Senior Project Manager with over 20 years of domestic and international, engineering and management experience in the areas of power, petrochemical, chemical, pulp & paper and hazardous materials plant systems detail design, engineering, construction, procurement, contracts, cost and schedule implementation, operations, start-up, field service, logistics and proposals. Solid reputation on cost reimbursable and lump sum EPC projects, providing on time commitments, under budget, complemented by outstanding supplier and customer negotiating skills.
PROJECT TYPES ACTIVITIES
Conventional Coal and Oil Power Program Management
Plants Construction Consultant
Cogeneration Power Plants, Simple & Combined Cycle Logistics Manager
Nuclear Plants Project Director
Atmospheric and Pressurized Fluidized Bed Plants Manager of Projects
Pulp & Paper Plants Director of Engineering
Process Plants Senior Project Management
HWI Plants Project Management
Chemical Plants Project Engineering
Petrochemical Plants Project Controls
Remediation Projects System Start-up Services
Asbestos Removal Engineering and Design
SCR & FGD and Gas Cleaning Systems Expediting & Inspection
Oil Sands Projects P&ID & Flow Diag. Development
Plant Modifications Field Service Engineering
Design Build & EPC Projects Procurement & Contracts Manager
PERSONAL DATA REGISTRATIONS
B S Mechanical Engineering - Ohio Northern University No. 49715, Texas
Courses, Engr. Management, Northeastern University No. 18327, Arizona
Member/Executive Member, ASME
Member Coal Technology Conference
ASSIGNMENT HISTORY
CH2M HILL Lockwood Greene 2.5 years
WGI / CMC / SGT 3.5 Years
AMEC E&C Services, Inc 2.5 Years
Raytheon Engineers & Constructors/WGI 2 Years
GE International, Inc. 9 Months
OHM Remediation Services Corp. 3 Years
Ford Bacon & Davis, Incorporated 9 Years
Brown & Root U.S.A., Inc. 3 Years
Stone & Webster Engineering Corporation 11Years
Westinghouse Electric Corporation 2 Years
ACCOMPLISHMENTS
• Project & Program Manager on cost reimbursable and lump sum engineering, procurement and construction projects.
• Directed project management department, procurement department, and directed process and engineering departments.
• Senior Project Manager/Program Manager – Oil Sands Mine and 180,000 BPD and Upgrader, valued at over $700 MM.
• Project Director, in Wales, UK on a 390 MW, coal fired power station refurbishment project valued at over $130 MM USD.
• Senior Project Manager on 2 over 1 Combined Cycle Power Plant, valued at over 300 MM USD.
• Directed and managed the engineering, procurement, construction and commissioning of the first Urea Plant to be built in the US in over 20 years.
• Project Manager/Consultant providing guidance to Deutsche Babcock Anlagen on a cogeneration plant that was built in Spain.
• Directed and managed the engineering, construction and commissioning of the first and only Fluidized Bed Rotary Reactor built in the world.
• Directed and managed the design and engineering for the first Von-Roll Gas Cleaning System ever built in the US.
• Prepared and implemented procedures for ISO 9000 certification
• Educated in the Quality Improvement Process and implemented “Quality in the Work Placeâ€.
• Principal Engineer on the first coal re-conversion project for the New England Power, Brayton Point Station.
• Principal Engineer and Designer on one of the first Atmospheric and Pressurized Fluidized Bed Power Plants developed in the US.
• Consultant and Logistics Manager for international 4 over 2 Combined Cycle International Power Plant.
• Procurement and Contracts Manager for steam generator replacements in operating nuclear plants.
• Project Procurement Manager for SCR Project which was a $400 MM dollar installation.
• International work experience in over 10 different countries working with companies and personnel from all over the world.
• Voted ASME Mechanical Engineer of the year.
