OBJECTIVE To secure a position that allows me to utilize my supervisory, budgeting and sequencing abilities in order to assist the company with bringing their projects to fruition while maintaining quality, scheduling and budgeting constraints
KEITH “ERIC†TIPTON
(754) 234-9645
5051 SW 95th Avenue, Cooper City, FL 33328
Email: melinda.tipton[at]gmail.com
OBJECTIVE To secure a position that allows me to utilize my supervisory, budgeting and sequencing abilities in order to assist
the company with bringing their projects to fruition while maintaining quality, scheduling and budgeting constraints
EXPERIENCE 04/04 - 03/09 Arellano Construction Company - Superintendent
04/07 - 09/08 (St. Catherine's West Rehab Hospital) $20 million
Construct three story Medical Facility in Hialeah Gardens, FL while maintaining AHCA and 100% ADA standards
Managed all aspects of the structure from installing reinforcing steel to placing concrete on a three story facility
 Liaison between subcontractors, competing and conflicting personalities
 Responsible for enforcing project safety
 Coordination of paving, curbing and sidewalks
 Manage the plans per specifications
 Coordinate with Geotechnical Firm all testing of concrete and soil densities
 Coordinate with subcontractor installation of all MEP's within the time constraints of the schedule
Passed all ACHA, (SNF) Fire and local inspections with minimum pickup items
Project completed within budget and on schedule
09/05 - 04/07 (UM Medical Campus, Clinical Research Building and Dr. Gordon’s)
Interior Build-out of 15 story building while the building was under construction
Construct Dr. Gordon’s training facility on the first and second floor - 2.5 million
State of the art training facility for paramedics, military and firemen
Coordinate all MEP's within the time constraints of the project
Simultaneously coordinate the core build-out of the other 13 floors 4.6 million
Coordinate with Bovis Lend Lease, the shell contractor on all interfacing of MEP's
Coordinate all material stocking for all trades and owner furnished equipment
Worked closely with the University of Miami in all aspects of construction
Coordinate with owner all interior build-outs on floors 7 thru 15
Simultaneously completed a smaller lab at Sylvester Cancer Center 1.5 million (ICRA)
All Projects completed on time and within budget constraints
Passed all ACHA , Fire and local inspections with no pickup items
06/05 - 09/05 (UM Cox Science Center and School of Architecture) 3.5 Million
Supervised all aspects of demo and reconstruction of two auditoriums
Maintained the schedule on a fast track - 10 week time line
Coordinated all MEP's demo and reconstruction
Same as above
Was called to go back to School of Architecture and complete the site work
Project completed on time and within budget constraints
Supervised 90 bed rehab renovation at Miami Heart
Completing within the time constraints of the schedule - 3 months
Coordinated all above and below floor tie-ins of MEP's
Coordinated all infectious control by maintaining negative air in the work space (ICRA)
All work completed while hospital was operational
Completed various projects in the two facilities
Passed all AHCA, Fire and local inspections
Project completed on time and within budget constraints
04/04 - 09/04 (UM School of Architecture Shell)
Supervised all aspects of the structure from footings and exterior walls
Coordinated the Lay-Out and site engineering
01/03 - 02/04 (Intown Suites, Tipton Interiors and Archer Western)
(Various Projects around Atlanta GA.)
