EDUCATIONAL ATTAINMENT : BACHELOR OF SCIENCE IN ELECTRICAL
ENGINEERING (1982-1985)
ASSOCIATE IN ELECTRICAL ENGINEERING
(1980-1982)
COMPUTER QUALIFICATION : WINXP, 2000, 98’, MS OFFICE-97
SPECIAL AWARD: : BEST EMPLOYEE YEAR 2007
SAUDI ELECTRICITY CO.– Eastern Operating Area ( H.Q.)
Transmission Asset Development Department ( TADD )
Transmission Estimating & Scheduling Division ( TESD )
SEMINAR ATTENDED:
TOPIC : SPORT LTG DESIGN & APPLICATION / AC& DC
POWER SUPPLY/ELECTRICAL WIRING & CONTROL/
BUILDING CONTROL SYSTEM / ETAP POWER SYSTEM
SOFTWARE
VENUE : Meridien Hotel, Al-Khobar ,KSA
DAY : June 20, 2008 ( One Day Seminar )
TOPIC : SUBST’N AUTOMATION &NEW IEC61850 STANDARD
VENUE : Holiday Inn Hotel, Al-Khobar, KSA
DAY : April 11,, 2007. ( One Day Seminar )
TOPIC : BUILDING MANAGEMENT SYSTEM (BMS)
VENUE : Meridien Hotel, Al-Khobar ,KSA
DAY : November 17, 2006. ( One Day Seminar)
TOPIC : BASIC LOGIC CONTROLLER & BASIC PLC
VENUE : Quick Chow Restaurant, Al-Khobar ,KSA
DAY : October 25-26, 2006. ( Two Day Seminar)
TOPIC : ADVANCED PWR.SYS. SOFTWARE & TRANSF.OIL TESTING
VENUE : Meridien Hotel, Al-Khobar ,KSA
DAY : July 28, 2006. ( One Day Seminar)
TOPIC : MICROSOFT ADVANCED EXCEL
VENUE : New Horizons Computer Learning Center, Dammam,KSA
DAY : Jan. 2-4, 2006. ( Three Days Seminar )
TOPIC : ENERGY SAVINGS, PWR SUBSTATION AUTOMATION
VENUE : Meridien Hotel, Al-Khobar ,KSA
DAY : October 18, 2002. ( One Day Seminar)
TOPIC : POWER QUALITY MONITORING SYSTEM
VENUE : Hotel Dhahran International, Dhahran
DAY : June 27, 2000. ( One Day Seminar )
TOPIC : Short – Circuit Calculation
VENUE : PICC, CCP, Complex, Manila
DAY : 26 AUG.’89 (One Day Seminar)
LIFE TIME MEMBER: : Institute of integrated Electrical Engineers of the Philippines, Incorporated (IIEE) ,13 December 2002
POSITION DESIRED: : ELECTRICAL ESTIMATOR (EHV)
SALARY DESIRED: : US $ 4,000/Month(Basic)
TOTAL EXPERIENCE : THIRTEEN (13) YEARS IN ABROAD IN ASIA &
MIDDLE EAST.
: Ten (10) YEARS IN LOCAL (PHILIPPINES)
WORK EXPERIENCE:
Feb. 02, 2005 – Present H.V. O/H TRANSMISSION LINE ESTIMATOR
( 5 YEARS )
SAUDI ELECTRICITY COMPANY
Admin. Bldg., Room 1-200E,SEC-EOA
P.O.BOX 5190,DAMMAM 31422
KINGDOM OF SAUDI ARABIA
Tel.00-966-3-857-2300 ext. 84920
Presently assigned as CAPITAL PLANNING & BUDGET ANALYST (Regular Employee) for Transmission Asset Development Dept.SEC, East Operating Area Office, Dammam, KSA.
1. Familiarize Scope of work,Single line diagram,sketches or drawings on package given by the proponent.
2. Do initial quantity take-off based on scope of work (SOW) and sketches or drawing.
3. Prepare MTO & Pricing for 115kV up to 380kV overhead ,Underground transmission line and Indoor GIS(Breaker & a half and double bus single breaker configuration),Outdoor SF6 Substation (115kV up to 380kV).
4. Type of estimate to be prepared are 40% study estimate , 20% Budget estimate & 10% company estimate.
5. Evaluate bid proposal of contractors and submit the analysis to the Division Manager.
6. Do change order estimate based on report of Site Manager and lead estimator.
7. Initiate /propose unit rate based on pricing submitted by three lowest bidders to lead estimator for approval of division manager.
