Need Employment can be a good asset in constucting buildings on time within the budget.Estimating, Procurement and Project Management. Computer literate: Excel, Digitizer, Prolog and expedition.
Resume for Randall C. Campbell
954.465.9231 mobile E-Mail: ybnormal1918[at]hotmail.com
______________________________________________________________
Profile:
• Motivated Professional with intense desire in doing the job correctly and profitable.
• Dedication to detail and design.
• Specializing in effective cost construction.
• Born in Memphis, TN. Traveled throughout the world in construction related fields.
Education:
• Bishop Byrne High School – Memphis TN
• Manila International School (Graduated)
• University Of Philippines (1 year Civil Engineering)
• State Technical School at Memphis (1 year Engineering)
Affiliated Training and Certifications:
• Obtaining square and linear measurements by digitized computer based estimating.
• Generating computer type proposals and spreadsheets.
• Experienced in Prolog, Expedition, and Microsoft Project, Excel.
• OSHA 30, FDOT, Hilti, and Fork Truck Certifications.
• Qualified Employer by taken the Louisiana General Contractors Exam.
Experience:
Feb. 1st 2009 to Feb. 1st 2010
Artistic Surfaces
1591 North Powerline Rd.
Pompano Beach, Florida
Superintendent for the Miami Intermodal Center (MIC4) responsible for the implementation of 85 thousand square feet of terrazzo for Turner Construction Company. Job completed on time and with minimal punch list. (about 6 minimal cosmetic items) Documentation was generated for a sizeable delay claim and also extra work tickets (Change Orders) were submitted and paid in full. My duties also included the Estimate for the Miami Marlins Stadium for Moss / Hunt. Interior floor and Hardscapes. MIC 5 estimates for floating and Project Management for the Fort Pierce Federal Courthouse.
April 2008 to Feb. 1st 2009
Out of work due to construction industry downturn.
October 2006 to April 2008
Metro Investments / Oaks Condominiums
4151 Stirling Rd.
Dania Beach, Florida
Working for the Owner as the General Superintendent responsible for the construction of two 5-story 45 unit condominium buildings. Also initiated the 147 piling and foundation for the third condominium 80,000 square foot building.
September 2005 to September 2006
Bovis Lend Lease
80 SW 8th Street, Suite 1800
Miami, Florida 33130
Carrilon Canyon Ranch Project
6810 Collins Ave.
Miami Beach, Florida
Superintendent II duties included supervising all selective demolition and re-shoring in order to provide a new structural and architectural finishes on the existing 17 story tower. Also involved in liaison with the city of Miami Beach Building Department. Assisting RC Aluminum in providing a successful curtianwall water test to insure a design building envelope. Owner and sub-contracting meetings concerning implementation of the finishes for the project.
October 2003 to September 2005
Beauchamp Construction Company
Coral Gables Florida
Superintendent – Regent South Beach Hotel. Responsible for the dewatering, sheet piling and foundation augercast piles foundation slab and floor frame construction. This project required special construction due to the close proximity of surrounding art deco properties. An accommodation letter was received and filed from the owners of the Drake Condominiums praising the special care taken during the construction. Superintendent for the Barry University Dormitory II which was completed on time and within budget.
October 2000 to February 2003
Setai Hotel and Residences
2009 Collins Ave.
Miami Beach, Florida
Project Manager for the Setai Group which included the construction of a new 40 story condominium and 8 story Hotel. Duties included project scheduling, coordination and assisting the owner’s structural Threshold engineer. Responsible for the completion of a 1 million dollar mock up unit constructed in 2 months which included water lagoons and features with full scale room reproductions.
November 1997 to September 2000
Chris Hale Contracting Inc.
Ft. Lauderedale, Florida
Vice President and Partner of a specialty contractor providing renovation and new construction for Hotel Fountain Bleau and Daniel Electric office additions. Also completed a luxury home in Vail Colorado.
