To procure long term position with stable construction/environmental remediation firm.
OBJECTIVE
I am seeking long term employment as construction superintendent/project manager. I am willing to travel.
SUMMARY OF QUALIFICATIONS:
Thirty five years in heavy construction industry
Eight years in the environmental industry
Heavy equipment operator
Construction foreman
Construction Superintendent
Army Corps of Engineers QCS/RMS certified
Basic layout, grades, calculations, estimating
Read construction drawings
Experience with pipe lasers, rotary laser levels and basic level instruments
Experience w/GPS layout equipment
Project Management
Project procurement
Basic computer skills/Project schedule
HEAVY EQUIPMENT OPERATION:
Hydraulic excavators
Loaders
Bull Dozers
Rubber tire backhoe
Rock and articulating all terrain dump trucks
Dump trucks (6 wheels to tri axles)
PROFESSIONAL EXPERIENCE:
8/09 – 2/10 Palmer Federal Constructors Inc.
Lawrence, MA
Superintendent/Quality Control Supervisor
Prime contractor to perform construction management, oversight, quality control, GPS layout line and grade. Direct communication w/Army Corps of Engineers, City of Easthampton
Project: Nashawannuck Pond Restoration Project – 54,000 cubic yards of pond sediment removal, transportation, disposal and placement.
5/06 – 1/09 Borggaard Construction Co.
North Grafton, MA.
Construction Superintendent
In charge of day to day operations, scheduling, sub-contractor oversight, daily reports, ordering materials, daily time sheets, reading construction drawings, lay out line and grades, etc.
Projects include:
Solidify and remove approximately 300,000 CY of lagoon sludge with cement kiln dust, removal, shape and cap land fill with a clay liner. Hudson MA.
Large 80+ acre mall site project, 1.5 million CY cut/fill, site utilities, large retaining walls, paving and several building pads. Hudson MA.
Five building industrial expansion project. North Grafton MA.
5/98 – 4/06 J Derenzo Company
Brockton, MA
Construction Superintendent – 1998 to 2001
From 1998 – 2001, I managed several crews, sub-contractor oversight, daily reports, performed basic layout for building excavation, parking garages, site utilities including as-builds, grades for parking lots and sidewalks, finish work, set-up pipe crews, site cuts and fills, ordering materials, daily time sheets, reading construction drawings, shoot grades, etc., for large commercial construction projects, ranging from $ 500,000 to
$ 2,000,000 in the metro Boston area.
Project Manager 2002 – 2006
Estimating, purchasing and buy-outs, submittals, record-keeping, invoicing, scheduling, monthly pay requisitions, project meetings with General Contractors, procurement of permits, prepared phasing plans, change orders. Project Manager for several projects in the metro Boston area, specializing in deep foundation excavation and shoring. T&D contaminated soil. Costs ranging from $100,000 to $ 8,000,000.
Projects include:
Boston University Arena and Recreation facility
Northeastern University Dormitory
Mandarin Hotel at the Prudential Center
Liberty Place residential high rise bldg
The Renovation of the Opera House
Fenway (mixed residential/commercial high rise bldg)
Maverick Gardens BHA condo complex
West Broadway for the Boston Housing Authority
Numerous private clients/private schools
Soil cleanup and treatment for future retail project
1992 – 1998 Roy F. Weston Company
West Chester, PA.
Heavy Equipment Operator, Foreman, Project Superintendent for an environmental/ engineering firm in the Construction Division.
Specializing in Military/Army Corp of Engineers and Industrial clean-up projects including sub-contractor oversight, quality control, daily reports, landfill closures, tank removals, contaminated soil remediation, water treatment plants, buried drum remediation, etc. in the Northeast region.
Projects Include:
Aberdeen Proving Grounds – Aberdeen, MD. Arsenal Clean-up, tank removals, shoreline restoration, water treatment plant, various clean up projects,
Robert Shaw Controls – Milford, CT. Liner Cap Installation
Pease Air Force Base – Portsmouth, NH Soil and tank remediation
Mobil Chemical Company – Chicopee, MA Removal of old chemical tanks and installation of new buried tanks w/ steel sheet shoring.
Army Corp of Engineers – Sudbury, MA Annex Landfill shape and cap w/liner.
Charles George Landfill and Water Treatment Plant – Tyngsboro, MA
Watertown Arsenal – Watertown, MA. Soil Remediation, bldg decontamination.
Private Client – 12 acre landfill shape and cap w/liner.
Numerous other projects
1974 – 1991 D. German Construction Co. Inc.
Milford Ct
Heavy equipment operator, laborer, pipe layer for a family owned business to 1985. I took over the company and performed day to day operations, scheduling, estimating, purchasing, supervisor, operator, subcontractors, billings, permits, etc.
Projects: Residential, light commercial site work, foundation excavation, utilities, sewer and water main lines for subdivisions, septic systems, roads, parking lots, house lots, concrete side walks, curbing.
OSHA 10hr construction safety course
Current medical card
CDL Drivers license
Class 2A hoisting engineering license
40hr OSHA Haz mat certificate (currently expired)
Army Corps of Engineers QCS/RMS certified
Recommendation letters can be provided upon request.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.