To apply my experience, knowledge, and leadership skills as a Superintendent. Consistently achieve optimal utilization of human and financial resources through proactive workflow planning and coordination. Effectively define and implement targeted action plans to maximize productivity, efficiency, and profitability while maintaining targeted quality assurance levels.
SKILLS
Teach/ Employ Geometry of Framing.
Design/ Layout/ Build Roof Truss Systems.
Design/ Layout/ Build Concrete Forms.
Residential Finishing Packages/ Commercial Fixture Installation
Heavy Equipment; Terrain Boom, Slap/ Rough Terrain Scissor Lift, and Rough Terrain Forklift.
Wood Carpentry and Wire Feed/ Stick Welders.
Total Station, GPS Instrument, and TDS48.
Read Blue Prints/ Grade Sheets; Site-plan, Structural, Civil, Architectural, and Topographical.
Project Planning; Commercial/ Residential.
Manage budget for supplies, equipment, and salaries.
Maintain Schedules.
Daily progress reports.
Create construction staking layouts.
Assemble field data.
Obtain field construction calculations.
CERTIFICATION
OSHA 10 hour
CPR/ First Aide
RAM Set
Terrain Boom
Slab and Rough Terrain Scissor Lift
Rough Terrain Forklift
EMPLOYMENT
Carpenter – Memmot Builders, Salt Lake City, UT 03/2010 – Present
• Single Family Homes/ sq.ft. varies
Carpenter – CLP Resources, Salt Lake City, UT 11/2009 – 03/2010
• Single Family/ 7800 sq.ft./ $1.8 million
General Foreman – Sahara Construction, Salt Lake City, UT 02/2008 – 11/2009
• Milford Hospital/ 31,000 sq.ft./ $8.0 million
• Menlove Toyota/ 110,000 sq.ft./ $16.0 million
• Mark Miller Toyota/ Gold LEED/ 69,160 sq.ft./ $11.0 million
• Rio Tinto Corporate/ Platinum LEED/ 180,000 sq.ft./ $27.0 million
Lead Carpenter/ Carpenter – CLP Resources, Salt Lake City, UT 06/2006 – 02/2008
• Rio Tinto Corporate/ Platinum LEED/ 180,000 sq.ft.
• Ogden Megaplex Theatre/ 195,000 sq.ft.
• Larry H. Miller Dodge/ 65,000 sq.ft.
• Hercules Industries/ TILT/ 110,000 sq.ft.
• Napa Balkamp/ TILT Addition/ 50,000 sq.ft.
• Eagle Business/ TILT 3 Story/ 30,000 sq.ft. per floor
Framer – Thayne Anderson Construction, Salt Lake City, UT 04/2002 – 06/2006
• Custom built homes.
• Single Family/ 1,500 – 10,000 sq.ft.
Survey Crew Chief – Peterson Engineering, Salt Lake City, UT 07/1999 – 04/2002
• Supervised in obtaining and assembling field data.
• Construction Staking and Project Research.
• Trained all new hires.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.