To use my 30+ years of experience in all phases of the steel fabrication & erection industry to successfully bid and manage steel projects from bid invatation through project completion. All my work is done on acost analysis basis and is run throgh an extensive excel speadsheet which I have designed for this purpos to protect my employer from the hazzards of under bidding
Charles Sackett 7503 Sienna Dr. Fort Worth, Texas 76133
817-566-3822
csackett[at]usa.com
Charles Sackett
Objective Obtain employment with an opportunity for advancement and create a financially secure environment for my family.
Experience 2009 ¡V Present Self employed contract Structural steel Estimator
2 / 2006¡X1 / 2009 Crist Industries Fort Worth, Tx.
Structural & misc. steel Estimator
„X Sold in excess of $22 million structural & misc. steel.
„X Initiated a working relationship with a customer that has over $8 billion of projects in the state of Texas alone.
„X I am the author of the original EXCEL spreadsheet estimating template used by Crist Industries.
„X Assisted in training the less experienced estimating employees
1 / 2005¡V2 / 2006 Alamo Iron Works San Antonio, Tx.
Structural & misc. steel Estimator and Project Manager
„X Adapted to Alamos¡¦ self designed software system for estimating and project mgmt.
„X Initiated, estimated, negotiated, sold and managed 3 separate projects to 3 separate Japanese Contractors for the San Antonio Toyota manufacturing plant totaling $3.5 million.
„X Estimated, negotiated, sold and managed a Flagship office project for Zackery Construction Company at their San Antonio campus totaling $765,000.
„X Assisted in training the less experienced estimating employees
1 / 2004¡V12 / 2004 Arco Metal Fab, Inc. Fort Worth, Tx.
Chief Estimator /Project Manager
1994¡V 2004 Red I Steel Fort Worth, Tx.
Chief Estimator /Project Manager
„X Responsible for the entire estimating staff , including; Structural steel take-off, estimate and bid
„X Representing the company at pre-bid conferences, bid openings and negotiating subcontracts
„X Purchasing structural steel, detailing, and ¡§buy out items¡¨
„X Manage projects from inception to completion
„X Increased sales from 1.6 million in 1994 to 4.6 million in1998
„X Produced sales in excess of 4.3 million in the first quarter of 1999
„X Maintained sales in excess of 4 million per yr. Average until 9/11/2001
„X Suggested and imitated purchase of new equipment, and new production & management
Procedures. Increasing company earnings for four consecutive years
1992¡V 1994 All Phase Inc. Albany, New York
Field Forman A.S.M.E. Fabrication Shop
Supervised crew, rebuilt and/or replaced 140 Tollbooths on the Garden State Parkway, New Jersey
1989¡V 1992 All Phase Inc. Albany, New York
Supervisor A.S.M.E. Fabrication Shop
Instrumental in doubling gross business
Supervised the construction of large prototype components for a new pulp mill in Idaho made of thousands of parts SS316, SS317, 254SMO inconell. The fabricated components measured 13¡¦-9¡¨ in diameter X 48¡¦-6¡¨ long and weighed 23 Tons each
1986-1989
Various Shipyards Pacific Northwest
Union Boiler Maker Tacoma, Washington
Layout man [at] Marine Power & Iron Portland, Oregon
Shipfitter [at] Marine Industries Norhtwest Tacoma, Washington
Welder [at] Lockport Ship Repair Portland, Oregon
1977-1986
Tacoma Boat Tacoma, Washington
Union Boiler Maker
Layout man, Loftsman, expediter, Shipfitter, Welder
Filled positions above during the construction of 3 US Coastguard Cutters Prototype W.E.M.C., 17 each US Navy Missile Frigates and Prototype A.S.C.I. at sea chemical incineration vessel.
1975-1977
General Dynamics Electric Boat Grotton, Conn.
Union Boiler Maker
Welder, X-Ray repair welder
Filled positions above during the construction of 2 US Navy prototype Trident Submarines and 3 US Navy 688 class fast attack submarines
Received commendation for being one of two welders of (600) not dismissed from the 1976 on hull inventory project.
1971-1975
Sackett & Baum Carpet Service Albany, New York
Started and managed small business
Contracted all phases of new flooring
( Carpet, Vinyl, ceramic tile, & hardwood )
1967-1971
Millers Carpet Service Albany, New York
Apprentiship, Flooring Mechanic
Excelled and became the shop forman of 3 mobile crews
Education:
23 X-Ray certifications accumulated ( During time as a welder )
1975-1977
Connecticut University (VIA) General Dynamics
Metallurgy and structural engineering / Radial design
(No Degree)
1974-1975
Hudson Valley Community College Troy, New York
Steel fitting and welding
(Graduated / Certified)
Mr. Mike McGinnis 254-582-5288
President
Steel Dimensions South, Inc.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.