To obtain a position as a Superintendent, that will utilize my talents, knowledge, and 20+ Years of experience and offers the opportunity for professional and personal growth.
521 Market St, Denton, Md 21629410-479-0281 ( H )443-907-6035 ( C )familygraham521[at]comcast.net
GREGORY LEE GRAHAM
Objective Experience To obtain a position as a Superintendent, that will utilize my talents, knowledge, and 20+ Years of experience and offers the opportunity for professional and personal growth. November 2007- July 2009 The Gilford Corporation Beltsville, MdPrevious Projects:· Cornerstone Peaceful Bible Baptist Church- The completion of a 56,000 square foot – 2 level facility, to be used as a K-12 Christian School, with full size gym, full service commercial kitchen, and office space. Lower level, 31, 400 sq ft, Upper level, 24,500. Brick and Eifs exterior, with a block, and drywall interior.· Mayfair Mansions Community Center- A LEED Certified, 12,000 square foot, 1-story building comprised of a wood framed and block structure, with a brick veneer. The building is designed to support the community with Maintenance , Rental Offices, and after school homework and teaching facilities. It also houses the pool equipment room, and security center for the surrounding 17 Buildings that comprise Mayfair Mansions Apartments.Duties Include:The maintenance of the progress schedule, and projecting the work requirements Supervising the trades, and conducting progress meetings in order to keep the coordination between trades.Maintaining as-built drawings, Daily reports, field logs, submittals, contracts, RFI’s, Change order files for use and reference in the field.Coordination between the Architect, Engineer, Owner and the Sub contractors.Planning ahead, scheduling Inspections, and tests as needed, and planning delivery of items consequence.Quality Control and the implementation of the Rolling Completion List.Coordination and assembly of Close out documents, warranties, and O&M Manuals for turn over to the owner.Closeout of the project, and negotiation of the Lien Waivers, and final payments as they relate to Change orders, Contracts, Etc. July 2007- November 2007 Hi-Tech, IncorporatedPrevious Projects:· Newseum Residential, Washington, D.C.- The touch up and restoration of kitchen cabinets and entry doors damaged by the construction process· The Eclipse Condominiums, Crystal City, Va.- The restoration of cabinets and entry doors for Balfour-Beatty Construction. Duties Include:Maintaining time and material records, and specific documentation for punch list completions.Completion of the touch up, and presentation to the owner’s representative for sign off.Maintenance of the occupied areas, where the work was being performed.Interaction with the Owners, Builders, and the Architect.April 2006- July 2007 Gardiner and Gardiner, General Contractors, LLC Crofton, Md Previous Projects:· Barbaro Office Bldg- the Ground up construction of a 10,000sq ft, $2 million dollar block and precast shell and core, along with the tenant spaces. · Valley Proteins – The completion of a 15,000 sq ft, $1.7 million dollar, structural slab and the installation of 2500 sq ft Pre- engineered Metal Building to use as a warehouse/ storage facility.· Community Center at Woods- The ground up construction of a 35,00 sq ft, $3.5 million dollar, community center and office spaces to be used as a gymnasium and meeting center in the Severna Park Area.· Criswell Collision Center- The Ground up construction of a new, high end, 44,000 sq ft, $3.8 million dollar body shop and repair facility/ Office spaces, in the Annapolis areaDuties Include: Project Management , to include Constructibility reviews, purchasing of long lead items, writing scopes of work and assignment of each to trades. The scope review with the best bid sub-contractors. The comparisons of scopes, and the buy out of sub- contracts.The coordination of drawings for the use in the field, document control set-up, the review of submittal packages for submission to the AE. The formulation and review of the requisition procedures in accordance with the specifications and policyThe maintenance of a rolling completion list, and Meeting minutes, between the Owner, Architect, and Engineer. Also the documentation of meetings weekly between Subcontractors. The formulation and updating of the project Schedule. Reviewing Daily Reports, and the assistance in maintaining the project schedule, in conjunction with the construction activities. March 2005- April 2006 Chesapeake Construction Group, Inc. 25 Main Street, Reisterstown, Md Previous Projects: · Food Lion Renovation, North East, & Elkton Stores. The Buy out and Estimating of the interior and exterior renovation of the entire store, including new fixtures, flooring and paint and plumbing changes. The overseeing of the