3/2008 Titan Reinforcement LLC Sunny Isle's, Fla.
to 10/2009 Superintendent / Project Lead
* Project: The St. Regis
* GC - Coastal Construction
* 3 Tower / 27 stories each with podium
* Responsibility's included : procurement and
submittal of all shop drawings needed to complete
project.
* Attending weekly sub and general contractors
coordination meetings.
* Scheduling of all necessary materials and
manpower to complete all scheduled task's.
* Maintaining good relationship with GC and all
subcontractors while creating a safe work
environment
3/2006 Baker Construction LLC Broward Co., Fla.
to 3/2008 Assistant Project Superintendent
* Project: The Infinity [at] Brickell
* GC - Hunt / Ellisdon
* 52 - Story Tower Condo / 5 Story Parking Garage
* Responsibility's included : all scheduled
maintenance and jumping of tower cranes used as
well as procurement of all necessary hardware to
establish tie-backs at designated level's.
* Worked with project managers to insure accuracy
of all necessary document's and shop drawings
with any updated information applied.
* Attended all sub-contractor's meeting's and
coordination meetings to ensure all task's were
done according to agreed schedule's
* Assisted Senior Project Manager with billing of
purchased materials to ensure legitimacy for
payment.
* Scheduled all material's necessary for timely
completion of scheduled task's.
2005 Soares Da Costa LLC Miami, fla.
to 2006 Structual Superintendent
* Project: Marina Blue
* GC - Soares Da Costa LLC
* 52 Story Tower / 6 Story Parking Garage
* Responsibility's included : to obtain, correct
and to submit all necessary document's and shop
drawing's that were required to complete project
such as Rebar, Post Tension and Concrete mix's.
* To assist sub-contractors in the feild with any
problems that arise and convey these problem's to
the appropriate engineer or architect for prompt
resolution.
* Conducted meetings with all sub-contractor's to
convey the need for timely completion and
possible excelleration of scheduled task's.
2003 G&E Construction Broward Co., Fla.
to 2005 Superintendent
* Project: Park Place at Brickell
* GC - Turner Construction
* 37 Story Condo / 5 Story Parking Garage
* Responsibility's included : hiring of personnel -
whether it be foreman or laboring personnel.
* Scheduling delivery's to coincide with pour
schedule's.
* The purchasing of required tool's and material's
necessary for quick completion of scheduled
task's
* Ensuring a safe work environment as outlined by
OSHA regulations.
2002 Standard Construction Miami, Fla.
to 2003 Superintendent
* Project: The Jade
* GC - Pavarini Construction
* 53 Story Condo and Parking Garage
* Responsibility's included : Supervised all lead
and laboring personnel for Standard Construction.
* Conferred with supervisory and engineering
personnel, inspector's and supplier's of tools
and materials to resolve possible construction
problem's and improve construction method's.
2001 Standard Construction Miami, Fla.
to 2002 Superintendent
* Project: Court's of Brickell Key
* 35 Story Condo and 3 Story Parking Garage
* Responsibility's included : To advise and manage
all personnel to achieve significant
improvement's in their productivity.
* Work with general contractor to schedule
delivery's and point out possible problem's with
shop drawing's and materials that could affect
production in the feild.
2000 G&W Construction Broward Co., Fla.
to 2001 Supervisor
* Project: 555 Washington
* GC - Turner Construction
* 5 Story Office Building and Parking Garage
* Responsibility's included : Management of
personnel and materials for prompt completion all
aspect's pertaining to structual requirement;s
such as slab's (both ground and elevated) and
vertical (column's and shearwall's).
1999 G&W Construction Broward Co., Fla.
to 2000 Supervisor
* Project: FIU Science Building
* GC : CanCo
* 5 Story Labrotory Class Room's
1997 Standard Construction Miami, Fla.
to 1999 Supervisor
* Project : Hidden Bay Condominiums
* GC - GS2
* 3 Tower's /1-43 Story / 1 - 33 Story / 1 - 23
Story / 2 Story Parking Garage
1996 Standard Construction Miami, Fla.
to 1997 Supervisor
* Project : The Mutiny
* GC - Turner Construction
* 40 Story Condo and 5 Story Parking Garage
1995 Standard Construction Miami, Fla.
to 1996 Supervisor
* Project : The Millenium
* GC - GS2
* 35 Story Condo and 3 Story Parking Garage
1994 Standard Construction Miami, Fla.
to 1995 Supervisor
* Project : The Solimar
* GC - G&E Construction
* 2 Towers - 12 Story's each and Parking Garage
1993 Standard Construction Miami, Fla.
to 1994 Supervisor
* Project : The Palm's
* GC - Miller and Solomon
* 40 Story Tower and Parking Garage
Education:
* Miami Southridge Senior High Graduate (1980)
* IT Training - Microsoft Certified Professional
* Microsoft Certified Computer Technician
* 30 Hour OSHA Certification ( Baker Concrete )
* Rigging and Fall Protection training by:
Baker Concrete LLC.
Titan Reinforcement LLC.
Pavarini Construction
G & E Construction
References: Available upon request
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.