A career in a company as a CRANE OPERATOR / HEAVY EQUIPMENT OPERATOR / DRIVER
NAZARIO H. HABLA
Blk 18 Lot 17 Garden Village Sta. Maria Bulacan
Mobile No.: (0921) 5739288
OBJECTIVE
A career in a company as a CRANE OPERATOR / HEAVY EQUIPMENT OPERATOR / DRIVER
QUALIFICATION SUMMARY
740 Articulate Dump Truck Grove RT 760 Grove AT 750 BE Swingaway
CAT Roller CS563 Pedestal -55 Ton Grove RT 755
Bulldozer D9N CAT Liebherr LTM Grove RT 745
Bulldozer Komatsu: DZ14 1060 Pedestal Grove RT 740
Wheel – Loader CAT:966 C P&H T750 Pedestal
Backoe CAT:Z45B Series 11 Grove Truck Mounted - Model 995120 Ton
Grove Truck Mounted - Model 880, 80 Ton
WORK EXPERIENCE
Name of Company # 1 :Atlantic, Gulf & Pacific Company of Manila Inc.
Unit 818 8th Flr. AIC Burgundy Empire Tower
ADB avenue corner Garnet St., Ortigas Center Pasig City, Philippines
Project Assigned :AG&P – GORO NICKEL PROJECT
New Caledonia
85 Avenue deu General de Gaulle-Immueble
Carcopino 3000 98800 NOUMEA
Project Profile : Goro Nickel S.A., a joint venture of Inco Ltd. Of Canada and BRGM of France,
plan to build an open-pit mine, a processing plant and a deep-sea port to recover nickel
and cobalt from laterite ore deposits in the Province Sud of the Island of New Caledonia
in the South Pacific
Area Designed : Earth Moving – DAM
______________
Date :January 7, 2001 – October 15, 2004
Position :CRANE OPERATOR
Equipment Operated :Liebherr LTM Truck Mounted Model 1060 , 60Ton
Name of Company # 2 :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :Lummus Alireza Ltd., Saudi Aramco Upgrade Project
Abu Safah Oilfield, Kingdom of Saudi Arabia
______________
Date :July 4, 1999 – November 9, 2000
Position :CRANE OPERATOR
Equipment Operated :Grove RT Model 760 , 55 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :EO / EG Kemmia Olefin Expansion Project
Jubail Saudi Arabia
______________
Date :May 12, 1998 to June 10, 1999
Position :CRANE OPERATOR
Equipment Operated :Grove Truck Mounted Model 995, 120 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :EG / EO Yanpet Expansion Project
Yanpet/ Flour Daniel/ Toyo Project
Yanbu Saudi Arabia
______________
Date :March 2, 1997 to April 17, 1998
Position :CRANE OPERATOR
Equipment Operated :Grove Truck Mounted Model 880, 80 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Shyba Pipeline - Aramco Project
Rahima rastanura , K.S.A.
______________
Date :January 12, 1996 to February 18, 1997
Position :CRANE OPERATOR
Equipment Operated :Grove AT Truck Mounted Model 750 BE, 45 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Ar- Razi 2 & 3 Project Saudi Methanol Company (Ar- Razi)
Jubail, K.S.A.
______________
Date :November 3, 1995 to December 22, 1996
Position :CRANE OPERATOR
Equipment Operated :Grove RT Model 755, 50 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Saddaf Expansion Project Electro Mechanical Construction
Jubail, K.S.A.
______________
Date :September 15, 1994 – October 23, 1995
Position :CRANE OPERATOR
Equipment Operated :P&H truck Mounted Model 750, 50 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Polyster Project Bechthel Project
Yanbu, K.S.A.
______________
Date :July 8, 1993 – August 20, 1994
Position :CRANE OPERATOR
Equipment Operated :Liebherr RT Model 1050, 50 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Hawtha Project Lummus Project
Riyadh, K.S.A.
______________
Date :May 6, 1992 to June 13, 1993
Position :CRANE OPERATOR
Equipment Operated :Grove RT Model 745, 40 Tons
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Catalyst Project
Riyadh, K.S.A.
______________
Date :March 16, 1991 to April 20, 1992
Position :CRANE OPERATOR
Equipment Operated :Wheel Loader CAT Model 966C
Bachoe CAT Model Z45B Series II
Bulldozer Komatzu Model DZ14
Name of Company :Mohammad Al- Mojil Group Saudi Arabia
Project Assigned :MMG: Binhayan Project
Saudi Plastic Company
Jubail, K.S.A.
DUTIES AND RESPONSIBILITIES
In Kingdom of Saudi Arabia I was hired by Mohammad Al-Mojil Group as Crane Operator, Heavy Equipment Operator and Driver assigned in various projects such as Catalyst Project, Hawtha Project in Riyadh, Kemmia Olefin project in Jubail, Polyster Project of Bechthel in Yanbu., Armaco Pipeline in Rahima Rastanura, Saudi Aramco Upgrade Project Abu Safah Oilfield.