completion of the work and the coordination of the trades, and the operation of the facility. · Fairwood Green Community Center a Safeway anchored $12.8 M, new shopping facility in Bowie, Md. Duties Include:Estimating and Preconstruction on the projects. Writing and formulating scopes of work. Writing, formulating and reviewing contracts. Reviewing Bid Proposals for complete scopes of work.Buying out of the trades and general conditions.Establishing Baseline schedules as it relates to the General Contract and formulating a project schedule to allow for the completion of the project on time, and within budget. Overseeing the project progress and keeping daily reports and documentation that tracks the progress and related items, (i.e. weather, manpower, safety issues, subcontractor progress, equipment, etc.)Maintain and update required logs to track changes, submittals, plan revisions, etc.Post and maintain the correct drawings for documentation, and use by the owners and users.Review and track proposals, Change order Requests, RFI’s, and Payment Requests. Maintain and enforce the Safety requirements set forth by OSHA, and in accordance to the Company policy.Sept- 2004- March 2005 Smith Management Construction, Inc Arlington, Va. 22202PROJECT SUPERINTNDENT Project:· Northern Va. Community College, Loudon Campus Science Building Addition And Renovation Duties Include:Coordination of Subcontractors to facilitate the completion of responsibilities on timeReview work as it proceeds, and assists in clarifying any discrepancies associated with the plans. And assuring that it gets to the proper Consultant for clarification and response in a timely manner.Review scopes of work and to insure compliance with Plans and SpecsTimely and Daily Reporting to insure that an updated record of activities is maintained, along with documentation of the progress, and the updating of the Project Schedule, along with the creation of a 3- week look ahead schedule to use as a coordination tool. Implementation of the Safety Plan and VOSH, as required by SMCI.Have been designated to the Corporate Safety Committee, to help redefine and establish a new corporate policy, in order to establish a safer work environment and to assist in the reduction of costs associated with today’s work place. Coordinating inspections and quality control as required by the State.Dec. 2003- Sept, 2004 Konover Construction Corp Columbia, Md. PROJECT SUPERINTENDENTProject· Coastal Ecology Teaching and Research Lab. – University Of Maryland- Eastern Shore. A 3.5 million dollar wood framed structure designed to blend in to the surrounding environment and provide a modern and efficient facility to do Research for the preservation of the Sinepuxant Bay in Berlin Maryland. Duties Include:Coordinating and scheduling trade contractors to complete the project in the allotted timeBuy out of trade contractors, recommendations for the establishment of scopes of work, and reviewing submittals prior to review by t he ArchitectEnforcement of the Safety plan as Outlined by Konover and reviewing and implementing the Trade Contractors Safety plan.Daily reporting of the scheduled activities and the impact on the Schedule, maintaining the Schedule updates and the Documentation of information as it effects the completion of the project.Maintaining and reviewing contracts, and insuring that scopes of work are correct and completed and meet the needs of the project and will allow the project to be completed on time and within budget.Maintaining AS BUILT drawings for record, to be used by the owners and users for information.Mar 2003- Dec 2003 DPR Construction, Inc. Falls Church, Va. PROJECT SUPERINTENDENTPrevious Projects:· SFO-002, State Department facility used for electronic security personnel assigned to the embassy forces for staging overseas. Major structural renovations and upgrades of office spaces and building. A 6.5 Million dollar renovation accomplished in 4 Months.· Bank of America, Perring Parkway and Joppa Rd. The demolition of an Existing Facility and replacement with a new 4600 square foot modernized Banking Facility. Duties include:Coordinating and scheduling of the Trade and Subcontractors sequence of workAssisting in the scopes of work and buy out of subcontractsImplementing the rigorous safety standards, and upkeep of the documentation required by DPR Construction, Inc.The Daily reporting of manpower, cost codes, Safety Audits and the maintenance of Daily reports and files required by DPR Inc.Formulating and implementing a working schedule for both coordination purposes and to be used as a guideline for shipments, work, manpower, and equipment required to complete the project on time. Overseeing and emphasizing the quality aspects of the project and coordinating the work with the owners and users requirements.
