To gain full time employment as a Survey Party Chief.
David Richard Bassett
2220 54th Street, SW
Naples, Florida 34116
(239) 465-7409
bassettrick[at]yahoo.com
WORK EXERIENCE:
Survey Party Chief – Keith and Schnars, PA
Ft. Lauderdale, Florida
Ben Hoyle (954) 837-3027
2/09 – 11/09 Survey Party Chief responsible for conducting surveys including calculations and note keeping and performing survey calculations. Some surveys I’ve been associated with: 1) Route survey including conventional and GPS methods for Florida Power and Light, Gratigny Florida, 2) Alta Survey for Acura of Pembroke Pines, Pembroke Pines, Florida, 3) Location and Topographic Surveys for engineer design, Seminole Hardrock Casino, Hollywood, Florida, 4) Cross-sections for Department of Transportation, Ft. Lauderdale, Florida, 5) Construction Layout in Broward County, Florida, and 5) Boundary, location and elevations for platting for Homestead Air Force Base Park, Homestead, Florida.
Survey Party Chief – Traylor Massman Joint Venture
Leeville, Louisiana
Barry Barnes (228) 326-2714
7/08 – 9/08 (relocated due to mandatory evacuation from impending hurricane)
Construction layout for LA-1 8-mile bridge relocation project. Duties included checking spans for camber. Set elevations on columns. Pile cap layout – horizontal and vertical. As-builts of structures. Certified in man-lift. Studies for Louisiana boater’s certificate.
Field Crew Chief - Q. Grady Minor & Associates, P.A.
Bonita Springs, Florida
Kevin Georgeson (239) 947-1144
9/06 – 2/08 (Laid off) Survey Party Chief in charge of stakeout for Downtown Streetscape Project for City of Fort Myers, Florida. Contractor, Kraft Construction. Site Superintendent, Bill Newman (239) 825-3256. Duties Performed: Download and upload files field use. Discuss scope of work with various contractors on site. Calculate plans for proper layout. Discuss with Engineer any discrepancies with plans and possible conflicts. Establish horizontal and vertical control. Check field data against plan data. Layout proper work for crew assigned to job site. Locate work for As-Built purposes as required by contract. Deliver As-Built information to PSM, PLS or RLS for mapping and signing if needed. Discuss with Draftsperson any necessary changes. Discussions with Contractor for number of prints, mylars and a disc of As-Built information as needed. Mediate with any that apply until As-Builts complete. Attend weekly Contractors Meeting. Kept track of schedules and commitments.
Field Crew Chief
Global Surveying – Naples, Florida
Rick Griggs, PLS (239) 261-4999
4/06 - 7/06 Duties Performed: Lot and house s/o, Mortgage surveys, FP&L s/o, Topographic surveys, Engineering support work and Land boundary surveys.
Survey Crew Chief
Metron Surveying & Mapping – Ft. Myers, Florida
Dennis O’Connell
1/06 - 3/06 Duties Performed: Vacant Lot Surveys, Building. Stake out, Foundations, Finals and FP&L stakeout.
Field Crew Chief
Young & Associates – Jacksonville, Florida
Spencer Young
9/05-12/05 Duties Performed: Boundary and Construction Layout
Party Crew Chief
A.J. Johns Construction Company – Jacksonville, Florida
Hank Lengfelner
5/05-9/05 Duties Performed: Acquire appropriate plans for jobs contracted (plats, updated engineering plans etc.). Discuss scope of work. Calculate plans for proper layout. Discuss with Engineer any discrepancies with plans and possible conflicts. Establish horizontal and vertical control. Check field data against plan data. Layout proper work for crew assigned to job site. Restake any restaking necessary. Locate horizontal and vertical location of work for As-Built purposes as required by contract. Deliver As-Built information to PSM, PLS or RLS for mapping and signing if needed, discuss with Draftsperson any necessary changes. Discussions with Contractor for number of prints, mylars and a disc of As-Built information as needed. Mediate with any that apply until As-Builts complete.
Field Crew Chief
Marvin R. Banks, LS – Jacksonville, Florida
(904) 641-2520
4/04-5/05 Duties Performed: Boundary, Topos, Tree Surveys, Mortgages, As-builts
32 years Field Experience 24 years Crew Chief
GPS, Robotic and conventional instruments.
Other Types of Surveys Performed include Hydrographic, Accident and Area
Drainage Studies
Dan Blythe (239) 565-2340
Kevin Georgeson (239) 860-3309
Ted Ricks (904) 620-0500
Marvin R. Banks PLS (904) 641-2520
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.