I am seeking a position as a PROJECT SUPERINTENDENT with a growing company. The position should provide an opportunity for continued professional growth and challenge, as well as advancement determined by individual contribution to the overall success of the company.
STEVE ROONES
Clovis, CA 93611
OBJECTIVE:
I am seeking a position as a PROJECT SUPERINTENDENT with a growing company. The position should provide an opportunity for continued professional growth and challenge, as well as advancement determined by individual contribution to the overall success of the company.
WORK EXPERIENCE:
BRAR CONSTRUCTION and DEVELOPMENT Madera, CA 2009-2010
Project Superintendent – Worked on a new temple project for the Sikhs in Fresno. Project developed financial problems and my position had to be eliminated.
PACIFIC WEST BUILDERS Redwood City, CA 2008-10/2008
Project Superintendent – Completed Phase I of a 48 unit apartment complex complete with solar panels for low income families located in Farmersville, CA. A retail strip mall shopping center and 16 more apartments were planned for Phase II but funding was lost.
M.S. WALKER, INC Bakersfield, CA (2007-2008)
Project Superintendent- Completed construction of a 4 story wood framed SpringHill Suites hotel by Marriott in Fresno.
TARGET CONSTRUCTORS INC Madera, CA (2005 to 2007)
Project Superintendent - Completed retail projects and apartments / condominiums in Fresno.
ADVENT CONSTRUCTION Mission Viejo, CA (2003 to 2005)
Project Superintendent - Completed 2 apartment complexes located in Selma and
McFarland, CA
CLARK CONSTRUCTION CO. Fresno, CA (2001 to 2003)
Assistant Superintendent- Save Mart Center 476,000 SF, $86 million arena style events center for Fresno State University. Includes seating for 16,000 on two levels with 32 private luxury suites and full build out for sports, concessions, and media.
CENTEX ROONEY CONSTRUCTION CO. Fort Lauderdale, FL (1998 to 2001)
Area Superintendent- Coordination and supervision of subcontractors at the Federal Prison site in California City, California. Also began work at a private prison that was to be constructed in Mendota, CA, but all work was suspended by the Owner due to political reasons. Worked in Los Angeles assisting with the design phase for the demolition and replacement of the UCLA Santa Monica Medical Center. Returned to California City to add a 12,000 S.F. Court House and Administrative office areas, which was completed in less than 3 months.
RAY WILSON COMPANY Pasadena, CA (1996 to 1998)
Superintendent- Assisted lead Superintendent in the construction of 25 buildings ($90 million BP-2, 4, & 6 - ) at the California State Correctional Facility in Corcoran, CA. Responsible for overseeing carpenter and laborer crews as well as subcontractors.
SHIMIZU AMERICA CORP. Los Angeles, CA (1991 to 1996)
Project Manager / Superintendent- Completed five projects as Construction Managers, including design concept, budget estimating, formation of bid packages, permitting, and daily on site supervision of all subcontractors. Projects included a R&D facility with a clean room in San Jose for Fujitsu, an office and manufacturing facility for Menicon in Clovis, an addition for Nisshinbo's textile plant in Fresno, remodeling of tenant improvement space for two high rise office buildings in Los Angeles, nuclear medicine facility for the Oregon Health Science University in Portland, OR and an addition to a wafer crucible manufacturing facility for Toshiba in Hillsboro, OR.
MARRIOTT CORPORATION Washington, D.C. (1985 to 1991)
Project superintendent- served as on site owner's representative for new hotel construction in California, Connecticut, Florida, North Carolina, South Carolina, Texas, and Virginia. Building construction involved wood frame, block and precast plank, or c.i.p. concrete with post tensioned slabs.
RICH DIODATI GENERAL CONTRACTOR South San Francisco, CA (1982 to 1985)
Asst. Project Manager- On site assistant project manager for a sixty acre business park consisting of six concrete tilt-up buildings, two five story office towers supported by concrete piles, and a sixty slip marina.
J.C.PENNEY COMPANY INC. N.Y.C., NY (Currently located in Plano, TX) (1974 to 1982)
Project Superintendent- Coordinated and supervised all phases of construction from pre-job planning to project opening. J.C.Penney was the Construction Manager and Owner/Builder. Projects included four retail stores and two office/ warehouse facilities consisting of over two million square feet each.
EDUCATION:
CHESTER INSTITUTE FOR TECHNICAL EDUCATION
Graduated: Architectural Drafting and Design Concepts (1972 to 1974)
REFERENCES: available upon request
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.