8. To develop previous estimate template.
Company Estimate Prepared as of 2009
1) Hiteen 380/132Kv BSP(9005)- SR 500,000,000
2) North Ring 380Kv OHTL - SR 320,000,000
3) New 380/132Kv BSP#9017 - SR 886,000,000
At East Riyadh City
4) Jeddah N.W.380/110/13.8Kv BSP -SR 1,121,000,000
5) Ras Al-Zaur IWPP 380Kv Integ'n – SR 249,500,000
6) Shoibah -2 ,380Kv GIS Expansion – SR 85,000,000
7) Hail-Al Jouf 380Kv Interconn'n - SR 1,677,000,000
(370Km, 380kV D/C O/HT/L+1-380/132Kv Outdoor SS)
8) COA Reactive Compensation – SR 400,000,000
Company Estimate Prepared as of 2008
1) Jubail-2 380/230Kv BSP - SR 557,000,000
2) Expansion of PP-9 - SR 350,000,000
3) Expansion of PP-10 - SR 971,000,000
4) Namerah 380/132/13.8Kv BSP -SR 600,000,000
5) Qassim(9025) 380/132kV BSP – SR 560,000,000
6) Makkah West 380/110/13.8KV – SR 500,000,000
7) 380kV U/G T/L Kandarah-Jamiah BSP-SR 244,000,000
(26Km, 380kV D/C U/GT/L using 1x 2000mm2 XLPE)
8) 380Kv,D/C O/H Trasnmission Line– SR 400,000,000
(420kM(Qassim –Madinah)
Feb. 6, 2004 – Feb.03,2005 COST ESTIMATOR
( 1 YEAR )
Al-Othman Consultant
P.O. Box 3005,Al-Khobar 31952
Kingdom of Saudi Arabia
Tel.00-966-3-894-2727/2828/2929
Employed as contracted Cost Estimator for Saudi Electricity Company(SEC-COA) under Transmission Asset Development Department(TADD) / Transmission Estimating & Scheduling Division.
9. Familiarize Scope of work,sketches or drawings on package given by the proponent.
10. Do initial quantity take-off based on scope of work(SOW) and sketches or drawing.
11. Prepare MTO & Pricing for 115kV up to 380kV overhead transmission line and GIS Substation (115kV up to 380kV)
12. Type of estimate to be prepared are40% study estimate , 20% Budget estimate & 10% company estimate.
13. Evaluate bid proposal of contractors and submit the analysis to the Division Manager.
14. Do change order estimate based on report of Site Manager and lead estimator.
15. Initiate /propose unit rate based on pricing submitted by three lowest bidders to lead estimator for approval of division manager.
16. To develop previous estimate template.
JUNE 2002 - JUNE, 2000 ELECT'L & INSTRUMENT ESTIMATOR
( 2 YEARS )
AL-OSAIS CONTRACTING COMPANY
ELECTRO-MECHANICAL DIVISION
P.O. BOX # 1083, DAMMAM-31431
KINGDOM OF SAUDI ARABIA
1. Material take –off and pricing.
2. Initiate Unit Rate based on quotation pricing to lead estimator for approval.
3. Request of materials for sufficient electrical equipment suppliers, like ABB,SEIMENS,WESCOSA ISCOSA,SCHIENDER ELECTRIC & ALSTOM.
1. Material take –off and pricing.
2. Initiate Unit Rate based on quotation pricing to lead estimator for approval.
3. Request of materials for sufficient electrical equipment suppliers.,like ABB,SEIMENS,WESCOSA ISCOSA,SCHIENDER ELECTRIC & ALSTOM.
1. Material take –off and pricing.
2. Initiate Unit Rate based on quotation pricing to lead estimator for approval.
3. Request of materials for sufficient electrical equipment suppliers, like ABB,SEIMENS,WESCOSA ISCOSA,SCHIENDER ELECTRIC & ALSTOM.
OIL SWITCHES REPLACEMENT, ABQAIQ
ARAMCO PROJECT.(SR 43,000,000)
1. Material take –off and pricing.
2. Request of materials for sufficient electrical equipment suppliers, like ABB,SEIMENS,WESCOSA ISCOSA,SCHIENDER ELECTRIC & ALSTOM.
3. Prepare Monthly report to serve as a back-up for monthly billing.
4. Estimate from bidding stages up to construction stages of the project.
5. Familiarize construction specification & scope of work of the project.
6. Prepare pricing change order pricing of the on going project and submit the pricing proposal to lead estimator or project manager.
ELECTRICAL NETWORK UPGRADE-RIYADH REFINERY SAUDI ARAMCO PROJ.
(SR 28,000,000)
1. Familiarize construction specification & scope of work of the project.
2. Prepare pricing for change order for the project.
3. Prepare material take – off for Power Monitoring System(PMS).
4. Prepare material take – off and pricing for electrical tender proposal Aramco project such as:
a) Haradh Gas Development Project Industrial Support Facilities (External Works)
b) Al-Rariyah Electric Utilities Phase III North Dhahran, K.S.A.