September 1996 to November 1997
Learner Renovations
St. Paul Minnesota
Superintendent – Hotel renovations such as the 2.5 million dollar Baton Rouge Hilton remodel. This hotel was completed on schedule and within the budget. I received a $2500.00 bonus for the timely completion. Wyndum Garden Hotel in Los Colinas, Texas another renovation with a
time schedule to coincide with the opening of the Texas Motor Speedway. This Project was totally renovated while remaining open and on schedule. Also traveled to Seattle, Washington and other U.S. cities to work on preliminary estimates for upcoming new work.
January 1995 to September 1996
Jakarta International Hotel Development
Jakarta, Indonesia
Employed by the Indonesian government to bring the first Jakarta Stock Exchange building on line the first building work included the certification of Fire Protection and MEP work. Also included were repairs on the building façade. The Jakarta Stock Exchange II was also constructed and correctly built by Sanyong Construction Company under my direction. Other works included the Conrad International sitework with a full scale Hotel Mock Up which were visited and approved by Conrad Hilton and Kathy Hilton in May of 1996.
March 1993 to December 1994
Akers Group International
Clinton, Mississippi
Regional Project Manager for a Design build and renovation contractor involved in lending institutions in the southeast U.S. Completed four projects ranging to $600,000. To 1.5 million dollars. The projects were totally turnkey from civil site works to fine finishes. Received bonuses and accommodations for the timely work and customer approved change orders.
January 1991 to February 1993
Ginza Golf Services Hotel Holdings / Deloitte Touche Tomatatsu Hong Kong
Project Manager on the Hong Kong Ritz Carlton. Responsible for the complete finishes of luxury
Hotel rooms and the installation of ballroom chandeliers imported from Italy to provide a complete building turnover to Hotel Operator.
January 1990 to January 1991
Flintco Construction Company
Memphis, TN
Field Engineer on the construction of the Mid America Trolley in downtown Memphis, TN.
Construction of water wall features and fountains to actual layouts of the trolley foundations. Heavy Concrete work placement and formwork placed in a busy downtown main street location. Daily emphasis was placed on public safety and the phase of work schedule.
January 1986 to November 1989
MGM Studios Disney Project / Orlando Florida
Frank Irey Construction Company was awarded several contracts regarding the construction of this theme park under the direction of Bechtel Construction Company. Electrical contract on the underground rough in pipe work for the MGM great moments in the movies building. Concrete formwork and placement for the same building. Structural Steel for Grumman’s Chinese Theater which I was involved in each of these contracts.
September 1984 to December 1985
Hensel Phelps Corporation
Greely, Colorado / Job located in Memphis, TN
Contract involved the replacement of concrete pre-cast panel façade which resulted in a Dow Chemical bonding agent failure. This project was the first of 20 different sites and at the Shelby County Justice Center and Jail in Memphis. My duties included as a Field Engineer for new panel placement of the 12 story building. This building work was completed in the winter of 1985 where interior temporary insulated fireproof walls were placed 8 feet in around the exterior walls. This project was a complete success and made the company 20 million dollars in profit and was studied by other companies, architects for 19 other projects of this type worldwide.
April 1982 to July 1984
Kelly Nelson Construction Company (currently Hensel Phelps Corporation)
Memphis, TN
Assistant Superintendent for the conversion of the Holiday Inn Rivermont to the Rivermark Condominiums.
April 1976 to April 1982
Holiday Inn Corporation
Rivermont Hotel
200 Riverside Drive
Memphis, TN
Assistant Chief Engineer on the 600 room flagship hotel for the corporation with a 3000 seat arena. During my tenure with Holiday Inns received valuable education on hotelier management and operations. Attended Holiday Inn University and district building engineering.
References:
Tanya Homlied PE Dennis Poon , Vice President
Optimus Structural Design Thornton, Tomasetti Engineers
954.483.4107 New York, New York
212.741.1300
Gary Warren
Sr. Project Manager TJ Mincer / Superintendent for Turner
Baker Concrete Construction Company at the MIC Project
305.968.1587 Miami , Florida
305.476.6034
William Sessnor
Broward County Building Depatment
Ft. Lauderdale, FL
954.658.1832
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.