Dear Sir or Madam,
I am seeking a position as a Commercial Construction Superintendent
Thank you for your time and consideration.
Very Truly Yours,
WILLIAM M. WOOD
William M. Wood
COMMERCIAL CONSTRUCTION SUPERINTENDENT
Commercial Construction Superintendent with a 15-year record of success overseeing all phases of multimillion-dollar vertical and tilt wall concrete construction, infrastructure and site to turnkey for private-sector clients. Experience includes managing subcontractors and crews of in house employees and a variety of other construction/demolition projects. Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions.
Key Skills
— Construction/Demolition Projects
— Infrastructure Improvement Projects
— Concrete Tilt wall Projects — Site Safety/OSHA Compliance
— QA/QC/Field Engineering
— Positive interaction with Design professionals — Scheduling & on time completion
— VE participation
— Subcontractor/Crew Supervision
Employer Summary
WELBRO BUILDING CORPORATION — Site Manager II ,12/96 to 9/09
During tenure completed RDV Sportsplex $80m, 1500 unit Holiday Inn Worldgate $150M, 800 unit Crown Plaza Hotel $80M, 1500 room 16 story Championsgate Hotel and Convention Center, $170M,16 story 1489 room Rosen ShingleCreek Resort and Convention Center(1.9 million sq.ft. under roof) and $100M 17 story 1500 unit Omni Hilton Hotel and Convention Center
Project Highlights
Omni Hilton (completed Sept. 2009)
Managed QA/QC; Punchlist I Hotel and Airwall remediation in Convention Center
Rosen ShingleCreek Resort and Convention Center (2006 to 2009)
Responsible for: 600+ tilt walls ranging from 20,000lbs to 210,000lbs. oversaw forming to install; Install Structural steel trusses 160’ to 300’ long clear span. Supervised place and finish of 1 million sf of concrete 6†reinforced SOG and elevated concrete slab on structural steel/decking. Complete interior build out of Convention Center including multi level escalators. Supervised install of 800SF. Of TPO Roofing; Voted ABC and AGC Eagle Award for 2008
Championsgate Hotel and Convention Center (2003 t0 2006)
Responsible for turnkey from post tension slabs, interior/ exterior framing, EIFS skin to owner acceptance of 1500 hundred rooms Voted ABC Eagle Award for 2005
Other Construction Projects(1996 to 2003)
FairField at Sandestin: Supervised 6 story 24 unit time share with garage at first floor; Crown Plaza Hotel selected structural demolition and rehab; RDV Sportsplex Supervised all split face and regular block work, prestressed exterior walls on structural steel columns and beams and indoor swimming pools, spas and dressing areas. Voted ABC Eagle Award 1999
Education & Certifications
VALENCIA COMMUNITY COLLEGE (Orlando, Fl) — AA, 1984
Florida Certified General Contractor (Active since 1986)
LEED AP 2009
Also Certified in Construction Safety OSHA 10 hour, SWEPPS and First Aid/CPR
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.