As a Project Superintendent for your project, Alex will effectively schedule, monitor, and inspect all work from project start to customer orientation at the project’s end. Alex will work with owners, architects, engineers, developers, contractor team members, inspectors, and government officials to bring the project in on-time, on budget, and to specification.
Credentials:
ï‚Ÿ 20+ years experience in the construction industry
ï‚Ÿ B.A. Union County College 1984 Construction Management
 C.E.S. – General Contractor’s Exam
 GSD Contracting, LLC – Fort Lauderdale, FL –Project Superintendent worked on a Westin Diplomat Resort and Spa addition / renovation. Responsible but not limited to: Scheduling for entire job, Estimating, Meeting with owners, Inspectors and Sub-contractors, Quality Control, Payroll; EFFCU – Grounds up EFFCU Credit Union in the City of Sunrise, FL; Chase Florida Bank, Davie FL 09/06 – 12/09
 Leighton McGinn Company – Riviera Beach, FL – Served as Project Superintendent for the construction of ACHA approved Medical Buildings, Government Projects and Bank of America buildings. Responsible for job-sites, project quality control, meeting with owners, superintendents, and other subcontractors 09/02 - 03/06
 Dooley Mack Constructors of South Florida – Coral Springs, FL – Served as a Sr. Project Superintendent, responsible for estimating, buy-outs, scheduling, Submittal log to Owner, Architect. Payroll authorization, Safety meetings, Site inspections. Construction of ABC Liquors, CVS Pharmacies, FAU, Construction of 10 Minute Manicure, ACHA Weston Out-Patient Surgical Center, North Lauderdale Fire Station #34 2/99 – 09/02
 MHS Contracting – Lake Worth, FL – Served as a Project Manager, Superintendent, Estimator, Safety Inspector and Quality Control, ACHA Deerfield Medical Center. Responsible for 50 banks at First Union (Wachovia) act of 1996 ADA improvements for the State of Florida Ranging from Key West to Daytona. – 2.5 million 1/94 – 1/99
 General Contractor – Coral Springs, FL – Construction of single family residential homes in NW Broward, S Broward, West Palm Beach, and Hurricane Andrew renovation and re-building 06/85 – 01/94
Experience/Education:
 Henderson Pre-school Playground at FAU – Boca Raton, FL – Complete renovation of a children’s playground located on a college campus including excavation, soil treatment, compaction, soil testing, structural walkways, and play-ground equipment installation – $550,000 – Completion Date 1999.
Experience/Healthcare
 Weston Outpatient Surgical Center – Weston, Florida – Interior Renovation and Expansion with ACHA inspections– 18,000 sf - $ 1,284,762 – completed August 2006.
 Weston Cosmetic Surgery Center – Weston, Florida - Tenant build-out of two single-story cosmetic surgery office ACHA approved, block/CMU units totaling 5957 sf. - $1,228,916, completed May 2006.
 Cambridge Medical Center – Deerfield Beach, FL – Remodel of existing recreational facility at Century Village into a fully operational medical center including x-ray and colon treatment, as well as several doctors’ offices and exam rooms. The medical center has served as a local hospital for an elderly retirement community. The facility was fast-tracked in record time, ACHA approved – $ 750,000 – Completion Date 1996.
 Hospital Medical Office Buildings – Ft Walton Beach, Atlantis, and Lake Worth, FL – Complete construction of medical office, exam rooms and Emergency treatments rooms, all ACHA approved, buildings on already occupied hospital campuses – $ 1.5 million each – Completion Date 2004.
Experience/Commercial Construction and Build-outs:
 10 Minute Manicure – Miami, Florida – 962 sf interior buildout of high-end nail salon on Biscayne Blvd, completed June 2006..
 Boca Raton Computer School – Boca Raton, FL – Interior remodel of existing store and conversion to computer school, including but not limited to low voltage wiring, interior finishes and high-end projection screen installation for technical high-school – $ 450,000 - Completion Date 1996.
 Shoppe’s of San Marco Medical Office Building – Delray Beach, FL – Complete construction of 50,000 sq. ft two-story medical office / commercial building – $ 1.6 million – Completion Date 2005.