CHRONOLOGICAL EXPERIENCE
Nov 2006 - Feb 2009 – SENIOR PROJECT MANAGER/PROGRAM MANAGER - CH2M HILL – PCOSI Oil Sands Project, Calgary, Alberta Canada Small Energy Projects in Atlanta GA
Project/Program Manager for Infrastructure Utilities Silo for Petro Canada Oil Sands Inc. – Responsible for the management of engineering, procurement and construction activities for the FEED designs for these silos for both the Mine Site and the Upgrader Site. Mr. Gordon handled all coordination with the client including review and approval of all design and commercial activities for the Project Team. The project was initially 10 MM CAD and was changed to 20 MM CAD. The Project Team is currently negotiating a Joint Venture to complete the detail engineering and procurement activities and construction for a sum of approximately of 700 MM.
Apr 2005 - Oct 2006 – PROCUREMENT/CONTRACTS MANAGER – Washington Group Denver CO Syncrude Emissions Reduction Project – Fort McMuray, CN
As Procurement and Contracts Manager Mr. Gordon was responsible for the functional and day-to-day operations of the Purchasing, Subcontract Administration and Warehousing and Inventory Control for this Project. Mr. Gordon managed 7 purchasing, subcontract administrators, expediters and logistics personnel, providing technical and commercial support. Mr. Gordon reported to the WGI Project Manager and worked very closely with the SERP client personnel. The Project TIC is $700 MM. The procurement system that we used was MARIAN (Smart Plant)
Dec 2004 - Apr 2005 – PROCUREMENT/CONTRACTS MANAGER – Washington Group Subsidiary Cascadia Monorail Company, LLC (CMC)
CMC is a joint venture of WGI and Fluor to build the Seattle Monorail Green Line, a 14-mile monorail through the city of Seattle. Mr. Gordon’s position was to provide contract administration and negotiate the major contracts with domestic and foreign companies and others for the equipment and materials that will be used for the building of the Monorail. This project was valued into the 10-figure range.
Sep 2003 – Dec 2004 – CORPORATE PROCUREMENT MANAGER – Washington Group Joint Venture - THE STEAM GENERATING TEAM, LTD., CHARLOTTE, NC
As Corporate Procurement Manager Mr. Gordon was responsible for the functional and day-to-day operations of the Purchasing, Subcontract Administration and Warehousing and Inventory Control for all of the Steam Generator and Reactor Head Replacement Projects that SGT had under contract. Mr. Gordon managed 20 purchasing, subcontract administrators and warehousing personnel providing technical and commercial support while forecasting and placing personnel to support the 5 projects and proposals that are currently ongoing at SGT. Mr. Gordon reported to the Senior Vice President of Operations and worked very closely with the SGT CFO. These Projects were valued from $50 MM to $250 MM. We initiated the use of MARIAN (Smart Plant), on these projects, for SGT.
Apr 2001 – Sep 2003 – SENIOR PROJECT MANAGER – AMEC E&C SERVICES, INC. – ATLANTA GA
Senior Project Manager on the UCB BIOPRODUCTS LABORATORY PROJECT, Mr. Gordon was called upon to complete this project, which was having management and subcontractor problems as well as client issues. Mr. Gordon handled all of these issues, and the project is now completed and the client is happy with his new facility. Project included management of construction, start-up and commissioning.
MIRANT BOWLINE COMBINED CYCLE POWER PLANT (CCPP), Haverstraw, NY, for Mirant. AMEC competitively bid and won the Mirant Bowline CCPP Engineering, Design and Procurement Services Project with Mirant in June 2000. Responsibilities included managing engineering budgets and development of a TIC Project Cost Estimate, profit and loss management, engineering coordination, design review and management and review of procurement activities as well as cost and scheduling activities. Project value $500 MM.
