OBJECTIVE
To pursue a career as a Superintendent with a commercial construction company where my education, experience, leadership skills, and bilingual capabilities give me the opportunity to make a valuable contribution towards the success and growth of the company.
SUMMARY
Over 15 years experience in the construction industry. Completed several multi million dollar projects in the Dallas/Ft Worth area within budget and schedule. Have supervised and controlled projects ranging from 15 to 160 employees. Managed self perform crews and subcontractors. Lead project meetings including weekly safety meetings, subcontractor coordination meetings and scheduling. Exceptional communicator with exposure to different cultures. Resourceful problem solver, known for using teamwork within the trades to stay on schedule. Fluent in English and Spanish. Proficient in Microsoft Office and SureTrack.
EDUCATION
May 1994 The University of Mississippi, Bachelor of Science in Civil Engineering.
Outstanding Civil Engineer Student Award.
1986-1990 Universidad Ricardo Palma, Lima, Perú. Civil Engineering
1985 Markham College (Private College Preparatory School), Lima, Perú. Diploma
Projects completed:
• Sheraton Hotel Frisco: Cost - 12 Million. Schedule: 14 months. 4 Story Post Tension concrete structure with 126 rooms.
• Residences at Palomar: Cost - 4 Million. Schedule: 12 Months. 3 Story Flat plate concrete structure. High end residential.
• NAS Military base Parking Garage: 4 Million. Schedule: 10 Months. 2 story Pre cast garage. Capacity for 340 vehicles.
• Blue Fish/One 2 One Restaurant: Cost – 1.6 Million. Schedule: 7 Months. Wood structure.
Projects Include:
• OLY/HKS Parking Garage and retail: Cost 4 Million. Schedule: 9 Months. 4 level Post Tension concrete with retail at lower level. Capacity: 226 vehicles.
• Hyatt Hotel Renovation and Expansion at Reunion Tower: Cost: 60 Million. Schedule: 20 Months. 8 Story Steel structure. 116 Rooms.
2 levels of Exhibition Hall and 1 Level Ballroom area.
• Nokia Headquarters Office Building & Parking Garage: Cost: 36 Million. Schedule 18 Months. 7 Story Post Tension concrete.
• American Airlines Center Parking Garage: Cost 8 Million. Schedule: 10 Months. 7 levels Post tension Concrete with 6 escalators and 2 elevators.
• Grand Hyatt Hotel at DFW terminal D: Cost: 36 Million. Schedule: 20 Months. 9 Story Cast in place concrete structure with swimming pool at roof level. 310 rooms.
• CitiGroup Campus: Cost: 84 Million. Schedule: 24 Months. Three 3 Story Tilt Wall Buildings with a 1 Story Tilt wall Central Utility Plant.
Design Engineer – Ran Structural calculations for wood apartment structures, concrete and steel structures such as office buildings, tilt wall panels.
TRAINING AND CERTIFICATIONS
-OSHA 30 Hr.
-CPR.
-Trenching and Excavation.
-Confined Space.
-Supervisory Training Program.
-Storm Water Pollution Prevention Program Training.
REFERENCES
Robert Williams
Vice President, Brockette-Davis-Drake Inc. (214) 824-3647
Russell Maples
Quality Control Manager, Walton Construction (214)784-2755
James Higgins
Senior Project Manager, Walton Construction (214)347-2269
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.