decatur, AL 35603
Home Phone: 256-686-0465
Cell: 256-476-3920
Email: realdeal823[at]charter.net
EDUCATION
South Alabama Technical School-Maintenance Engineering
Repton High School-Diploma
PROFESSIONAL LICENSES/CERTIFICATIONS
Level II Startup Engineer per ANSI in 2452.6
SUMMARY OF EXPERIENCE
Thirty years of experience in construction management testing, maintenance and construction in the Nuclear, Chemical, Fossil and Paper industries. Specific areas of experience include field engineering, start-up engineering and quality assurance of piping supports, pipefitting, system completion, mechanical and electrical component identification and P&ID Drawings.
SPECIFIC EXPERIENCE
FLUOR ENTERPRISES (SEPT. 2008-PRESENT)
HEXCEL PAN LINE E PROJECT- CARBON FIBER PLANT
Decatur, AL
Assigned as Piping & Mechanical Superintendent. Responsible for fabrication and installation of various piping systems and also responsible for subcontract work for the night shift.
INSPEC INTERNATIONAL (MAR. 2008-Aug. 2008)
ALPHAPET CHEMICAL PLANT
Decatur, AL
Assigned as Process Work Project Manager for the Southeast Operations. Responsible for all construction management procedures necessary to insure that all work within facility related to Mechanical is constructed, installed and tested/inspected in compliance with all construction documents, budgets, schedules and quality expectations of the
owner and InSpec. This position was also responsible for all subcontract work on site.
BLT ENGINEERING (Dec. 2003-Feb. 2008)
INTERNATIONAL PAPER PLANT
Courtland, AL
Assigned as Project Manager for Construction Management. Responsible for pre-bid and pre-construction meetings. Responsibilities included for monitoring contractors to ensure that contract requirements and site specifications were met and approval of field change requests and resolving RFI issues in a timely manner.
MMR RADON, INC. (June 1995-Nov. 2003)
3M CHEMICAL PLANT
Decatur, AL
Assigned as Project Manager to the Construction Management Group. Responsible for pre-bid and pre-construction meeting and for monitoring contractors to ensure that contract requirements and site specifications were met. Responsible for initiating daily safety and progress reports. Setup weekly meetings with contractors to monitor safety and progress, initiate reports and also approval of field change requests. Also responsible for contract maintenance projects and resolving RFI issues in a timely manner.
CATARACT, INC. (Nov. 1992-June 1995)
WATTS BAR NUCLEAR POWER PLANT
Spring City, TN
Assigned as Mechanical Startup Engineer Level II to the NSSS Group. Responsible for various NSSS and BOP flushing and preoperational test procedures. Assigned to the Hot Test Group to collect data during the Hot Functional Test for thermal growth and vibration. Assigned to the Site Work Management Group as a System Engineer. Responsible for review of systems for completion prior to Operations acceptance. Responsible for scheduling and prioritizing any work required to be completed by construction prior to Operations acceptance.
EBASCO CONSTRUCTORS, INC. (Sept. 1992-Oct. 1992)
WATTS BAR NUCLEAR POWER PLANT
Spring City, TN
Assigned as a Hydro Engineer to the Startup Group. Responsible for scoping systems, initiating work request for test packages and performing technical reviews on test packages prior to ANI/QC reviews. Certified as a Test Director, Level II to perform tests.
Assigned as a Startup Test Engineer, Level II to the Startup Group. Responsible for various NSSS and BOP flushing and preoperational test procedures and for setting work priorities and work schedules for Craft Support Group.
GENERAL PHYSICS CORPORATION (Aug. 1989-Mar. 1992)
SAVANNAH RIVER NUCLEAR POWER PLANT
Barnwell County, SC
Assigned as a Project Manager to the Power Operations Department. Responsible for seventy field engineers to collect data to update the Site Works System. Assigned to the Procedure and Training Upgrade Project as a Group Supervisor and was responsible for the site drawings and operational procedures upgrade. Assigned to the Power Operations as a Senior Specialist and was responsible for the review and implementation of Power Operations Facilities Component Identification Program which included system identification, system walk downs, labeling and red line drawings. Coordinate with site design engineering, area managers and plant operations engineers.
FLUOR CONSTRUCTORS (Mar. 1989-Aug. 1989)
CALLAWAY NUCLEAR POWER PLANT
Callaway County, MO
Assigned as a Mechanical & Piping General Superintendent. Responsible for all mechanical craft and during five year refuel outage. Responsibilities also included preparing work plans for project schedule and budget per site procedures.
GEORGIA POWER COMPANY (1985-1989)
ALVIN VOGTLE NUCLEAR POWER PLANT
Burke County, GA
Assigned as a Startup Engineer Level II to the NSSS Group. Responsible for various NSSS and BOP hydro flush and preoperational testing. Responsible for also scheduling startup support group, manpower and work hours.
FLUOR DANIEL CONSTRUCTION COMPANY (1978-1985)
CALLAWAY NUCLEAR POWER PLANT
Callaway County, MO
Assigned as a Superintendent. Responsibilities included installation of various piping systems and setting of major equipment. Assigned to work as a Startup Group Superintendent and was responsible for all craft working on the night shift.
SECURITY CLEARANCE
Unescorted DOE L clearance.
REFERENCES
Available upon request.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.