i am suni kumar. Now i am working with u.k base company halcrow international consulting group in sharjah u.a.e as a survey engineer
in highway/bridge project please see my attached cv. if my qulification ang experience suitable for you please contact on my e mail address
With due respect I would like to offer my services for the post of Survey Engineer or any other position which you deemed to fit, in your Esteemed Organization. As I have necessary qualification and about 13 years of Field Experience in the field of roads and bridge works in various Establishments and Contractors who are in Infrastructure/Highways/Bridges. Presently I am working with consultant in Halcrow International partnership a Sharjah D.P.W Highways & Bridges project. I am ready to work in any where in U.A.E . So I request you to kindly consider my application for the above said post. I hope I will get the positive response as soon as possible, as I can join at the earliest.
5. Years of Experience : 14 + years Nationality: Indian
6. Area of Specialization : Highways /Bridges / Infrastructure Engineering
7. Position applied for : Survey Engineer.
8. Key Qualifications: Qualified survey Engineer having exposure to Construction Supervision and Construction management including quantity survey for the construction of major Roads/bridges and associated works. Have an overall experience of over 13 years, I the field of topography survey, Mining survey, with the use of latest survey equipments like Total Station , digital leveling , Auto leveling , in all over U.A.E, in all aspects of civil infrastructure and highways/bridges projects both with reputed contractors. This broadly encompasses construction, monitoring, and coordinating with clients, consultants, sub contractors and, site reconnaissance, surveying. My experience includes use of latest software like programming in Excel .Auto cad 2007i, Etc.
9. Education:
• Diploma : Diploma Civil
• Specialization : Civil Engineering
• Year of passing : 1995
• College/University : AL-Khateeb Polytechnic Bangalore
Technical Board of Karnataka
• Visa status : Transferable
Projects Handled
Year : APRIL 2007 TO Till NOW
1. Project Name King abadul aziz road pakage-5
AL WAHDA ROAD IMPROVEMENT (SHARJAH)
Type of project : (i) Length 1.6 k.m fly over deck slab with 37pier & Abutment
in Al wahda road
(2) Length 280.mt bridge deck slab with 6pier and Abutment
in flying saucer
(3) Length 565.010.mt Underpass in ABU SAGARA
JUNCTION
(4) Length 686.300 mt Underpass in CULTURAL SQURE
Employer : Halcrow International Partnership, U.A.E
Position Held : Survey engineer (supervision work) `
Exact Duties : Bridges Work
Office work (checking of shop drawing which is given below)
(i) setting out co-ordinate of pile centre & offset co-ordinate
of pile
(2) checking of pile cutoff level, toe level and steel top level of
pile
(3) checking the setting out co-ordinate & level for formation,
blinding , sand cement screed and pilecap bottom and top
Projects Handled
Year : February 2006 to march 2007
1. Project Name : King Faisal square interchange (Sharjah)
Employer : Halcrow International Partnership, U.A.E
Position Held : Surveyor, (supervision work)
Projects Handled
Year : April 2004 to January 2006
1. Project Name : Al-Nahadha Link Road to Junction 8E, Ring road
(Sharjah Dubai border)
Employer : Halcrow International Partnership, U.A.E.
Position Held : Surveyor, (supervision work)
Exact Duties
(i) Road Works : Taking the natural ground level of site, prepare the formation level /Sub base level /Wet mix level & Road base level /Asphalt base level /Wearing course level /Kerb stone level as per given centre line profile level
Prepare the centre line co-ordinate of road /co-ordinate of Kerb stone/co-ordinate of soil wall $ retaining wall
Pavement level control in Reinforced roads constructed using sensor pavers with highest quality standards of finishing and concrete laying etc.
(ii) Bridges Work:-Layout and level calculation of minor & major bridges fly-over/ Pile foundation/ Header beam/Bearing layout, Deck slab bottom & top / Web & Tendon layout, Soil wall, Coping beam, P -2 parapet etc
(iii) Drainage Work: - Storm water drain includes open RCC drains of width 300mm to 4.6m on tubular steel piles at the center median and on either sides of road connected by box culverts. Construction of Berm drains along the hills.
Layout and level fixing of surface water Gullies /surface drainage manhole/foul drainage manhole/Etislat manhole/gas chamber/water valve chamber/JRC chamber etc
Landscaping: - All the unpaved shoulders, islands and center median were Landscape
Biohydro seeding with cow grass cow grass.
2. From NOVEMBER- 2002 to April 2004
Employer : UE. Development India Private Limited Berhad Malaysia.
Project Name : Highway Project (UEM-ESSAR JV)
NH-4 Sira to Chitradurga, Karnataka
Position held : Senior survey Engineer
Consultants : Louis Berger International Inc
Client : National Highways Authorities of India (MORT&H)
(Cost of Project 250 Crores)
3. Year : JUNE 2000-OCT 2002
Project Name : JAPANIS BANK OF INTERNATINALCORPORATION (J B I C) Four lane to six lane of NH-5 of Jagat Pur to Chandichol section in Orissa (about 33.00 km). Cost of the project Rs-115.000 Crores
Location : Orissa.
Employer : M/S KMC Construction ltd Andhra Pradesh
Consultants : SMEC INDIA PTY LTD
Position Held : Surveyor
Exact Duties : Work involves development of Widening and strengthening of
National highways including dual carriageways with Four to six lanes, drainage work. Involved in taking OGL with total station, lay out of Major& Minor Bridges, Marking of project center line, marking the string level of Kerb & WMM,GSB bed, layout of well foundation & checking with consultant.
4. Year : March1998 to June 2000
Employer : M/s Apil Amil JV
Consultants : Freeman fox &Stup India Pvt Ltd.
Position Held : Surveyor
Exact Duties : (i) Taking the OGL, prepare the WMM, GSB, Sub grade &
Embankment layer.
(ii)Road Works: - Pavement level control in Reinforced roads constructed using sensor paver with highest quality standards of finishing and concrete laying etc.
Bridge Work: Layout of minor bridges &flyover, retaining wall, pile foundation etc
Drainage Work: - Storm water drain includes open RCC drains of width 300mm to 4.6m on tubular steel piles at the center median and on either sides of road connected by box culverts. Construction of Berm drains along the hills.
5. Year : Aug1997 to March 1998
Project Name : Haldiya Petrochemical ltd Haldiya, West Bengal
Location : West Bengal
Employer : M/s Toyo Engineering Japan
Consultants : Haldiya Petrochemical ltd
Position Held : Surveyor
Exact Duties : Layout of major foundation, vertical checking of vessel,
Column, level control of equipment foundation.
Year : 1995 April to JULY-1997
6. Project Name : Pipeline Project
a. Enron / Metgass Dabol-Hazira natural Gass Pipe line ,480km Gass Authoriyt of India (GAIL)
b. LPG Pipeline From Hassan to Coimbatore (340km)
c. Reliance (LPG) Pipeline Survey from Goa TO Hydrabad
Employer : Secon Surveys P.V.T. Ltd., Bangalore
Salary Drawn :
Expected Salary :
Date: : 09-07-09
Place : Sharjah
(Sunil Kumar Singh)
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.