DEC. 1998 – DEC.1999 ELECTRICAL ESTIMATOR
( 1 YEAR ) SUMATEC CORPORATION SDN. BHD.
KUALA LUMPUR, MALAYSIA
1. Estimate / Take-off for Tender / Bid proposal for Electrical and procured all necessary materials for tenders.
Following Tender For Bidding Puposes:
a) Proposed Zeolite Plant In Telok, Kalong Industrial Area, Kemaman, Malaysia. (RM 4,000,000)
b) Male International Airport Fuel Storage Expansion & Upgrading [at] Republic of Maldives. Onshore Slugcather Phase Two Gas Onshore Facilities, Kerith, Malaysia (RM 1,000,000)
c) Lightning Protection for 16 Buildings of Petronas Universities at Tronoh, Perak, Malaysia.Package #1 (RM 5,000,000.00)
1. Familiarize Specification and Scope of works.
2. Prepare material take-off quantities of Variation Order such as Mechanical Ducting Chilled water pipe, Plumbing, Fire Protection pipe and accessories.
3. Checking all submitted quantities & pricing based on quotation given by the sub-contractors.
4. Reconcile all additional works to owner.
ARCHITECTURAL ESTIMATOR
:HENZ CONSTRUCTION (HARBERT-ESPRIT- NAMFATT-ZAQ JOINT VENTURE) CONCERT HALL –KUALA LUMPUR CITY CENTER DEVELOPMENT PROJECT (FOR TENDERING WORTH US$157 Million)
1. Prepare material take-off quantities for architectural plan such as wood flooring, spray insulation, acoustic insulation, protected membrane waterproofing , joint sealant, plaster, gypsum board, glass fiber reinforced gypsum, glass fiber reinforced cement, ceramic tiles, acoustic tiles ceiling and etc.
MAY’93 – JUNE’96 ELECTRICAL ESTIMATOR
(3 YEARS) : A G A P ARABIA LIMITED ZULUF WET CRUDE
HANDLING FACILITIES –
SAUDI ARAMCO PROJECT) SAFANIYA, K.S.A.
1. Prepare estimate proposal for electrical and instrumentation change order.
2. Assist in the design and implementation of work activities which are additional to the main contract.
3. Prepare purchase requisition for any materials at the earliest time will be needed.
4. Responsible for the proper monitoring and execution of works for completion of project within the schedule and budget.
5. Prepare detailing works of additional electrical works.
6. Provide field problems resolution for any changes in field related to electrical and instrument works.
1. Assist in reviewing of issued for Construction (IFC) Electrical Drawing of building.
2. Ensure all works base on drawings and specification.
3. Prepare purchase requisition of materials needed in the construction
4. Prepare manpower and equipment schedules.
MAR’89 – FEB’91 ELECTRICAL FIELD ENGINEER
(2 YEARS) 69 KV SUBSTATION – PHASE IV PROJECT
CLARK AIR BASE, PAMPANGA
ATLANTIC GULF & PACIFIC COMPANY (AG & P)
MANILA, PHILIPPINES
1. Supervise in the preparation on the details of 69 kv substation equipment for Construction Quality Control approval.
2. Supervised other related electrical field works such as layout of cable tray, conduits and complete grounding system of the 69kv substation.
3. Assist in the design and implementation of work activities with are additional to the main contract.
4. Prepare local calculations, cable/wire, equipment and protective devices sizing.
FEB’88 – JAN’91 ELECTRICAL FIELD ENGINEER
(3 YEARS) MANILA INTERNATIONAL PORT-PROJECT
ATLANTIC GULF & PACIFIC COMPANY (AG & P) MANILA, PHILIPPINES
1. Preparation of electrical shop drawing which shows installation details of electrical equipment such as switch gear, power , lighting, panel and grounding system.
2. Supervised other related electrical field works such as layout of cable tray, conduit, fire alarm and heat detector.
3. Assist in design and implementation of work activities which are additional to the main contract.
4. Prepared load calculation, cable/wires, equipment and protective devices sizing.
JAN’85 – JAN’88 ELECTRICAL DRAFTSMAN
(3 YEARS) AP POWER SYSTEM ENGINEERING
41 ANO STREET, MANDALUYONG CITY
METRO MANILA, PHILIPPINES
1. Prepare and drafts electrical plan for both residential, commercial & industrial building
2. Responsible for collecting data from site prior to design of the propose project.
3. Prepare necessary calculation such as voltage drop and lighting illumination.
4. Prepare load calculations, cable/wires, equipment and protective devices sizing.
I hereby affirmed that the above information on this record is true and that I have nothing with affect my employment with the company.
Very truly Yours,
Alfredo A. Merced
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.