Has been involved in Civil/Structural Steel Design Drawing, Detailing and Modeling of Hydrogen Plant in projects listed below:
• 220 MMSCFD HYDROGEN PLANT - SUNCOR VOYAGEUR PROJECT (SUNCOR) in FT. McMurry, Canada – August 2008 to February 2009
• 58 MMSCFD HYDROGEN PLANT – DETROIT PROJECT in Detroit, Michigan, USA – March 2009 to July 2009
Responsibilities:
• Produce complete set of detailed design drawings of hydrogen plant in all design area such as Ducts, Radiant Box, Penthouse, Convection modules, Stacks, Support Structures, isolated & mat foundations and Piling drawing and modular type structures and platforms, insuring project standard or AISC are satisfied with minimal supervision.
• Ensure a clashed free design by regularly checking the models above or under ground and coordination with other discipline.
• Complete 3D model of all structures and ducts and generate accurate material take off.
• Review and approved fabrication drawing to ensure detailed drawings and project codes and standard are satisfied prior to fabrication.
Dec. 2007 ~ May 2008
Onquest, Inc. / Lopez Associates and Engineers
180 E. Arrow Highway, San Dimas, Ca., 91773, USA
POSITION – Senior Civil/Structural Designer
Has been involved in Ducts drawing and Structural Steel Design Drawing & Detailing of Heater/coker in projects listed below:
• COKER PLANT - GARYVILLE PROJECT in Louisiana, USA – Dec. 2007 to Feb. 2008
• COKER PLANT - DETROIT PROJECT in Detroit, USA – March. 2008 to May 2008
Responsibilities:
• Produce complete set of detailed design drawings of heater/coker such as general arrangement steel structure, foundation, platforms and ducting drawings insuring AISC standard are satisfied with minimal input from lead engineers.
• Ensure a clashed free design by regular coordination with other discipline.
• Produce accurate material take off of all structures, stacks and ducts.
• Review and approved fabrication drawing to ensure detailed drawings and project codes and standard are satisfied prior to fabrication.
August 28, 2006 to November 30, 2007
Technip USA / IPS
Claremont, CA 91711
USA
POSITION – Civil/Structural Designer
Has been involved in Civil/Structural Steel Design Drawing, Detailing and Modeling of Hydrogen Plant in projects listed below:
 120 MMSCFD HYDROGEN PLANT – GARYVILLE PROJECT in Louisiana, USA – September 2007 to November 30 2007
 STEAM REFORMER (F-1201) - BM PROJECT (MITSUBISHI HEAVY INDUSTRIES LTD.) in Sungai Liang, Brunei – May 2007 to August 2007
 STEAM REFORMER (F-1201) - METOR EXP. PROJECT (MITSUBISHI HEAVY INDUSTRIES LTD.) in Jose Venezuela –
January 2007 to April 2007
 220 MMSCFD HYDROGEN PLANT - SUNCOR VOYAGEUR PROJECT (SUNCOR) in FT. McMurry, Canada – November 2006 to December 2006
 105 MMSCFD HYDROGEN PLANT - EDMONTON 2 PROJECT (AIR PRODUCTS) in Alberta Canada - August 28, 2006 to October 2006
Responsibilities:
• Produce complete set of detailed design drawings of hydrogen plant in all design area such as Ducts, Radiant Box, Penthouse, Convection modules, Stacks, Support Structures, foundations and Piling drawing and modular type structures and platforms, insuring project standard or AISC are satisfied with minimal supervision.
• Ensure a clashed free design by regularly checking the models above or under ground and coordination with other discipline.
• Complete 3D model of all structures and ducts and generate accurate bill of materials.
• Review and approved fabrication drawing to ensure detailed drawings and project standard are satisfied prior to fabrication.