Experience/Financial Services Offices:
 First Union National Bank – Hutchinson Island, FL – Complete remodel of an existing bank in a tourist destination without disrupting operations, worked day and night, brought building into compliance with ADA and First Union corporate standards and codes – $450,000 – Completion Date 1997.
 Washington Mutual Home Loan Center – Palm Beach County, FL – Tenant build-outs of existing ordinary office space to Washington Mutual’s new concept of home loan centers, including computer and low voltage enhancements and state-of-the-art interior design – $600,000 each – 1998.
 First Union National Bank – 50 Branches in Martin, Palm Beach, St. Lucie, and Indian River Counties, FL – Retrofits for ADA requirements to existing facilities accomplished without disrupting operations – $ 2.6 million each – 1998.
 Washington Mutual Home Loan Center – Melbourne, FL – Tenant build-out of existing ordinary office space to Washington Mutual’s new concept of home loan centers, including computer and low voltage enhancements and state-of-the-art interior design – $1.1 million – Completion Date 1999.
 Bank of America – Lake Worth, Jupiter, Weston, and West Palm Beach, FL – Complete construction of new Bank of America branch bank building from the ground up, including but not limited to site prep, underground utilities, sewer, water, building shell, and interior build-out – $ 1.2 million each – Completion in 90 days from start to finish Date 2004
 Eastern Financial Credit Union – Sunrise, Florida – Complete construction of this new facility from the ground up, including, but not limited to underground sewer installation, Storm water tie-in, SMU building with 6 drive-thru bays, and a split-face exterior, complete interior build-out, all in record time of 104 days from start to finish.1.5 Million
 Chase Banking Center – Davie Florida – One of the first Chase centers to go in Florida after WAMU fall. Ground up construction of 40,000 sq ft free standing building and site development all with-in 120 days from start to finish. 1.2 Million
Experience/Single and Multifamily Residential:
 Hurricane Andrew Restoration – Kendall, FL – Renovation, Restoration, New construction of Residential Homes destroyed during the Hurricane Andrew Devastation. Responsible for quality control, Estimating, State of Florida Emergency Management meeting Coordination, scheduling, inspections, Tenant relocation – Completion Date 1995
 Ft. Lauderdale, FL – Construction of eight-unit, four-story town-home project. Responsible for quality control, scheduling, estimating, meeting with owners and inspectors, sub-contractors, payroll authorization – $ 8.8 million - Completion Date 2006.
 The towers at Delray Beach – Delray Beach, FL – Complete construction of eight-unit, four-story condo unit in the heart of Delray Beach, including but not limited to underground, site work, eight swimming pools, eight garages, and back up generator – $ 15.6 million – Completion Date 2006.
* Custom Log Cabin Homes Construction deep in North Carolina’s Mountains ranging from
1200sq.ft to 3000sq.ft, from ground up with septic and power installation. Currently
Experience/Retail:
 ABC Liquors – North Miami Beach, FL – Out-of-the-ground construction of new liquor store in compliance with OSHA regulations, including but not limited to shell layout, supervision of block and cell pours, structural steel installation, and interior finishes – $ 450,000 – Completion Date 1999.
 CVS Pharmacies – Lauderhill, Margate, Coral Springs, Pompano Beach and Tampa, FL – New construction of 10,000 sf drugstores from the ground up including but not limited to underground construction, drainage, sewer, interior and exterior finishes ahead of scheduled completion dates – $ 1.6 million each – Completion Date 2001.
Experience/Restaurant and Hospitality:
 Ciao Cucina Restaurant – Ft. Lauderdale, FL – Out-of-the-ground construction of a prestigious restaurant for a restaurant chain – $1.4 million – Completion Date 1997.
* Westin Diplomat Resort and Spa addition / renovation of entire escalator in the Landings portion of garage. Project that should have taken 6 months was completed in 85 days - $1.7 Million, Security Shutter installation [at] Splash Bar during high occupancy season - $95,000
Current holder of : American Red Cross Adult CPR & OSHA 10hr class
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.