To run a job for a company and help them make money.
Robert Paris
e-mail – bassackwerdz[at]hotmail.com
Superintendent with over 30 years experience
Responsibilities
1 Supervision of all construction activities on the job
2 Coordinates all subcontractors and suppliers
3 Works with Project Manager and engineers with schedule
4 Monitor all job activities for compliance with drawings and specs (Quality Control)
5 Deals with Architect and engineers for questions and RFIs.
6 have weekly job meetings with subcontractor foreman.
7 Area of expertise Drawings and layout of all work
8 Assist in checking submittals and shop drawings
9 Responsible for all safety on the job
10Attend owner meetings with architects and engineers
Certifications,
30 Hour OSHA course
First Aid, C P R and Defibrillator
Competent person for Scaffolding, Excavations, and Fall Protection
Green Card for Sediment and Erosion Control
Corp of Engineers Quality Control Course.
Professional Experience:
2-23-2007 to 11-06-2009 Winter Construction Co. Atlanta, Ga.
Project Superintendent
New Mortimer Jordan High School , Kimberly Al.
over 200,000 sq. ft State of the art high school.
Bridge Street Town Center, Huntsville,Al.
6 Story Class “A†Office Building Structural Steel Frame ,concrete foundations with caissons.
Base building precast Conc. and curtainwall façade
Restrooms,Elevator lobbies amd mechanical Electrical rooms on all floors. Basement tunnel from parking garage to elevator lobby.
2005-2006 Tocci Building Corp. Woburn, Mass.
Superintendent
Dobson Mills Luxury Apartments- Philadelphia Pa. 8 four stories framed 32-40 unit buildings on stem wall foundations and concrete slabs. A five story structural steel parking garage in the middle with stairways and bridges connecting to the buildings.
2002-2005 Skanska USA Rockville, MD
Peoject Superintendent
* Good Samaritan Hospital - Baltimore Md. 4 story concrete structure with two levels parking and first floor new ER and second floor shell, new elevators and new entrance canopy. Renovation building 172 Washington Navy Yard, Washington DC Demo complete interior and replace all mechanical system and all new windows throughout. Some historic restoration on facade. IBM building Bethesda Md. Complete renovation of third floor demo to move in. Commercial Vehicle Inspection Facility, new entrance on Rockville Pike large inspection canopy and support building.
2000-2002 Sigal Construction Washington D C
Project Superintendent
George Washington University/Mt. Vernon College, Washington, DC; built 4-story concrete dormitory integrated into existing dormitory; concrete parking structure with athletic support, offices, shower rooms, and eleven tennis courts on top; synthetic turf soccer field and softball field; rehab another dormitory, dining room and pub. Demo on some existing buildings where new building tied in. Challenging earth work and site work with tall mesa block retaining walls.
1999-2000 Nardi Construction Beltsville, Md.
General Superintendent
Evangel Temple, Central Ave. Upper Marlboro, Md. 2500 seat church with stadium seating and elaborate stage with lifts on the sides. Office area next to the sanctuary, structural steel building with brick facade and large stained windows and a tall steeple. Concrete foundations and intricate concrete slab work.
1989-1999 Chas. H Tompkins Co. Washington D.C.
Superintendent, Chief Field Engineer
Safeway Eastern Distribution Center, Collington Md. Area Supt. 9-months. Bachelors Enlisted Quarters U S Naval Station, Annapolis Md. Superintendent 1 year. Federal Triangle Building (Ronald Reagan Bldg.) 13th and Penn. Ave. NW Washington D C. Stone contract 1 year Superintendent. Concrete contract 3 years Chief Field Engineer. Federal Judiciary Building 2nd and Mass. Ave. NW Washington D C 1.5 years Area Superintendent. National Education Agency 16th and M Streets NW Washington DC Area Superintendent and Chief Field Engineer 1.5 years. Washington Post Plant addition Springfield Va. Area Supt. 6 mo. 2001 I Street NW Washington DC.
1976-1989 IUOE-Local 77D Washington, DC Instrument Man (1976-1979) to Party
Chief (1979-1989)
Piscataway Sewage Treatment Plant; 1.5 yrs.; S.A. Healy Co. Cove Point Liquid Natural Gas Plant; 1 yr.; M.K. Energy Systems. Hart Senate Office Bldg.; 3 yrs.; Elizabeth Iron Works; General Concrete; Baltimore Contractors; & Dan Lapore & Sons. Metro Wheaton Tail Tunnels; 1 yr.; Dillingham-Obeiashy Sewage Treatment Plant; Virginia; 1 yr.; M.M.R. Wallace (Mechanical Contractor). Central Maintance Facility; 1 yr.; Jones & Artis Co.
Metro A-6 & A-9 on the red line tunnel; Head Engineer; 2 yrs.; Morrison-Knudsen Co.