Manage all aspects of interior finishes
Consultant/Superintendent
10/96 - 12/02 Skanska a USA Company – Superintendent
04/02 - 10/02 (Heraeus Tenevo Office Project) 5.5 Million
Field Engineering
Liaison between subcontractors
Demo existing parking lot to build a 10,000 SF facility
Managed all erosion control and daily inspections for the EPA
Coordinated all inspections
Delivered the Project within schedule restraints
Scored a 100 % on my safety audit
11/00 – 03/02 (CDC Lab #103, Atlanta GA) - Superintendent 25 million
All duties primarily same as above while training under and assisting the superintendent
In charge of all field activities and security clearance at (CDC)
Coordinated the installation of a 60,000 gallon underground fuel tank
Promoted from Assistant Superintendent to Superintendent
- Direct Supervisor: Terry Cadwell
KEITH “ERIC†TIPTON - (754) 234-9645
11/98 – 11/00 (Oconee Regional Medical Center ) – Assistant Superintendent 20 million
Built a four story addition onto existing hospital
The project had 75 caissons from 5’-0†to 7’-0†in diameter and up 75’ in depth
Coordinated the upgrade of the central energy plant which was located behind the existing hospital and never disrupted the
flow of patients - Cut in new temp road to allow traffic flow
Consisted of six Operating Rooms and twenty five ICU beds, six elevators and 65 patient beds
Delivered the Project within schedule and budget constraints
Passed all Local and State inspections
10/96 – 11/98 (R.W.ALLEN/Beers Children’s Hospital at MCG, Augusta, GA) – Punch list guru 65 million
ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ Coordinated all subcontractors in punch list activities
ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ ï€ â€¢ Coordinated all final inspections including Fire Final on the project
In charge of the renovation tie-in on 6 floors
• Assisted in getting C-O for the Hospital
The Project consisted of 12 Operating Rooms, 80+ ICU beds and 160 patient beds
PROFESSIONAL
â€¢ï€ ï€ ï€ ï€ ï€ ï€ Safety Certificates & Equipment/Tool Training
• Erosion Control
• Steel Erection
• Excavation & Trenching
• Scaffolding & Aerial Platforms
• Construction Fall Management
• OHSA 10-Hour Construction Safety & Health
• Fork-Lift & Earth-Moving Equipment
• Mobile Crane Management
• Hilti Powder Actuated Tools
Microsoft Excel, Word, Outlook and Expedition Primavera
Years prior to 1996
I started my career in the construction field right out of school in 1985 as a framer in the drywall industry
The first company I worked for was Carrington Drywall and Plastering and the project list follows
Marriott Courtyard Augusta, GA
Charter Hospital Macon, GA
Marriott Courtyard Columbia, SC
Marriott Suites 18 story Atlanta, GA. I was in charge of Architectural lay-out and framing crew 100+ men
18 story Hotel Pensacola, FL. I worked on the EIFS crew as an applicator
Then I went to work for Holloway Floors and Ceilings
Merchandise Mart 21 story Atlanta, GA
Leon Medical Panama City, FL
Kroger Shopping Center Douglasville, GA
Kroger Shopping Center Southern Pines, NC
Quality Inn Macon, GA
Kroger Shopping Center Raleigh, NC
Kroger Shopping Center Winston Salem NC
Shopping Center and 4 Movie Theaters Westin, WV
Shopping Center with 6 Movie Theaters Summersville, WV
Then I went to work for Barge and Wagner
46 story apartment building Atlanta, GA. (lay-out and framing)
Marriott Courtyard Atlanta, GA
UGA Veterinarian School
Then I went to work for Pursley Contracting
Savanna River Site (SRS) navel fuel offices
Fort Gordon Barracks remodel Augusta, GA
Fort Gordon Commissary remodel Augusta, GA
Charleston (AFB) Charleston, SC remodel barracks
Then I went to work for Omega Drywall 1989
Brandon Wilde Retirement Community Augusta, GA. In charge of lay-out and framing crews
School of Engineering at GA Tech (Foreman)
Carl Vincent VA Medical Center Dublin, GA (Foreman) 100k sf addition 1992
Gwinnett Place Mall Addition
Then I went to work for Billy Hail Construction 1993
Baptist Church Kennesaw, GA
Cartersville High School remodel Cartersville, GA
Shopping Center Beckley, WV
Mall stores Washington, DC
Then I went to work for Ken Browning Construction
Schlotzsky’s Deli (superintendent) job completed in 28 days Gwinnett Co, GA
Schlotzsky’s Deli Cobb Co, GA. job completed in 32 days
Several interior build-outs in high-rises around Atlanta, GA
Tipton Interiors (Superintendent) projects include 1996
Ingles Grocery Stores in Griffin GA
CVS Pharmacy Kennesaw GA
Ingles Grocery in Stockbridge GA
Ingles Grocery in Dacula GA
Then I went to work for Mid South Construction in Augusta GA 1996
Projects include
First Baptist Church Augusta GA
First Baptist Church Evans GA
Methodist Church Aiken SC
Then I went to Work for Cleveland Construction (foreman lay-out) 1997
MCG Children’s Hospital was approached by GC to work for them I declined
Eli Lilly Pharmaceutical Facility Raleigh Durham (foreman lay-out)
Returned to MCG and again was approached by GC and I was hired by Beers Skanska 1997
References upon request
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.