• Fabric and steel cord belts vulcanization.
• Reconditioning of longitudinal through cut conveyor belts
• Cover rubber (worn out) / patch
• Edge repair works
• Reconditioning of idler rollers
• Rubber lagging and pulley drums
• Erection of structural steel, conveyors etc
• Maintenance of conveyors, crushers and vibrating screens
• Replacement of bearings
EDUCATION
Bachelor of Arts Degree
Diploma in Mechanical: Industrial Trade Institute, India.
RELATED EXPERIENCE
• Worked in conveyor system, structural steel, Erection of gantries.
• Worked in many other private organizations like cement, coal washer plants etc.
MANAGEMENT EXPERIENCE
• Able to lead a team to undertake and maintain the above mentioned works.
• Supervised around 30 persons of skilled and semi skilled workers.
• Maintained accounts and budgets
• Interviewed, hired, trained and conducted performance appraisals
• Prepared monthly report
EXPERIENCE
Designation: Maintenance contractor 2007-2009
Organization: GLOBAL COAL WASHERIES
Description: This is a Coal Washery Plant, Ramagundam region in India. As Maintenance contractor, I involved with the following works:
Installation of Conveyors.
Laying of belt width up to 2000mm.
Splicing and fastening of belt joints.
Repair of belts.
Pulley Lagging.
Replacement of Rollers.
Pulleys and bearings.
Istallation of Crushers, Screens and Chutes
Entire coal handling plant maintenance.
Designation: Service contractor 1994-2006
Organization: NATIONAL THERMAL POWER CORPORATION
Description: This is a government of INDIA enterprise – A power generation plant that produces 2600 mega watts. As a contractor involved with the following works:
Replacement of conveyor belt width up to 1600mm [total length of conveyor belt on the system shall be around 30kilo meters]
Joining the belt by Fasteners, Hot Cold vulcanizing process
Training of the new belt and trial run on no load and load
Longitudinal through cut belt reconditioning by Hot and Cold process
Patch, Edge repairing of damaged belt portions
Rubber lagging of pulley
Reconditioning of Idler rollers by replacing the internal parts like bearing and other seals
Assembling the Idler frames and re-fixing on the system
Maintenance of Chutes, Crushers, Vibrating Screens, Gravity take-up units
All other related mechanical and maintenance works of Coal Handling System
Lead a team of around 30 persons of skilled, semi-skilled and un-skilled workers
Designation: Service contractor 1994-2006
Organization: SINGARENI COLLIERY COMPANY LTD.
Description: This is a coal mines company - joint venture of state government and Indian government. Nature of works under taking and successfully carried out:
Erection of new conveyor structural, Gantries, Transfer Towers, Chutes and Take-up units
Assembling of Conveyor Idlers, Pulleys, Drive units
Laying of new steel cord, fabric, solid woven conveyor belts, joining the same by fasteners, hot and cold vulcanizing process, Rubber lagging of pulley
Alignment, training, trial run on no load and load of conveyors
Maintenance and repairing of any other related mechanical works
Lubrication and replacement of bearings
Maintenance of crushers, vibrating screens
Longitudinal through cut conveyor belts of steel cord and fabric by hot & cold process and thus minimized the inventory & breaker down time of the system
Preventive maintenance of the conveyor system
Attending the brake down emergency jobs round the clock
Designation: Sr.Technician/Vulcanizer 1977-1993
Organization: FERTILIZER CORPORATION OF INDIA LIMITED
Description: This is an INDIAN government undertaking unit producing 1500 M.T Urea per day. All related works of vulcanizing, re-conditioning of belt conveyors,
Idler rollers, Rubber lagging of pulleys, gravity take up units, erection of new conveyors,
New belt laying, old belt removal, alignment & training of Conveyors.
Training of the new belt and trial run on no load and load
Longitudinal through cut belt reconditioning by Hot and Cold process
Patch, Edge repairing of damaged belt portions
Rubber lagging of pulley
Reconditioning of Idler rollers by replacing the internal parts like bearing and other seals
Assembling the Idler frames and re-fixing on the system
Maintenance of Chutes, Crushers, Vibrating Screens, Gravity take-up units
All other related mechanical and maintenance works of Coal Handling System
Lead a team of around 30 persons of skilled, semi-skilled and un-skilled workers
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.