1997–2003 Gilbane Building Company Laurel, MdGeneral Superintendent Duties Include:Coordinating and scheduling Trade Contractors sequence of workEstimating Change Orders, and Verifying their CompletionUpdating Project ScheduleImplementing Safety Plans (Contractors, Sub-Contractors, and OSHA)Maintaining Daily Logs, InspectionsOverseeing the field operations of the project, and the completion of work in accordance with requirementsPart of the Commissioning team at both the Jennifer Road, and Ordnance Road Projects, responsible for Quality Reports, Start up Documentation and Videos, and Completion according to plans and specsPrevious Projects:· 2001-2003 University of Maryland, Center for Environmental Science, Aquaculture& Restoration Ecology Laboratory – A $25 Million, 63000 Sq Ft. Laboratory and Office /Classroom Facility for aquaculture research· § 2001- George Washington University-$2 Million, renovation and upgrade of telecom systems in the dorm facilities, and renovation of 3 existing dorm facilities· § 2000- 2001 NHI/National Cancer Institute- $12 Million, Renovation and relocation of all office spaces in the Executive Blvd Facility, Including furniture, Move Management Services and temporary relocation during renovation.· § 2001 Park Ave. Condominiums, Atlanta Georgia, $ 100 Million, Luxury Condominiums, I was sent to assist in completing the units in order to allow the owners occupancy. They were units that ranged from $650 K- $1.8 M, and are considered one of the most prestigious locations in North Atlanta.· § 1998-2000 Jennifer Rd Detention Facility-$18 Million, Renovation of the existing occupied facility and the construction of new office spaces and maximum-security spaces, for Anne Arundel County, Annapolis, Md. · § 1997- 1998 Ordinance Road Detention Center- The completion of a $20 Million new minimum security detention facility, for Anne Arundel County, in Glen Burnie, Md.· § During this period, I have been awarded two(2) Corporate Safety Awards, And just recently was awarded the Thomas and William Gilbane Project Achievement Award, for the efforts at the NIH/ National Cancer Institute Renovation Project
1990-1997 Greenbrier Architectural Woodwork Ronceverte, WVaSuperintendent/ Installation Manager Duties Include:Field Layout, mockups, field dimensions and interface between associated and effected trades.Coordination and scheduling of deliveries, manpower requirements, equipment and required supervision for the completion of several jobs at once, attended project meetingsCoordinated the Installation of all Jobs in the MARO RegionDesigned installation techniques, to increase efficiency.Estimated jobs for bids, (hard and change order work)Material and equipment take –off, required on multiple projectsPrevious Projects:· 1997 US AID,& Ronald Reagan Auditorium [at] Federal Triangle, Washington D.C. $2 Million Installation, of casework and auditorium paneling, stage and furniture· 1996-1997 United States Training Center, Natural Resources, Parks and Recreation, Shepardstown, W Va. A $ 2.5 Million installation of casework and associated woodwork and the completion of monumental stairs.· 1996 Federal Energy Reserve Commission, Washington D.C. A $1.5 Million installation of paneling systems, judges benches, judges chambers doors, Hardware and associated systems· 1996 Panther Stadium, Mint St., Charlotte, N.C. A $4 Million Installation of luxury boxes, concession stands, furniture, lounge paneling, bars and railings for the NFL Franchise Carolina Panthers· 1994-1995 United States Courthouse, Southern District, Greenbelt Md. The $5 million dollar installation of Millwork paneling, judge’s chambers, judges benches, seating and Stretch wall Systems. This job received the WBC Craftsmanship Star Award for Visual Excellence- March 10, 1995 · 1990-1995 Holy Cross Hospital, Silver Spring, Md. A $1 million installation of casework, doors, hardware and general trade items during the renovation of an operational hospital· 1995 Patuxent River Naval Air Station, Multiple Projects, A $1 Million project that included installation of casework l, laboratory fixtures, doors, hardware, etc.
Education 1974-1975 Florida Community College, Jacksonville, Fla. General Studies1974-1976/1979-1980 Central Virginia Community College Lynchburg,Va Business Management.
Interests Coaching NFL Flag Football, Little League Baseball, Travel Baseball, American Legion Baseball, Member – American Legion, Post 29
Summary of Qualifications Experienced in field and management liaisonExperienced in take-offs and estimating Have a working knowledge and understanding of OSHAHave a working knowledge of Sure Trac, Primavera and CPM SchedulingExperienced in procurement procedures for labor, material and equipmentHave a working knowledge and understanding of ANSI, BOCA, NECA, AWI, NFPA codes and their applicationHave an understanding and working knowledge of Microsoft Business Products (Excel, Word, Outlook) and Prolog Project Control SystemsHave certificates of training for competent persons in Scaffolding Erection, and Trenching& Excavation, First Aid, CPR, 10Hr OSHAHave experience in Commissioning Buildings,maintaining project records, and quality reports, and documenting start up procedures, to Include Electrical Systems, Fire Suppression Systems, Building , and Mechanical Systems
Military U. S. Army Europe – 8th Infantry Div
August 1971 – August 1974
Honorable Discharge-Aug. 09, 1974- Vietnam Era Veteran
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.