Jul, 1999 – Mar 2001 - PROJECT MANAGER - LOGISTICS, CONSTRUCTION CONSULTANT – RAYTHEON ENGINEERS & CONSTRUCTORS / RAYTHEON CONSTRUCTORS, INC/WGI – PRINCETON, NJ
Construction Consultant / Assistant Project Manager / Project Manager, ILIJAN COMBINED CYCLE POWER PLANT, Batangas, Philippines. Responsibilities included providing consulting services to a 1200 MW Combined Cycle (4 over 2) Power Plant. These consulting services include constructability reviews and interface with the engineering staff. Mr. Gordon was in charge of the logistics for this project and was responsible for the delivery of 76,000 freight tons of equipment along with the management of the payment of the duties and taxes and complete interface with the freight forwarding company. Equipment was shipped from around the world and delivery was by plane and ship to the Philippines. Mr. Gordon also developed logistics and material management procedures and a complete Construction Management Plan for the Project. His work and responsibilities included procurement interface as well as transportation of the equipment to the Philippines. Interface with the subcontractors, project partners and the client was also a part of his job. Project value over $ 600 MM
AUG 1998 – MAY 1999 - PROJECT DIRECTOR - GE INTERNATIONAL. POWER SYSTEMS, ATLANTA, GA
Responsibilities included subcontract and contract administration, project coordination, supervision, managerial expertise, and profit and loss management, scheduling and cost control and client interface at all levels for a Power Plant Refurbishment Project in Wales. Project value $ 130 MM
SEP 1996 – JUL 1998 - SENIOR PROJECT MANAGER - OHM ERVICES CORP., ATLANTA, GA
Responsibilities included subcontract and contract administration, project coordination, supervision, managerial expertise, profit and loss management, scheduling and cost control and client interface at all levels.
SEP 1994 - Sep 1996 - MANAGER OF PROJECTS, DIRECTOR OF PROCESS AND ENGINEERING AND SENIOR PROJECT MANAGER - FORD BACON & DAVIS, INCORPORATED SALT LAKE CITY, UT; HOUSTON, TX AND ATLANTA, GA
Responsibilities included coordination, supervision, technical and managerial expertise and review, leadership, budgets, profit and loss management, procurement, contract management, and engineering and construction management and cost estimates. In addition, as Director of Engineering, responsibilities included the development and management of company procedures/standards, and quality assurance and quality control of design and engineering on many different types of projects. These positions required personnel interaction and client interface at all levels and human resource functions.
Oct 1988 – Sep 1994 - SENIOR PROJECT MANAGER - FORD BACON & DAVIS, INCORPORATED SALT LAKE CITY, UREA PLANT PROJECT, CHEYENNE WYOMING
Responsibilities included budgets, profit and loss management, engineering, design and construction and commissioning coordination and management, procurement activities, cost and schedule review and implementation, forecasting of costs and manpower, and contract management. Client interface and management was also part of this project management position on the EPC of this Urea Plant
JUL 1984 – SEP 1987 - PROJECT MANAGER - BROWN & ROOT USA, INC., HOUSTON, TX
Responsibilities included budgets, profit and loss management, engineering, design and construction coordination and management, procurement activities, cost and schedule review and implementation, forecasting of costs and manpower, and contract management. Proposals and client interfacing was also part of this position along with promoting the sale of Fluidized Bed Technology.
APR 1981 - JUN 1984 - PROJECT ENGINEER/PROJECT MANAGER - STONE & WEBSTER ENGINEERING CORPORATION, HOUSTON, TX
Managed and coordinated purchasing, cost and scheduling, engineering and design activities as an Assistant Project Manager. As a Project Engineer, I developed and coordinated technical input for domestic and over-seas proposals as well as the development of project controls for power and petro-chemical projects, including scheduling, cost control, man-hour estimates and budgets. Mr. Gordon worked as engineer on nuclear plant in quality control the department.
APR 1973 - MAR 1981 - PROJECT ENGINEER/SYSTEMS ENGINEER - STONE & WEBSTER ENGINEERING CORPORATION, BOSTON, MA
Responsibilities included the detail design and engineering for a variety of power plant systems on numerous power projects. Other responsibilities included involvement in purchasing engineered equipment, contract administration and construction coordination. In addition, as a Systems Engineer, Mr. Gordon developed standard system flow diagrams for all of the process systems used in power plants.
JUL 1971 - MAR 1973 - FIELD SERVICE ENGINEER - WESTINGHOUSE ELECTRIC CORPORATION, BOSTON, MA
Responsibilities included field service engineering, installation and service on steam and gas turbines, generators, condensers, feedwater heaters, and boiler feedwater turbines on fossil (coal & gas) and nuclear plants. Supervised craft labor and held a secret clearance
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.