March 11,1996 ~ August 15, 2006
JGC Phils. Inc. (formerly Technoserve International Co. Inc.) Alabang, Muntinlupa City,
Metro Manila, Philippines
POSITION –Civil Designer II
Has been involved in Structural Steel & Concrete Design, Detailing and Modeling of structures including underground facility in Oil and Gas projects listed below:
• HAWIYAH PROJECT in Saudi Arabia – JGC-December 2005 to July 2006 (Assign in Yokohama, Japan)
• RABIGH PROJECT in Saudi Arabia – JGC October to November 2005
• STEPAN PROJECT in Batangas, Philippines – September to November 2005
• DOLPHIN PROJECT in Qatar – October 2004 to October 2005
• IN AMENAS GAS PLANT PROJECT in Algeria - September 2003 to September 2004
• RIO TUBA & NICKLE BAY PROJECT in Palawan, Philippines - April 2003 to August 2003
• INSALAH GAS PLANT PROJECT in Algeria - August 2001 to March 2003
• MLNG-TIGA PROJECT in Bintulu, Malaysia - July 2000 to July 2001
• HLM PROJECT in USA - March 2000 to June 2000
• HAWIYAH GAS PLANT PROJECT in Saudi Arabia - November 1999 to February 2000
• TPU GAS PROJECT in TURKMENISTAN - January 1999 to October 1999
• PARCO REFINERY PROJECT Karachi, Pakistan - August 1998 to December 1998
• TPX ROJECT in Sriracha, Thailand - March 1998 to July 1998
• BPC PROJECT in Bataan, Philippines - January 1998 to February 1998
• RAS LAFFAN PROJECT in Qatar - July 1997 to December 1997
• SCIL PROJECT in Rizal, Philippines - April 1997 to June 1997
• BEF PROJECT in Rizal, Philippines - August 1996 to March 1997
• VIETNAM PROJECT in Vietnam - June 1996 to July 1996
• TMP PROJECT in Laguna, Philippines - March 1996 to May 1996
Responsibilities:
• Build three-dimensional (3D) model of structure such as Piperacks, Equipment structure, Platforms, Pipe Supports, Concrete structure, foundation and UG facilities such as UG pipe, manholes, trench and duct banks.
• Produce complete set of detailed design drawing of structures, foundation, and UG facility by extracting from the model or from sketches from engineer insuring project codes standard are followed.
• Coordinate with project team members and other discipline and regularly check models to ensure a sound and clash free design.
• Provide detailed and accurate material take off as required.
• Ensure that As-Built drawings are updated based on final field change sheets report and stored in the project server.
• Review and approved fabrication drawing to ensure detailed drawings and project codes and standard are satisfied prior to fabrication.
• Acts as Lead Designer on small scale project.
• Review and check design drawing prepared by Jr. designer ensuring requirements, project codes and standard are satisfied.
January 1992- December 1995
ABB Electrical Industries Ltd.
Riyadh, K.S.A
POSITION - Jr Design Engineer
Has been involved in Fabrication of metal sheets (Aluzinc, Black Iron) and Preparation of Assembly Drawing of Switchgears and Sub Station Housing.
• Responsible in preparation of mechanical Design and shop drawing needed in the production and fabrication of low voltage Switchgear and Sub Station Housing.
• Provide technical support and assistance to Sales and Marketing department in preparing tender
August 1988- December 1991
ABB Electrical Industries Ltd.
Riyadh, K.S.A
POSITION - Design Technician/Draftsman
• Prepares front layout single line diagram and assembly drawings of Low Voltage Switchgear and Sub-Station.
• Responsible in ordering all mechanical part needed for the production of Low Voltage Switchgear and Sub-Station.
EDUCATION
• BS in Civil Engineering
University of Pangasinan
Dagupan City
Philippines
SEMINARS AND TRAININGS ATTENDED
• Revit Structure 2010 Training by Autodesk. Nov. 16-18, 2009, US CAD, Los Angeles, CA, USA
• PDS Basic Training October 16~23 2000 , TIC Bldg. 1606 Trade St. Cor. Investment Dr. Madrigal Business Park, Ayala Alabang, Muntinlupa City, Philippines
• X-Steel basic and advance training for version 5.4 by TEKLA PTE Ltd., August 14~24, 2000, JPhil Bldg. 1606 Trade St. Cor. Investment Dr. Madrigal Business Park, Ayala Alabang, Muntinlupa City, Philippines
• X-Steel 6.0 Seminar for 3D Steel Detailers by TEKLA PTE Ltd. November 20 2000, Daungan Restaurant, Quezon City, Philippines
• AutoCAD R12 Basic Training ABB Electrical Industries Ltd. Training Center Riyadh K.S.A.
COMPUTER LITERACY
• Revit Structure 2010
• MS Office Suite, MS Word, MS Excel
• PDS (Plant Design System)
• Frameworks Plus
• X-Steel Version 8.2
• MicroStation
• AutoCAD
• SPR (Smart Plant Review)
PERSONAL BACKGROUND
Civil Status : Married
Fluent in English and Filipino.
Exposed in working with ISO 9001 environment.
Resourceful, Analytical Thinker, Patient, Fast Learner.
Authorized to work in USA
REFERENCES Gabe Bohm
Structural/Civil Manager
Technip USA Inc.
Tel: (909) 447-3600
Mike Brown
Engineering Manager
Onquest Inc
Tel: (909) 451-0530
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.