1972-1976 Greenhorne & O'Mara
Surveying
Rodman to Party Chief
Outside Experience:
CHAS. H. TOMPKINS CO. WHILE IN UNION; OFF-AND-ON FOR APPROXIMATELY 7
YEARS National Geographic, M St., Washington, DC Daon Bldg., 1300 New York
Ave., Washington, DC Aerospace Bldg., 9th & D Sts., Washington, DC Army-Navy
Club Bldg.; 17th & I Sts., Washington, DC American University, Tenely Campus;
Wisconsin Ave., Washington, DC Office Bldg.; 1333 G St., Washington, DC
Project Experience
New Mortimer Jordan High School
Kimberly Al.
Moved over 300,000 yds of dirt to start foundation work , had 75% foundations in and some slabs poured. Masonry construction ,Walls in the two story area for hollow core second floor.
Bridge Street Town Center- 6 Story Office Building
Structural Steel building with concrete foundation , with caissons
Base building work Core work on all floors, precast concrete and curtainwall façade.
$12.000.000 Huntsville, Alabama
Dobson Mills - Luxury Apartments
A- Eight different buildings with concrete foundations and Framed four stories above.
Each building had 14 - 22 units per building All were attached to a five story structural steel parking facility.
$47,000,000 Philadelphia, Pa.
NIH Commercial Vehicle Inspection Facility
Steel and concrete structure and a large canopy for inspections of all trucks entering NIH.
New entrance from Wisconsin Ave.and a bridge across a running creek.
$6,000,000 Bethesda, Maryland
IBM Building,
Complete renovation of 3rd floor complete demo with all new state of the art offices and cubicles as well as all new mechanical system.
$2,000,000 Rockville Maryland.
Building 172 Washington Navy Yard
Complete Renovation of old building built in early 1900s. And all new mechanical system elevators windows and some façade rework.
$6,000,000 Washington D.C.
Good Samaritan Hospital E R addition
Brand new four story concrete structure with two levels parking and new ER on the first floor and 2nd floor shell for later use. Curved Curtain wall and masonry façade and new entrance canopy for patients and entrance for ambulances.
$24,000,000 Baltimore Md.
George Washington University - Mt. Vernon Campus
New four story concrete dormitory built into an existing dorm, demo and rebuild. New pub and dining room in another space. Synthetic Turf NCAAM soccer and softball fields, extensive earthwork with Mesa block retaining walls. Concrete parking structure with 11 tennis courts on top with a weather bubble, and sport offices and locker rooms in lower level.
26,000,000 Washington D.C.
Evangel Temple
2500 seat sanctuary with stadium style seating and a theater type stage in front. Structural Steel building with a large roofline and steeple with some intricate slab workd room for future expansion for a school. Brick façade stained glass windows and some efis.
$12,000,000 Upper Marlboro, Maryland
Safeway Eastern Distribution Center
Five new building all together a 320,000 sf perishables warehouse (refrigerated) and a 400,000 sf dry storage goods warehouse. A office support building and salvage building and a maintenance building. Warehouse and support building were structural steel and other buildings were concrete. Large amount of earth work and concrete paving for the trucks.
$60,000,000 Upper Marlboro, Maryland
Bachelors Enlisted Quarters US Naval Sta.
Two new buildings concrete foundations Slab on grade and reinforced masonry walls with precast concrete planks with light weight fill. New softball field and site work.
$6,000,000 Annapolis, Maryland
Federal Triangle Building (Ronald Reagan Building)
New concrete structure 5 stories underground and 9 above with roof and penthouse. We poured approx. 240,000 cubic yards of concrete with batch plants onsite. We had four tower cranes and three placing booms for concrete placement. Some structural steel integrated in the structure at the atrium area. Very extensive concrete work with many different challenges through out the building.
Also the solid limestone façade work which the first four floors were hand set and the upper floors were panelized and set into the inserts provided under the concrete package. The time on this job for me was four full years.
Concrete Package- $100,000,000
Façade Package- $35,000,000
!3th and Penn. Ave Washington D.C.
Federal Judiciary Building ( Thourgood Marshall Building)
New concrete structure with 4 story parking structure below grade 11 stories above with roof and penthouse. Clients were moving in when I left this one. The façade here was solid granite with a large atrium and super sky skylight above it. Nice site work package and exposed aggregate sidewalks. Children’s canter in the building and exercise area.
$100,000,000 total job.
Mass. Ave Washington D.C.
NEA Headquarters
Complete renovation of everything in the old buildings some added structural supports and all new mechanical workings. All new windows and stone façade . In the center of the building some demo work to create a new atrium for better office space inside.
$ 50,000,000 ?
16th and M St. Washington D.C.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.