JAMES OSBURN
9053 Kay Jay Ln. (619) 561-4573 Home
Lakeside CA, 92040 (619) 456-8015 Cell
Objective
To secure employment in a successful company as a MEP Coordinator / Superintendent where I can utilize my acquired skills in the Construction Industry and be a vital asset to the company.
Experience
My education has contributed to my knowledge of drafting and the ability to understand construction documents. I have working knowledge in AutoCAD, Navisworks, Microsoft Word, Excel, and many other programs of this nature. Through my employment I have gained a large overview of the Mechanical Design & Construction Industry. I have worked on Plan Spec., Design Build as well as Design Assist. I believe my experience would be an asset to this company.
Rady’s Children’s Hospital: $40 Million HVAC
New 4-story Acute Care Pavilion 260,000 SF 154 beds. This project consisted of installation of a complete HVAC and plumbing system with up grading of the Center Plant as well as a new Generator Building.
Sharps Memorial Hospital: $27 Million HVAC
New 6-story Acute Care 316,000 SF 302 beds. This project consisted of installation of a complete HVAC and plumbing system with up grading of the Center Plant
Ontario International Airport Expansion-Contract Amount: $11.4 Million HVAC
Construction of two 2-story terminal bldg’s totaling 556,226 SF, thereby tripling the size of the airport terminals.
R.W. Johnson Pharmaceuticals
This new three-story, 122,300 SF Pharmaceutical Research, Biology and Chemistry Laboratories facility was built for Johnson & Johnson. This project consisted of installation of a complete HVAC and plumbing system including steam and clean steam.
IDEC Pharmaceuticals-Contract Amount: $6.7 Million HVAC
70,000 sf of remodel, 11,000 sf pilot manufacturing plant and 60,000 lab construction. Class 100 and classified environmental rooms. Fast track project. HVAC, steam, compressed gases, DI water and industrial waste.
Petco Ballpark, San Diego-Contract Amount: $17 Million HVAC
HVAC systems central cooling plant through an on-site heat exchanger and heated with two hot water boilers, four pumps, 37 air handlers, and 147 fan coil units. Also installed are 292 exhaust and supply fans.
UC San Diego Bioengineering building-Contract Amount: $4.7 Million HVAC
New 100,000 SF facilities consisted of a vivarium, environmental rooms, high technology library, and lecture hall. All HVAC and plumbing construction services included.
San Diego Convention Center Expansion-Contract Amount: $11 Million HVAC
Employment
11/2001-10/2008 A.O Reed & Co. San Diego, CA
Lead HVAC Detailer complete layout and detailing of HVAC shop drawings. While coordinating shop drawings with other trade as necessary. As well as reviewing submittals, writing RFI’s, reviewing Contract specifications in conjunction with Contract documents, and giving detailed Take-off’s for requested Change Orders.
6/1998-11/2001 Southland Ind. San Diego, CA
Detailing Superintendent. Oversaw the detailing of HVAC and Plumbing of the San Diego Branch Projects as well as put together the duct construction and piping submittals.
2/1995-6/1998 A.O Reed & Co. San Diego, CA
Lead HVAC Detailer complete layout and detailing of HVAC shop drawings. While coordinating shop drawings with other trade as necessary. As well as reviewing submittals, writing RFI’s, reviewing Contract specifications in conjunction with Contract documents, and giving detailed Take-off’s for requested Change Orders.
3/1990-2/1995 Southland Ind. San Diego, CA
Sheet Metal Foreman and HVAC Detailer complete layout and detailing of HVAC shop drawings. While coordinating shop drawings with other trade as necessary. As well as reviewing submittals, writing RFI’s, reviewing Contract specifications in conjunction with Contract documents, and giving detailed Take-off’s for requested Change Orders.
7/1981-3/1990 University Mechanical San Diego, CA
Sheet Metal Foreman, Detailer, and Estimator
11/1976-7/1981 Merle Strom & Assoc. San Diego, CA
HVAC Draftsmen and Designer
Education
7/1981-7/1985 San Diego City College San Diego, CA
Four years Sheet Metal Apprenticeship Sheet Metal Industry/Detailing/Energy Management
CAD Design
1971-1975 Santana H.S Santee, CA
• Overall GPA 3.8
• Honor Grad 1975
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.