-Had been contract to different companies and projects under the label of Mohammad Al Mojil Group of
Saudi Arabia.
- Working as Crane Operator in the construction of Ethylene Glycol and Ethyline Oxide and Kemmia Olefin
Expansion Project.
- Rigging and installation from light to heavy lift
- Provide check and maintenance to crane equipment assigned to my responsibility
- Perform repair and troubleshooting of simple malfunction of crane equipment
- Knowledgeable of rigging procedure and rigging signal
- Conduct training and lectures of personnel on different kinds of heavy equipment such as caterpillar, backhoe,
mobile crane, lever & groove (telescopic crane), pay loader and bulldozer.
- Prepare report of activities regarding the operation accomplished.
______________
Date :April 19, 1982 to December 18, 1983
Position :HEAVY EQUIPMENT OPERATOR
Equipment Operated :Payloader, Bulldozer, Backhoe and Crane
Name of Company # 3 :Heilit and Woerner Bau – Ag IRAQ
Operate pay loader Caterpillar Model 950, 2 cubic meter capacity for loading materials for dump truck for
backfilling and leveling our site area. Then load gravel and sand or filled up the say low in batching plant and prepare for the operator. And also operate Caterpillar Bulldozer D-8 for stock filling, pushing stock filling materials. Also assigned to operate 225 Caterpillar Backhoe for excavation or water line, drainage, pipe laying and water ground installation.
Sometimes operate grove crane 18 to 50 tons capacity on lifting different housing and road construction areas, lifting pipes of various length and diameter in pipe laying. Also include lifting of construction materials such as steel beams pre-cast gardens, concrete slabs and other-fabs for installation.
In the afternoon after work the equipment must filled up of crude oil before it garage in the morning
after leaving and going to the operation, check the engine oil, water in radiator, battery and also in water air, tires, brakes, transmission oil, lamp side mirror and horns and fill-up or replace if necessary. Also check the lubricating system, greasing all fitting for every three days so that the machine will last longer and serve the company as so many years.
______________
Date :Sepetember 1978 – October 1981
Position :HEAVY EQUIPMENT OPERATOR
Equipment Operated :Payloader, Bulldozer, Backhoe
Name of Company # 4 :C.B. Picpican Construction Philippines
Operate 225 Caterpillar backhoe for excavation of water line, drainage, pipe laying and water around
installation. Sometimes operate caterpillar bulldozer D-8 for Stock Filling, pushing stock materials and operate pay
loader 2 cubic meter capacity for loading materials for dump truck for back filling and leveling out site area.
In the afternoon or after work the equipment must filled-up of crude oil before it garage, and before
leaving and going to the operations, check the engine oil, water in radiator, battery and also in water, iar filter,
tires, brakes, transmission oil, lamps, side mirror and horns and fill up or replace if necessary. Also check the
lubricating system, greasing all fitting for every three days so that the machine will last longer and serve the
company as so many years.
PERSONAL INFORMATION
Date of Birth : May 6, 1950
Place of Birth : Trece Martirez, Casiguran Sorsogon
Nationality : Filipino
Civil Status : Married
Name of Child : Jane Kristine D. Habla
Religion : Iglesia ni Kristo
Height : 5 feet and 7 inches
Weight : 130 lbs.
S.S.S. Number : 03-1908270-6
T.I.N. : 177-316-450
NBI No. : H836N5BLAI00000
In case of emergency contact : Jane Kristine D. Habla
Blk 18 Lot 17 Garden Village
Sta. Maria Bulacan
EDUCATIONAL BACKGROUND
Secondary : 1962 – 1966
Donsol High School
Primary : 1956 – 1962
Trece Martirez High School
CHARACTER REFERENCES
MR. FLORANTE JOVEN VILLAFLOR MR. EDMON V. SANTOS
Administrative Supervisor Engineering Manager
AG&P AG&P – GORO NICKEL PROJECT EO / OG Yanpet Expansion Project
MMG, Yanbu Kingdom of Saudi Arabia
MR. E.D. McKeithan MR. EMITERIO ROSETE, JR.
EO /EG Yanpet Expansion Project Narabian Co. Ltd. Contracting Office
MMg, Yanbu, Kingdom of Saudi Arabia Aramco Yanbu , Kingdom of Saudi Arabia
MR. ALFRED D. GREINER MR. STEVE FORKINGS
Project Manager Construction Supervisor
Bugshan Stone & Webster Co. Ltd Lummus Alireza Ltd. Co.
And Handling facility Project Saudi Aramco P.M.T.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.